Block 1444, lot 012
361 12th Ave
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,416 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2023 | Completed final sign-off Jan 2024 | 361 12th Av | Poly-On Security System Inc. | upgrade the (e) fire alarm system by replacing it with (1) adressable fire alarm unit (1) wireless communicator next to facu (3) addressable smoke detector (3) addressable manual pull station (2) horn strobes (1^0 low frequency horns at all residential sleeping area to comply w/ sffc 1103.7.3.1Details
upgrade the (e) fire alarm system by replacing it with (1) adressable fire alarm unit (1) wireless communicator next to facu (3) addressable smoke detector (3) addressable manual pull station (2) horn strobes (1^0 low frequency horns at all residential sleeping area to comply w/ sffc 1103.7.3.1 | $16,000 |
| Oct 7, 2019 | Expired or cancelled cancelled Jan 2026 | 361 12th Av | revision to pa 201508043330: change column size of omf at frid line b' from w12x40 to w10x54Details
revision to pa 201508043330: change column size of omf at frid line b' from w12x40 to w10x54 | ||
| Aug 4, 2015 | Completed final sign-off Sep 2020 | 361 12th Av | Synerforce Construction | wood frame soft story retrofit per sfbc chapter 34b, seismic retrofit of 1st floor as per 2012 iebc appendix a-4Details
wood frame soft story retrofit per sfbc chapter 34b, seismic retrofit of 1st floor as per 2012 iebc appendix a-4 | $50,000 |
| Jul 14, 2008 | Completed final sign-off Aug 2008 | 361 12th Av | Kenson Construction Co. | work @ apt# 1 only. remodel bathroom. replace tile, tub, lavatory, toilet, & faucet in kind. non structural.Details
work @ apt# 1 only. remodel bathroom. replace tile, tub, lavatory, toilet, & faucet in kind. non structural. | $6,400 |
| Aug 17, 2006 | Completed final sign-off Sep 2006 | 361 12th Av | Leung Construction | apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work.Details
apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work. | $4,500 |
| Mar 30, 2005 | Completed final sign-off May 2005 | 361 12th Av | Leung Construction | remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3Details
remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3 | $4,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.