Wen Chao Huang
- Listed as
- architect, engineer
- Firm
- Wngs Construction
- On San Francisco permits
- Jul 2017 to Aug 2026
26 permits since 2000 (engineer on 22 permits, architect on 4 permits): 11 completed, 14 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 1210 Stanyan St | revision to pa 202501067763 & 202510308521 1st fl revised kitchen layout & add fire place @ dining; replaced front gate with entry door; relocate water heater & boiler garage; 2nd fl - reconfigure bath layout & add fireplace @ living room; extend front exterior stucco finish to 2nd fl; 3rd fl -Details
revision to pa 202501067763 & 202510308521 1st fl revised kitchen layout & add fire place @ dining; replaced front gate with entry door; relocate water heater & boiler garage; 2nd fl - reconfigure bath layout & add fireplace @ living room; extend front exterior stucco finish to 2nd fl; 3rd fl - | $30,000 | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 158 Miramar Av | rev to pa# 2024-1126-5747: revised stair designDetails
rev to pa# 2024-1126-5747: revised stair design | ||
| Jun 29, 2026 | In progress issued Aug 2026 | 2800 Balboa St | Galaxy Building Construction | unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studioDetails
unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studio | $50,000 |
| Jun 8, 2026 | Expired or cancelled cancelled Jun 2026 | 566 Castro St | revison to bpa 202602045249. replacement of (e) privacy curtains with doors at massage rooms. (all door leading to massage room shall not be equipped with locking devices per sfdph requirements) minor modifications and/or additions to mechanical, electrical and plumbing system.Details
revison to bpa 202602045249. replacement of (e) privacy curtains with doors at massage rooms. (all door leading to massage room shall not be equipped with locking devices per sfdph requirements) minor modifications and/or additions to mechanical, electrical and plumbing system. | ||
| Jun 4, 2026 | In progress issued Jun 2026 | 206 Juanita Wy | Applied General Construction Inc | basement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power roomDetails
basement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power room | $100,000 |
| Mar 27, 2026 | In progress filed Mar 2026, not yet issued | 1571 Wallace Av | to establish cannabis cultivation use from warehouse/storage. per planning approval cua 2024-010499.Details
to establish cannabis cultivation use from warehouse/storage. per planning approval cua 2024-010499. | $50,000 | |
| Jan 29, 2026 | In progress issued Feb 2026 | 1210 Stanyan St | Youda Builders Inc | revision to pa 202501067763 & 202510308521 revised structural drawing & detailsDetails
revision to pa 202501067763 & 202510308521 revised structural drawing & details | |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 62 Oneida Av | Applied General Construction Inc | 1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr.Details
1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr. | $30,000 |
| Oct 30, 2025 | In progress issued Nov 2025 | 1210 Stanyan St | Youda Builders Inc | revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco throughDetails
revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco through | $50,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 631 33rd Av | Kelun Construction | revision to pa 202503313351 replace furnaces with a mini-split hvac system; relocate water heaters for both units; reconfigure interior stair in unit 633; update window & door styles on the 2nd and 3rd floor where not visible from the street; install 2 new skylights on the 3rd floor and update theDetails
revision to pa 202503313351 replace furnaces with a mini-split hvac system; relocate water heaters for both units; reconfigure interior stair in unit 633; update window & door styles on the 2nd and 3rd floor where not visible from the street; install 2 new skylights on the 3rd floor and update the | $10,000 |
| Sep 16, 2025 | Completed final sign-off Apr 2026 | 375 Byxbee St | to comply with nov#202432156. legalized one story side deck and stairs by adding fire rated wall.Details
to comply with nov#202432156. legalized one story side deck and stairs by adding fire rated wall. | $5,000 | |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 2275 15th St | Di Vine Construction | convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr.Details
convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr. | $30,000 |
| Aug 7, 2025 | In progress issued Oct 2025 | 3253 Mission St | Acer-G Engineering | revision to pa 202212309503 reconfigure restaurant layout, including the ada restroom and interior stair caseDetails
revision to pa 202212309503 reconfigure restaurant layout, including the ada restroom and interior stair case | |
| Jun 23, 2025 | Completed final sign-off Jun 2026 | 84 Longview Ct | Di Vine Construction | add deck at rear of property.Details
add deck at rear of property. | $8,000 |
| Apr 29, 2025 | Completed final sign-off Sep 2025 | 3139 Balboa St | Kenneth Chiu | 1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom.Details
1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom. | $60,000 |
| Feb 18, 2025 | Completed final sign-off Oct 2025 | 309 Molimo Dr | Loi Electric Company | remove & replace e) deck due to dry rot. revision to 202410072385. rear deck replace in-kindDetails
remove & replace e) deck due to dry rot. revision to 202410072385. rear deck replace in-kind | $6,500 |
| Nov 26, 2024 | In progress issued Sep 2025 | 158 Miramar Av | add a deck @ rear of buildingDetails
add a deck @ rear of building | $12,000 | |
| Oct 16, 2024 | In progress issued Oct 2024 | 1571 Wallace Av | Bejarano Construction 9inc | 1571: remove existing office & restroom to accommodate 3 storage rooms; 1577: add 2 storage rooms, mep under seaparate permit. no facade changes under this permit.Details
1571: remove existing office & restroom to accommodate 3 storage rooms; 1577: add 2 storage rooms, mep under seaparate permit. no facade changes under this permit. | $30,000 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 736 Delano Av | Kl Construction Group | comply with nov #202423957 repair front facade due to car damage. footing, put back steel column. replace 20 sq ft of stucco. replace garage door in kind. reconnect water pipeDetails
comply with nov #202423957 repair front facade due to car damage. footing, put back steel column. replace 20 sq ft of stucco. replace garage door in kind. reconnect water pipe | $32,000 |
| Dec 11, 2023 | Completed final sign-off Jul 2026 | 1355 Fitzgerald Av | L & D Devlopment.Inc. | comply w/nov #202315191; remove as built grow rooms, remove as built kittchenette reconfigure restroom into ada compliance restroom no facade & structural workDetails
comply w/nov #202315191; remove as built grow rooms, remove as built kittchenette reconfigure restroom into ada compliance restroom no facade & structural work | $100,000 |
| Sep 21, 2023 | In progress issued Aug 2024 | 1510 Wallace Av | L & D Devlopment.Inc. | comply with nov 202310117. unit a: remove as-built non bearing partitions. unit c: remove as-built passaway. legalize as-built roll up dr, front access dr & restroom. mep under sep permits. no change of use on this permit. note: #a is nursery (201305308188), #b is food processing (201708104437)Details
comply with nov 202310117. unit a: remove as-built non bearing partitions. unit c: remove as-built passaway. legalize as-built roll up dr, front access dr & restroom. mep under sep permits. no change of use on this permit. note: #a is nursery (201305308188), #b is food processing (201708104437) | $8,000 |
| May 31, 2023 | In progress issued May 2024 | 2245 Judah St | W N G S Construction | enlarge storefront window. install shear wallDetails
enlarge storefront window. install shear wall | $2,500 |
| May 31, 2023 | In progress issued May 2024 | 2241 Judah St | W N G S Construction | enlarge storefront window, no structural alteration. no structural alterations.Details
enlarge storefront window, no structural alteration. no structural alterations. | $2,500 |
| May 19, 2023 | Completed final sign-off Sep 2023 | 2241 Judah St | W N G S Construction | to comply with nov 202305675. replacing the ceiling and wall gypsum board in the front seating area with equivalent materials. installing new counter space. remove non-bearing wall, and adding 3 commercial kitchen appliances and one mop sink to the 1/f restaurant space.Details
to comply with nov 202305675. replacing the ceiling and wall gypsum board in the front seating area with equivalent materials. installing new counter space. remove non-bearing wall, and adding 3 commercial kitchen appliances and one mop sink to the 1/f restaurant space. | $15,000 |
| Aug 8, 2017 | Completed final sign-off Jan 2019 | 356 Willard North St | Bay C T Construction Inc. | remove windows at 1st floor and add 8'0x7'0 garage door opening. add new curb cut on sidewalk for driveway.Details
remove windows at 1st floor and add 8'0x7'0 garage door opening. add new curb cut on sidewalk for driveway. | $20,000 |
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 481 Minna St | W N G S Construction | in manager apartment - remodel kitchen and run new electrical in living room, 180 sq.ft. in reception area- new electrical and remodel 120 sq.ft.Details
in manager apartment - remodel kitchen and run new electrical in living room, 180 sq.ft. in reception area- new electrical and remodel 120 sq.ft. | $10,000 |