Back to bathroom remodel contractors
Bay Area Builders
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Aug 2026
- Last 24 months
- 6 permits filed
45 permits since 2000: 39 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 20 completed, 1 in progress, 2 expired or cancelled. Typically 14 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 118 08th Av | remodeling (2) (e) baths and (2) (e) kitchens in-kind on 2nd & 3rd fl. replace (e) windows, except those on street facing elevation. add (1) bath. add wall between garage & breezeway.Details
remodeling (2) (e) baths and (2) (e) kitchens in-kind on 2nd & 3rd fl. replace (e) windows, except those on street facing elevation. add (1) bath. add wall between garage & breezeway. | $140,000 |
| Feb 11, 2026 | Completed final sign-off May 2026 | 2706 43rd Av | remodel 2nd floor bathroom w/ shower pan. all work in kind.Details
remodel 2nd floor bathroom w/ shower pan. all work in kind. | $15,000 |
| Oct 21, 2025 | Completed final sign-off May 2026 | 2026 36th Av | remodel kitchen and 2 bathroom in kind, like for like, on the 2nd level. no change to floor layout. no change to wall layout. no structural work.Details
remodel kitchen and 2 bathroom in kind, like for like, on the 2nd level. no change to floor layout. no change to wall layout. no structural work. | $75,000 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 1449 Vallejo St | remodel hallway bathroom and laundry closet in-kind.Details
remodel hallway bathroom and laundry closet in-kind. | $20,000 |
| Mar 6, 2025 | Completed final sign-off Nov 2025 | 1463 11th Av | legalize as-built entertainment room, office, 1 bedroom, & full bath on g/f per plan.Details
legalize as-built entertainment room, office, 1 bedroom, & full bath on g/f per plan. | $8,000 |
| Dec 17, 2024 | Expired or cancelled withdrawn May 2025 | 1463 11th Av | remodel bathroom on 1st fl. street level in kindDetails
remodel bathroom on 1st fl. street level in kind | $15,000 |
| Apr 1, 2024 | Completed final sign-off May 2025 | 2838 Greenwich St | remodel for 2 (e) bathrooms for apartment. wall removal.Details
remodel for 2 (e) bathrooms for apartment. wall removal. | $42,000 |
| Jan 16, 2024 | Completed final sign-off Mar 2024 | 2451 31st Av | remodel 2nd fl bathroom in kind.Details
remodel 2nd fl bathroom in kind. | $20,000 |
| Aug 19, 2021 | Completed final sign-off Nov 2021 | 1571 31st Av | remodel 2nd fl bathroom "in kind" and remodel toilet room with sink added. add exhaust fan vent through roof and led lights.Details
remodel 2nd fl bathroom "in kind" and remodel toilet room with sink added. add exhaust fan vent through roof and led lights. | $20,000 |
| Oct 16, 2020 | Completed final sign-off Dec 2020 | 1754 20th Av | remodel bathroom in kindDetails
remodel bathroom in kind | $15,000 |
| Oct 21, 2019 | Completed final sign-off Oct 2020 | 3245 Quintara St | remodel bathroom in-kind, 5'.5" x 7' sq. ft.Details
remodel bathroom in-kind, 5'.5" x 7' sq. ft. | $15,000 |
| Apr 23, 2019 | Completed final sign-off Sep 2019 | 395 Upper Tr | demolish and renovation of 2 bathrooms in 395 upper terrace; electrical upgrade with new electrical box move one non-bearing wall 1 foot to southDetails
demolish and renovation of 2 bathrooms in 395 upper terrace; electrical upgrade with new electrical box move one non-bearing wall 1 foot to south | $38,672 |
| Sep 30, 2016 | Completed final sign-off Dec 2016 | 429 Cabrillo St | revision to 201608044242 to reconfigure bathroom fixture and door opening on 1st floor per planDetails
revision to 201608044242 to reconfigure bathroom fixture and door opening on 1st floor per plan | |
| Sep 29, 2016 | Completed final sign-off Feb 2019 | 575 42nd Av | revision to pa 2016-0608-9408 to reconfigure bathroom fixture; relocate 2 closets and add a door opening at mud room on 1st floor per planDetails
revision to pa 2016-0608-9408 to reconfigure bathroom fixture; relocate 2 closets and add a door opening at mud room on 1st floor per plan | |
| Aug 22, 2016 | Completed final sign-off Dec 2016 | 600 Cambridge St | 1) revision to app#201606018875. 2)relocation of kitchen fixtures on 2nd per plan. 3)relocation of bathroom fixtures on 3rd per plan.Details
1) revision to app#201606018875. 2)relocation of kitchen fixtures on 2nd per plan. 3)relocation of bathroom fixtures on 3rd per plan. | |
| Aug 4, 2016 | Completed final sign-off Dec 2016 | 429 Cabrillo St | 1st fl, add 1 laundry and 1 storage per plan, add 1 new bathroom on 1st floor per planDetails
1st fl, add 1 laundry and 1 storage per plan, add 1 new bathroom on 1st floor per plan | $2,000 |
| Jun 8, 2016 | Completed final sign-off Feb 2019 | 575 42nd Av | add 2 new bedrooms, one family room, one laundry room, one mud room and one new bathroom on 1st floor per planDetails
add 2 new bedrooms, one family room, one laundry room, one mud room and one new bathroom on 1st floor per plan | $20,000 |
| Jun 1, 2016 | Expired or cancelled expired Nov 2017 | 600 Cambridge St | kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per planDetails
kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per plan | $18,000 |
| May 18, 2015 | Completed final sign-off Nov 2015 | 1918 Lane St | remodel kitchen/bathroom "in-kind"Details
remodel kitchen/bathroom "in-kind" | $30,000 |
| Sep 16, 2014 | Completed final sign-off Sep 2015 | 575 42nd Av | in-fill lightwell on 1st and 2nd flrs per plan, remodel kitchen on 2nd flr, remove (e) storage, remodel (e) bath and add (n) master bathroom per plan.Details
in-fill lightwell on 1st and 2nd flrs per plan, remodel kitchen on 2nd flr, remove (e) storage, remodel (e) bath and add (n) master bathroom per plan. | $25,000 |
| Jun 16, 2011 | Completed final sign-off Sep 2011 | 1326 Greenwich St | front bldg - replacement of (5) rear porch windows, (2) kitchen windows at the rear & (1) bathroom window at rear in like-kind configuration & size. replacement window units to to double pane & .40 max u-value.Details
front bldg - replacement of (5) rear porch windows, (2) kitchen windows at the rear & (1) bathroom window at rear in like-kind configuration & size. replacement window units to to double pane & .40 max u-value. | $2,500 |
| May 11, 2011 | Completed final sign-off Sep 2011 | 1326 Greenwich St | repair/replace bathroom cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work and new replacement exhaust fan. (approx. 5'x7' bathroom). lighting changes must comply w/ cec 150(k).Details
repair/replace bathroom cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work and new replacement exhaust fan. (approx. 5'x7' bathroom). lighting changes must comply w/ cec 150(k). | $12,000 |
| Jul 21, 2010 | Completed final sign-off Jun 2018 | 606 30th Av | vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks &Details
vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks & | $50,000 |