Bay Area Builders
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Aug 2026
- Last 24 months
- 6 permits filed
45 permits since 2000: 39 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 938 days from filing to permit and 1094 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2016 | Expired or cancelled expired Nov 2017 | 600 Cambridge St | kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per planDetails
kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per plan | $18,000 |
| Jul 21, 2010 | Completed final sign-off Jun 2018 | 606 30th Av | vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks &Details
vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks & | $50,000 |