Back to bathroom remodel contractors
Leung Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2001 to Jul 2026
- Last 24 months
- 1 permit filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 59 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2019 | Completed final sign-off Jan 2020 | 4013 24th St | apt 1: remodel bathroom. no alternation of walls, windows or door.Details
apt 1: remodel bathroom. no alternation of walls, windows or door. | $10,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2023 | 225 Sadowa St | comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /aDetails
comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /a | $15,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 2079 17th Av | remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flrDetails
remove interior stair from 2nd flr down to grnd flr. in-fill opening & convert to laundry rm @ 2nd flr. relocate (e) kitchen/bath & convert (e) kitchen space to new bedrm at grnd flr | $40,000 |
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 65 Russell St | bathroom remodel: replacement of tile and cabinets only.Details
bathroom remodel: replacement of tile and cabinets only. | $6,500 |
| Sep 18, 2012 | Completed final sign-off Oct 2012 | 231 Eureka St | remodel (e) bathroom (new tiles, new cabinet, new faucets). no new lighting under this permit. no new fixtures.Details
remodel (e) bathroom (new tiles, new cabinet, new faucets). no new lighting under this permit. no new fixtures. | $3,000 |
| Nov 17, 2011 | Completed final sign-off May 2012 | 146 12th Av | remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new.Details
remodel (e) bathroom & kitchen, add one new bathroom @ 2nd floor. remodel (e) bathroom & kitchen. add one new bathroom @ 1st floor. construct new deck w/staircase,at rear of bldg ( size approx 7'-0" x 10'-0"), replace partial (e) foundation w/new. | $46,000 |
| Apr 21, 2010 | Completed final sign-off Jan 2011 | 527 Vallejo St | remove & replace (e) sheetrock for bedroom, dining rm., & office. kitchen & bathroom remodeling at 527 vallejo st. converting bedroom to dining rm.Details
remove & replace (e) sheetrock for bedroom, dining rm., & office. kitchen & bathroom remodeling at 527 vallejo st. converting bedroom to dining rm. | $25,000 |
| Dec 2, 2008 | Completed final sign-off Mar 2009 | 2062 47th Av | remodel (e) kitchen, bathroom & re-wire electrical lighting. all work on 2nd floor. add new dimmerDetails
remodel (e) kitchen, bathroom & re-wire electrical lighting. all work on 2nd floor. add new dimmer | $16,000 |
| Aug 17, 2006 | Completed final sign-off Sep 2006 | 361 12th Av | apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work.Details
apt #6-remodel of bathroom, replace tile, bathroom fixtures, tub, toilet, sink on 3rd floor-apt #6. no structural work. | $4,500 |
| Mar 30, 2005 | Completed final sign-off May 2005 | 361 12th Av | remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3Details
remodel bathroom,replace tile,bathroom fixtures,tub,toilet,sink on 2/f apt. #3 | $4,500 |
| Oct 8, 2004 | Completed final sign-off Dec 2004 | 3453 18th St | replace kitchen cabinets,counters,sink,electrical, replace bath tubDetails
replace kitchen cabinets,counters,sink,electrical, replace bath tub | $7,500 |