Leung Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2001 to Jul 2026
- Last 24 months
- 1 permit filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 225 Sadowa St | remove siding at front and side of bldg and replace with hardie plank, approx. 1100 sf. remove and replace dryrottd framing, including studs & plywood, approx 100 sf, in kind). remove and replace 5 windows in kind, in existing openings, ufactor <0.27. repair front stair in kind <50%.Details
remove siding at front and side of bldg and replace with hardie plank, approx. 1100 sf. remove and replace dryrottd framing, including studs & plywood, approx 100 sf, in kind). remove and replace 5 windows in kind, in existing openings, ufactor <0.27. repair front stair in kind <50%. | $7,500 |
| Sep 20, 2024 | Completed final sign-off Mar 2025 | 225 Sadowa St | revision 202403288807; removed 11 windows, observe and repaired dryrot conditions at 4 windows, replaced all 11 windows that were removed.Details
revision 202403288807; removed 11 windows, observe and repaired dryrot conditions at 4 windows, replaced all 11 windows that were removed. | $1,000 |
| Mar 28, 2024 | Completed final sign-off Mar 2025 | 225 Sadowa St | replace (e) single pane windows w/ milgard windows for both sides of the house and the rear of the house. total 9 windows, replace (e) wood sidings with hardie plank sidings on both sides of the house and the rear of house. total 9 windows and approx. 1300 s.f siding.Details
replace (e) single pane windows w/ milgard windows for both sides of the house and the rear of the house. total 9 windows, replace (e) wood sidings with hardie plank sidings on both sides of the house and the rear of house. total 9 windows and approx. 1300 s.f siding. | $10,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2020 | 4013 24th St | apt 1: remodel bathroom. no alternation of walls, windows or door.Details
apt 1: remodel bathroom. no alternation of walls, windows or door. | $10,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2023 | 225 Sadowa St | comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /aDetails
comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /a | $15,000 |
| Dec 12, 2017 | Completed final sign-off Jul 2018 | 3233 Lawton St | construct a new deck w/staircase at back yard.Details
construct a new deck w/staircase at back yard. | $6,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 2079 17th Av | remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flrDetails
remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flr | $40,000 |
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 65 Russell St | bathroom remodel: replacement of tile and cabinets only.Details
bathroom remodel: replacement of tile and cabinets only. | $6,500 |
| May 21, 2015 | Completed final sign-off Jun 2015 | 1022 Bush St | to renew pa#201312164306 for final inspection only.Details
to renew pa#201312164306 for final inspection only. | |
| Apr 17, 2014 | Completed final sign-off May 2014 | 65 Scott St | unit # 5: new wall framing 10"x52" for extention of (e) fire enclosure. no penetration to (e) floor framingDetails
unit # 5: new wall framing 10"x52" for extention of (e) fire enclosure. no penetration to (e) floor framing | $2,500 |
| Dec 20, 2013 | Completed final sign-off Aug 2014 | 25 Service St | to obtain final inspection for work approved under pa # 201106097790. all work is complete.Details
to obtain final inspection for work approved under pa # 201106097790. all work is complete. | |
| Dec 16, 2013 | Completed final sign-off Jun 2015 | 1022 Bush St | comply with complaint # 200857381 - replacement of fire damaged tpe i hood and relocate wall at toilet for greater access - fire suppression system under separate permit.Details
comply with complaint # 200857381 - replacement of fire damaged tpe i hood and relocate wall at toilet for greater access - fire suppression system under separate permit. | $5,000 |
| Sep 18, 2012 | Completed final sign-off Oct 2012 | 231 Eureka St | remodel (e) bathroom (new tiles, new cabinet, new faucets). no new lighting under this permit. no new fixtures.Details
remodel (e) bathroom (new tiles, new cabinet, new faucets). no new lighting under this permit. no new fixtures. | $3,000 |
| Nov 17, 2011 | Completed final sign-off May 2012 | 146 12th Av | remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new.Details
remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new. | $46,000 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 49 Lucy St | replace brick foundation at same location with new concrete foundationDetails
replace brick foundation at same location with new concrete foundation | $30,000 |
| Aug 26, 2010 | Completed final sign-off Oct 2010 | 523 Vallejo St | remove and replace 2 existing windows at 523, 525, 527 vallejo and 24 frsno st. remove and replace stucco around the windows, remove and replace windows,paint ( total 8 windows)same for sameDetails
remove and replace 2 existing windows at 523, 525, 527 vallejo and 24 frsno st. remove and replace stucco around the windows, remove and replace windows,paint ( total 8 windows)same for same | $9,000 |
| Apr 21, 2010 | Completed final sign-off Jan 2011 | 527 Vallejo St | remove & replace (e) sheetrock for bedroom, dining rm., & office. kitchen & bathroom remodeling at 527 vallejo st. converting bedroom to dining rm.Details
remove & replace (e) sheetrock for bedroom, dining rm., & office. kitchen & bathroom remodeling at 527 vallejo st. converting bedroom to dining rm. | $25,000 |
| Dec 2, 2008 | Completed final sign-off Mar 2009 | 2062 47th Av | remodel (e) kitchen, bathroom & re-wire electrical lighting. all work on 2nd floor. add new dimmerDetails
remodel (e) kitchen, bathroom & re-wire electrical lighting. all work on 2nd floor. add new dimmer | $16,000 |
| Sep 19, 2007 | Completed final sign-off Oct 2007 | 626 Teresita Bl | replace window at front of bldg. same size same location .67 u factor max. aluminum to vinylDetails
replace window at front of bldg. same size same location .67 u factor max. aluminum to vinyl | $1,000 |
| Dec 5, 2006 | Completed final sign-off May 2007 | 775 23rd Av | repair stucco walls at both sides of front exterior stairway approx 10'x10' each side. to replace in kind.Details
repair stucco walls at both sides of front exterior stairway approx 10'x10' each side. to replace in kind. | $6,000 |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 1354 17th Av | exterior painting at front and rear of building. repair guardrail at front balconly. guardrail ht 36", rail space 4" max.Details
exterior painting at front and rear of building. repair guardrail at front balconly. guardrail ht 36", rail space 4" max. | $8,300 |
| Aug 17, 2006 | Completed final sign-off Sep 2006 | 361 12th Av | apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work.Details
apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work. | $4,500 |
| Mar 30, 2005 | Completed final sign-off May 2005 | 361 12th Av | remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3Details
remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3 | $4,500 |
| Oct 8, 2004 | Completed final sign-off Dec 2004 | 3453 18th St | replace kitchen cabinets,counters,sink,electrical, replace bath tubDetails
replace kitchen cabinets,counters,sink,electrical, replace bath tub | $7,500 |
| Oct 4, 2002 | Completed final sign-off Nov 2002 | 193 18th Av | repair stairs at rear of building, less than 50% repair. repair holes on ceiling in garage,repairDetails
repair stairs at rear of building, less than 50% repair. repair holes on ceiling in garage,repair | $1,500 |
| Dec 3, 2001 | Completed final sign-off Apr 2002 | 2059 45th Av | replace front (tw0 windows) same as kind vinyl windowDetails
replace front (tw0 windows) same as kind vinyl window | $600 |