Block 0621, lot 009
1630 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 4
- Units
- 6
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 5,886 sq ft
- Lot
- 6,724 sq ft
- Zoning
- RM3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 3, 2024 | Completed final sign-off Aug 2024 | 1630 Sacramento St | Golden State Windows Inc | unit 6: 9 total windows- not street facing replace with like for like materials. 2 vinyl window replaced with anlin vinyl sliding windows.1 wooden interior bathroom window w/ tempered double hung anlin vinyl. 6 wooden replaced w/ 6 wooden double hung marvin 1 3x5. 1 4x5 dining/ 1 4x2 kitchen/Details
unit 6: 9 total windows- not street facing replace with like for like materials. 2 vinyl window replaced with anlin vinyl sliding windows.1 wooden interior bathroom window w/ tempered double hung anlin vinyl. 6 wooden replaced w/ 6 wooden double hung marvin 1 3x5. 1 4x5 dining/ 1 4x2 kitchen/ | $19,372 |
| Feb 28, 2024 | Completed final sign-off Jun 2024 | 1630 Sacramento St | Uptic Construction | unit 1; replace bathtub, rewire kitchen, new kitchen outlets and cabinets.Details
unit 1; replace bathtub, rewire kitchen, new kitchen outlets and cabinets. | $5,500 |
| Feb 9, 2024 | In progress issued Feb 2024 | 1630 Sacramento St | Russell Ono | unit#5 - replacing 9 aluminum windows with seirra pacific aluminum-clad wood windows, double hung. all windows to be two lights ( top and bootem of double hung) no grids or grills. 4 windows 20 x 48" , 2 windows 32 x 48" , 2 windows 36x48", 1 window 28x36" (revision to pa#202401264761)Details
unit#5 - replacing 9 aluminum windows with seirra pacific aluminum-clad wood windows, double hung. all windows to be two lights ( top and bootem of double hung) no grids or grills. 4 windows 20 x 48" , 2 windows 32 x 48" , 2 windows 36x48", 1 window 28x36" (revision to pa#202401264761) | |
| Jan 26, 2024 | In progress issued Jan 2024 | 1630 Sacramento St | Uptic Construction | #5: replacing 9 aluminum windows, with sierra pacific all-wood double hung windows. 6 of windows are in the front of the building (top floor unit 5), and 3 are on the sides of the building. all windows to have two lights (top and bottom of double hung windows), no grids or grills. 4 windows are 20"Details
#5: replacing 9 aluminum windows, with sierra pacific all-wood double hung windows. 6 of windows are in the front of the building (top floor unit 5), and 3 are on the sides of the building. all windows to have two lights (top and bottom of double hung windows), no grids or grills. 4 windows are 20" | $7,200 |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 1630 Sacramento St | Uptic Construction | unit 2; eplace bath tub, new kitchen cabinets/counter/sink.Details
unit 2; eplace bath tub, new kitchen cabinets/counter/sink. | $6,000 |
| Oct 3, 2023 | Completed final sign-off Feb 2024 | 1630 Sacramento St | Uptic Construction | #6: bathtub retile and replace vanity.Details
#6: bathtub retile and replace vanity. | $1,800 |
| Sep 28, 2023 | Expired or cancelled withdrawn Oct 2023 | 1630 Sacramento St | Uptic Construction | unit 6: kitchen and bathroom remodelDetails
unit 6: kitchen and bathroom remodel | $12,000 |
| Feb 13, 2019 | Never finaled issued Feb 2019, no final | 1630 Sacramento St | street spaceDetails
street space | ||
| Jun 1, 2017 | Completed final sign-off Jul 2019 | 1630 Sacramento St | Synerforce Construction | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4. | $70,000 |
| May 28, 2013 | Completed final sign-off Jun 2013 | 1630 Sacramento St | attach sheetrock (1-sheet) apt. #1 ceiling, attach sheetrock (2-sheets) hallway, attached sheetrock (1-sheet) basement, re-attached water closet, vanity and replace linoleum/tile floor bathroom apt # 1 (only on water - damaged area). use 5/8 type "x" sheetrock.Details
attach sheetrock (1-sheet) apt. #1 ceiling, attach sheetrock (2-sheets) hallway, attached sheetrock (1-sheet) basement, re-attached water closet, vanity and replace linoleum/tile floor bathroom apt # 1 (only on water - damaged area). use 5/8 type "x" sheetrock. | $2,400 | |
| Oct 1, 2009 | Never finaled issued Oct 2009, no final | 1630 Sacramento St | street spaceDetails
street space | ||
| Sep 8, 2008 | Never finaled issued Sep 2008, no final | 1630 Sacramento St | street space & sidewalk only.Details
street space & sidewalk only. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.