Krishna Kumar
- License
- M22176
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M22176 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Ceg Engineering Inc.
- Based in
- Monterey Park
- On San Francisco permits
- Jul 2006 to Jun 2026
7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 2 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Current Construction, Pacific Wide Builders Inc., Ray Foundation Construction Inc, Team Metric Construction Corporation, Y & K Inc
- Architects
- Twen Ma (2), Earl Ammerman Iii, Michael Corbin
- Engineers
- Francis Malkham (2), Zhiping Fang (2), Brian Millet, Jatinder Singh Hayer, Jessica Yueh, Travuth Mock, Wen Chao Huang
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 4
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2026 | Expired or cancelled cancelled Jun 2026 | 566 Castro St | revison to bpa 202602045249. replacement of (e) privacy curtains with doors at massage rooms. (all door leading to massage room shall not be equipped with locking devices per sfdph requirements) minor modifications and/or additions to mechanical, electrical and plumbing system.Details
revison to bpa 202602045249. replacement of (e) privacy curtains with doors at massage rooms. (all door leading to massage room shall not be equipped with locking devices per sfdph requirements) minor modifications and/or additions to mechanical, electrical and plumbing system. | ||
| Jul 25, 2024 | Completed final sign-off Jun 2026 | 722 17th Av | Ray Foundation Construction Inc | remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater.Details
remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater. | $290,000 |
| Feb 20, 2024 | Expired or cancelled withdrawn Apr 2026 | 1450 Wallace Av | mep work to be performed to comply with nov 201841871. change of use to comply with nov 201842361. ref ti permit 201602189906 and 202304185946Details
mep work to be performed to comply with nov 201841871. change of use to comply with nov 201842361. ref ti permit 201602189906 and 202304185946 | $50,000 | |
| Oct 17, 2023 | In progress issued Jan 2025 | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec.Details
legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec. | $900,000 |
| Mar 12, 2020 | Never finaled issued Jan 2022, no final | 865 Market St | Pacific Wide Builders Inc. | unit c29 - ti for new currency exchange intl branch at westfield mall san francisco center. existing unit to be remodeled - 484 w/a proposed addition of 24 to front of unitDetails
unit c29 - ti for new currency exchange intl branch at westfield mall san francisco center. existing unit to be remodeled - 484 w/a proposed addition of 24 to front of unit | $80,000 |
| Apr 28, 2015 | Completed final sign-off Jun 2017 | 2630 Mission St | Current Construction | repair to fire damage, new; 2x studs, drywall r13 insulation, ada restroom, roof framing & ceiling. remove & replace; stairs framing, storefront, roll up doors, flooring, roofing, roof shtg - to match (e), like for like. ti work under seperate permit as per ab-017.Details
repair to fire damage, new; 2x studs, drywall r13 insulation, ada restroom, roof framing & ceiling. remove & replace; stairs framing, storefront, roll up doors, flooring, roofing, roof shtg - to match (e), like for like. ti work under seperate permit as per ab-017. | $50,000 |
| Jul 6, 2006 | Expired or cancelled expired Jun 2008 | 345 California St | client to sub lease with minor tenant improvement work for both 6/f & 7/f. suites to remain as is except for above.Details
client to sub lease with minor tenant improvement work for both 6/f & 7/f. suites to remain as is except for above. | $95,000 |