Youda Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2017 to Jan 2026
- Last 24 months
- 6 permits filed
50 permits since 2000: 40 completed, 6 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Feb 2026 | 1210 Stanyan St | revision to pa 202501067763 & 202510308521 revised structural drawing & detailsDetails
revision to pa 202501067763 & 202510308521 revised structural drawing & details | |
| Oct 30, 2025 | In progress issued Nov 2025 | 1210 Stanyan St | revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco throughDetails
revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco through | $50,000 |
| Aug 15, 2025 | Completed final sign-off May 2026 | 738 Geneva Av | revision to 202305047074; 1st flr - relocate furnace, install (n) tank-less water heater, convert wetbar into kitchenette (two burner w/o oven)Details
revision to 202305047074; 1st flr - relocate furnace, install (n) tank-less water heater, convert wetbar into kitchenette (two burner w/o oven) | |
| Mar 18, 2025 | In progress issued Mar 2025 | 235 Monticello St | replace kitchen cabinet.Details
replace kitchen cabinet. | $4,000 |
| Jan 16, 2025 | In progress issued May 2025 | 1210 Stanyan St | comply to planning nov #2022-006478enf: restore-reconfigure interior layout to 2 dwelling units. replace rear stairwell enclosure & exterior stairs due to pest infestation. convert partial space on 1/f into habitable space for unit b.Details
comply to planning nov #2022-006478enf: restore-reconfigure interior layout to 2 dwelling units. replace rear stairwell enclosure & exterior stairs due to pest infestation. convert partial space on 1/f into habitable space for unit b. | $200,000 |
| Nov 25, 2024 | In progress issued Dec 2024 | 2220 Cayuga Av | 1) add 2 new bedrooms. 1 full bathroom and 1 kitchette at 1st flr 2) replace existing furnance and water heater.Details
1) add 2 new bedrooms. 1 full bathroom and 1 kitchette at 1st flr 2) replace existing furnance and water heater. | $60,000 |
| Sep 18, 2024 | Completed final sign-off Oct 2024 | 495 Moscow St | replace wooden fence at rear yard. 6 foot max height of fence (~24 lf). replace gate. all work inkind.Details
replace wooden fence at rear yard. 6 foot max height of fence (~24 lf). replace gate. all work inkind. | $2,500 |
| Aug 2, 2024 | Completed final sign-off Nov 2025 | 1333 Geneva Av | comply with nov 202419696. remove existing as built rooms and 3 fixture bath. followed by addition of gym, office , entertainment area, kitchenette and new 3 fixture bath on 1st fl. no structural alteration under this permit.Details
comply with nov 202419696. remove existing as built rooms and 3 fixture bath. followed by addition of gym, office , entertainment area, kitchenette and new 3 fixture bath on 1st fl. no structural alteration under this permit. | $90,000 |
| Apr 24, 2024 | Completed final sign-off Apr 2024 | 1333 Geneva Av | comply w/nov 202419312: replace windows at rear 2 windows at dining room and kitchenDetails
comply w/nov 202419312: replace windows at rear 2 windows at dining room and kitchen | $3,000 |
| Mar 1, 2024 | Completed final sign-off Aug 2024 | 430 Gennessee St | 1sy/f: add 2 bedrooms, a family rm, a study rm & 2 bathrooms. add 2 burner. relocate heater, furnace at garage. no work on 2nd/f. 840 sf habitable spceDetails
1sy/f: add 2 bedrooms, a family rm, a study rm & 2 bathrooms. add 2 burner. relocate heater, furnace at garage. no work on 2nd/f. 840 sf habitable spce | $150,000 |
| Oct 27, 2023 | Completed final sign-off Jan 2024 | 555 Ashbury St | unit #1: replace toilet, tub, and sink in bathroom (inkind). replace counters and cabinets and applicances in kitchen (inkind). no other work, unless listedDetails
unit #1: replace toilet, tub, and sink in bathroom (inkind). replace counters and cabinets and applicances in kitchen (inkind). no other work, unless listed | $10,000 |
| Oct 3, 2023 | Completed final sign-off Jul 2024 | 470 Munich St | convert (e) storage room to family room at basement. re-built interior staircase from g/f down to basement & new concrete slab & wet bar.Details
convert (e) storage room to family room at basement. re-built interior staircase from g/f down to basement & new concrete slab & wet bar. | $120,000 |
| Sep 21, 2023 | In progress issued Feb 2024 | 5315 Mission St | unit c: for abe compliance program per ordinance 51-16, abe# 201911188334, replace door threshold w/max 1/2" height and 1/4" bevel, add push button to main entrance, replace door knob to lever-hdl at entry door side, adjust entry landing to 2% max slope.Details
unit c: for abe compliance program per ordinance 51-16, abe# 201911188334, replace door threshold w/max 1/2" height and 1/4" bevel, add push button to main entrance, replace door knob to lever-hdl at entry door side, adjust entry landing to 2% max slope. | $8,000 |
| Jul 31, 2023 | Never finaled issued Jul 2023, no final | 189 Hale St | replace cabinets in kitchen - kitchen remodel. no removal of wallDetails
replace cabinets in kitchen - kitchen remodel. no removal of wall | $3,000 |
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 190 Collins St | 190 b collins. replace kitchen cabinets, replace gas range.Details
190 b collins. replace kitchen cabinets, replace gas range. | $4,300 |
| Jun 5, 2023 | Completed final sign-off Sep 2023 | 190 Collins St | unit #190 b: remodel (e) bathroom (replace fixtures w/ new). replace (e) fireplace w/ new electric fire place in same opening.all work at 2/f in unit 190 b collins st.Details
unit #190 b: remodel (e) bathroom (replace fixtures w/ new). replace (e) fireplace w/ new electric fire place in same opening.all work at 2/f in unit 190 b collins st. | $28,000 |
| May 25, 2023 | Expired or cancelled suspend Nov 2023 | 1210 Stanyan St | comply w/ complaint # 202294284, 202307910, 202307955, 20230797: remodel (e) kitchen, bathroom. construct new bathroom & replace sheetrock w/ new at 3/f. relocate (e) kitchen to g/f. remodel (e) room & replace sheet rock w/ new at 2/f. new kitchen & construct new interior staircase at g/f.Details
comply w/ complaint # 202294284, 202307910, 202307955, 20230797: remodel (e) kitchen, bathroom. construct new bathroom & replace sheetrock w/ new at 3/f. relocate (e) kitchen to g/f. remodel (e) room & replace sheet rock w/ new at 2/f. new kitchen & construct new interior staircase at g/f. | $580,000 |
| May 4, 2023 | Completed final sign-off May 2026 | 738 Geneva Av | 1/f (g/f): convert existing storage rooms into 2 bedrooms and a media room. remodel (e) bathroom in kind and relocate laundry units. no structural alteration. no exterior work or facade work.Details
1/f (g/f): convert existing storage rooms into 2 bedrooms and a media room. remodel (e) bathroom in kind and relocate laundry units. no structural alteration. no exterior work or facade work. | $40,000 |
| Apr 4, 2023 | Completed final sign-off Sep 2023 | 2774 San Bruno Av | replace (5) windows and siding at front, same size same location, with double hung wood alum clad u=0.3max. maintenance of stair case- less than 50%.Details
replace (5) windows and siding at front, same size same location, with double hung wood alum clad u=0.3max. maintenance of stair case- less than 50%. | $9,000 |
| Jan 19, 2023 | Completed final sign-off Apr 2023 | 1057 Treat Av | administrative permit for pa# 202204152366 to clarify gr floor remodel to include kitchen as shown in original plans. ( adding a counter w/a sink and 2 burner range)Details
administrative permit for pa# 202204152366 to clarify gr floor remodel to include kitchen as shown in original plans. ( adding a counter w/a sink and 2 burner range) | |
| Jan 9, 2023 | Completed final sign-off Sep 2023 | 2774 San Bruno Av | revision to bpa#202209293415, replace exterior foundationDetails
revision to bpa#202209293415, replace exterior foundation | $30,000 |
| Jan 5, 2023 | Completed final sign-off Apr 2023 | 1333 Geneva Av | install smoke detector, repair electrical outlets, light switch, lighting, paint wall. install seismic braces for water heater. repair water damaged walls (2 rooms).Details
install smoke detector, repair electrical outlets, light switch, lighting, paint wall. install seismic braces for water heater. repair water damaged walls (2 rooms). | $4,000 |
| Dec 21, 2022 | Completed final sign-off Feb 2023 | 1555 California St | 1. replace door threshold w/ max 1/2" ht 1/4" bevel. 2. add new ada push buttons to business entrance. 3. replace door knob to lever at the int door. 4. adjust entry landng to 2% max slope. to applu accessible business entrance program. abe:201807231712Details
1. replace door threshold w/ max 1/2" ht 1/4" bevel. 2. add new ada push buttons to business entrance. 3. replace door knob to lever at the int door. 4. adjust entry landng to 2% max slope. to applu accessible business entrance program. abe:201807231712 | $5,000 |
| Dec 15, 2022 | Never finaled issued May 2023, no final | 1540 Polk St | to comply with the accessible business entrance program abe #202209164498. 1) replace door threshold witth max 1/2" height. 2) new 1:20 slope ramp. 3) new ada push bottom to the main business entrance.Details
to comply with the accessible business entrance program abe #202209164498. 1) replace door threshold witth max 1/2" height. 2) new 1:20 slope ramp. 3) new ada push bottom to the main business entrance. | $3,000 |
| Dec 15, 2022 | Completed final sign-off Apr 2023 | 1542 Polk St | to comply with the accessible business entrance program abe #202209164499. 1) new ada push bottom to the main business entrance. 2) replace door threshold witth max 1/2" height.Details
to comply with the accessible business entrance program abe #202209164499. 1) new ada push bottom to the main business entrance. 2) replace door threshold witth max 1/2" height. | $3,000 |
| Dec 15, 2022 | Never finaled issued Dec 2022, no final | 1544 Polk St | to comply with the accessible business entrance program abe #202209214500. ada entrance apply for technical infeasibility.Details
to comply with the accessible business entrance program abe #202209214500. ada entrance apply for technical infeasibility. | $3,000 |
| Sep 29, 2022 | Completed final sign-off Sep 2023 | 2774 San Bruno Av | 1st floor: convert extg space to have 2 bedrooms, 2 bathrooms, a famiy room with a wetbar. 2nd floor: remodel kitchen, bathroom, bedroom. add a bathroom, remodel rear deck. repair front stairs in kind. in attic floor: add 2 dormers.Details
1st floor: convert extg space to have 2 bedrooms, 2 bathrooms, a famiy room with a wetbar. 2nd floor: remodel kitchen, bathroom, bedroom. add a bathroom, remodel rear deck. repair front stairs in kind. in attic floor: add 2 dormers. | $85,000 |
| Jul 5, 2022 | Completed final sign-off May 2023 | 495 Moscow St | construct 1 bedroom, 2 full bath, & family room. all work on ground floor.Details
construct 1 bedroom, 2 full bath, & family room. all work on ground floor. | $89,000 |
| Apr 22, 2022 | Completed final sign-off Apr 2023 | 1538 Polk St | ada door operator installation. abe #202209164497Details
ada door operator installation. abe #202209164497 | $3,000 |
| Apr 22, 2022 | Completed final sign-off Dec 2023 | 820 Clement St | to comply with abe ord 51-16. replace door threshold wtih 1/2" height. add new ada push buttons to the main business entrance. ref abe 202209164494.Details
to comply with abe ord 51-16. replace door threshold wtih 1/2" height. add new ada push buttons to the main business entrance. ref abe 202209164494. | $3,000 |
| Apr 22, 2022 | Completed final sign-off Nov 2022 | 528 Grant Av | add new ada push button to the main business entrace. abe 202209214492.Details
add new ada push button to the main business entrace. abe 202209214492. | $5,000 |
| Apr 22, 2022 | Completed final sign-off Dec 2023 | 959 Taraval St | to comply with abe ord 51-16. add new ada push bottom to the main business entrance. replace door threshold with max 1/2" heights. ref abe 202209164495.Details
to comply with abe ord 51-16. add new ada push bottom to the main business entrance. replace door threshold with max 1/2" heights. ref abe 202209164495. | $3,000 |
| Apr 22, 2022 | Completed final sign-off Apr 2023 | 1040 Columbus Av | to comply with abe ord 51-16. add new ada push buttons to the main business entrance. replace door threshold with max 1/2" height. ref abe 202209164496.Details
to comply with abe ord 51-16. add new ada push buttons to the main business entrance. replace door threshold with max 1/2" height. ref abe 202209164496. | $3,000 |
| Apr 15, 2022 | Completed final sign-off Apr 2023 | 1057 Treat Av | 1st fl remodel. add 1 family room, 1 bedroom and 1 full bathroom. replace foundation.Details
1st fl remodel. add 1 family room, 1 bedroom and 1 full bathroom. replace foundation. | $90,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 407 Capistrano Av | replace 3 windows and garage doorDetails
replace 3 windows and garage door | $3,000 |
| Mar 9, 2022 | Completed final sign-off Jun 2022 | 407 Capistrano Av | 1) replacement of foundation to comply with nov#202288153. 2) revision to pa#202110211095 and 202112154494. provide engineering calculation and drawing for 2 beams on 2nd floorDetails
1) replacement of foundation to comply with nov#202288153. 2) revision to pa#202110211095 and 202112154494. provide engineering calculation and drawing for 2 beams on 2nd floor | $15,000 |
| Dec 15, 2021 | Completed final sign-off Jul 2022 | 407 Capistrano Av | 1st fl interior remodel. adding bedroom, full bath, media room, family rm with a sink and range stove.Details
1st fl interior remodel. adding bedroom, full bath, media room, family rm with a sink and range stove. | $65,000 |
| Oct 21, 2021 | Completed final sign-off Jun 2022 | 407 Capistrano Av | interior remodel on 2nd fl: relocate of kitchen and bedrooms per plan. new window and doors at rearDetails
interior remodel on 2nd fl: relocate of kitchen and bedrooms per plan. new window and doors at rear | $75,000 |
| Oct 15, 2021 | Completed final sign-off Jan 2022 | 1500 18th Av | remove/re-install side fence in kind less than 6' height (approximately 20')Details
remove/re-install side fence in kind less than 6' height (approximately 20') | $2,000 |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 1057 Treat Av | interior remodel on 2nd floor: relocation of kitchen, bathrooms, and bedrooms per plan.Details
interior remodel on 2nd floor: relocation of kitchen, bathrooms, and bedrooms per plan. | $60,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 1227 Guerrero St | revision to 2021-0614-2321. to delete concrete foundation where there is existing foundation.Details
revision to 2021-0614-2321. to delete concrete foundation where there is existing foundation. | |
| Jun 14, 2021 | Completed final sign-off Sep 2021 | 1227 Guerrero St | voluntary bldg curb replacement & voluntary seismic strengtheing at the foundation level using 75% of the prescribed forces per cebc 303.3.2Details
voluntary bldg curb replacement & voluntary seismic strengtheing at the foundation level using 75% of the prescribed forces per cebc 303.3.2 | $10,000 |
| Dec 15, 2020 | Completed final sign-off Aug 2021 | 166 Curtis St | remodel existing kitchen and remove load bearing walls at the 2nd story.Details
remodel existing kitchen and remove load bearing walls at the 2nd story. | $45,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2022 | 1500 18th Av | revision to pa # 2020-0218-4633: install (n) door from garage to home office at ground floor. (20 min fire rated w/smoke seal)Details
revision to pa # 2020-0218-4633: install (n) door from garage to home office at ground floor. (20 min fire rated w/smoke seal) | $1,000 |
| Mar 3, 2020 | Completed final sign-off Feb 2021 | 189 Hale St | decking repair less than 50% of the deck in the back in kind.to comply with complaint 202021741Details
decking repair less than 50% of the deck in the back in kind.to comply with complaint 202021741 | $2,000 |
| Feb 18, 2020 | Completed final sign-off Jan 2022 | 1500 18th Av | construct 2 bedrooms, 2 full bathrooms, media room and convert extg study room to bedroom. all work at ground floor.Details
construct 2 bedrooms, 2 full bathrooms, media room and convert extg study room to bedroom. all work at ground floor. | $89,000 |
| Apr 18, 2019 | Completed final sign-off Oct 2019 | 733 Garfield St | 1/f: remodel to add a full bathroom & a family room. comply w/complaint #201789286 & #201788341, remove stairs mold & declog landing floor drain.Details
1/f: remodel to add a full bathroom & a family room. comply w/complaint #201789286 & #201788341, remove stairs mold & declog landing floor drain. | $30,000 |
| Jan 4, 2019 | Completed final sign-off Jun 2019 | 28 Stratford Dr | 2/f: remove (e) partition wall to enlarge the (e) kitchen. replacing 2 window in kind, not visible from street. remodel the kitchen area.Details
2/f: remove (e) partition wall to enlarge the (e) kitchen. replacing 2 window in kind, not visible from street. remodel the kitchen area. | $20,000 |
| May 24, 2018 | Completed final sign-off Dec 2018 | 237 Randolph St | rev to pa# 201412163823; 1st fl. new deck at rear with fire wall 40' high, 2nd fl. new guardrailsDetails
rev to pa# 201412163823; 1st fl. new deck at rear with fire wall 40' high, 2nd fl. new guardrails | $2,500 |
| Jan 6, 2017 | Completed final sign-off Nov 2017 | 167 Ellington Av | ground floor: remodel 2 (e) bedrooms. 1 (e) half bath. construct one half bath room, storage room & laundry at ground floorDetails
ground floor: remodel 2 (e) bedrooms. 1 (e) half bath. construct one half bath room, storage room & laundry at ground floor | $36,000 |