Leung Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2001 to Jul 2026
- Last 24 months
- 1 permit filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 in progress. Typically 8 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 225 Sadowa St | remove siding at front and side of bldg and replace with hardie plank, approx. 1100 sf. remove and replace dryrottd framing, including studs & plywood, approx 100 sf, in kind). remove and replace 5 windows in kind, in existing openings, ufactor <0.27. repair front stair in kind <50%.Details
remove siding at front and side of bldg and replace with hardie plank, approx. 1100 sf. remove and replace dryrottd framing, including studs & plywood, approx 100 sf, in kind). remove and replace 5 windows in kind, in existing openings, ufactor <0.27. repair front stair in kind <50%. | $7,500 |
| Dec 12, 2017 | Completed final sign-off Jul 2018 | 3233 Lawton St | construct a new deck w/staircase at back yard.Details
construct a new deck w/staircase at back yard. | $6,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 2079 17th Av | remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flrDetails
remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flr | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2012 | 146 12th Av | remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new.Details
remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new. | $46,000 |
| Dec 5, 2006 | Completed final sign-off May 2007 | 775 23rd Av | repair stucco walls at both sides of front exterior stairway approx 10'x10' each side. to replace in kind.Details
repair stucco walls at both sides of front exterior stairway approx 10'x10' each side. to replace in kind. | $6,000 |
| Oct 4, 2002 | Completed final sign-off Nov 2002 | 193 18th Av | repair stairs at rear of building, less than 50% repair. repair holes on ceiling in garage,repairDetails
repair stairs at rear of building, less than 50% repair. repair holes on ceiling in garage,repair | $1,500 |