Back to bathroom remodel contractors
Youda Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2017 to Jan 2026
- Last 24 months
- 6 permits filed
50 permits since 2000: 40 completed, 6 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 2 in progress, 1 expired or cancelled. Typically 12 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | In progress issued Nov 2025 | 1210 Stanyan St | revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco throughDetails
revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco through | $50,000 |
| Nov 25, 2024 | In progress issued Dec 2024 | 2220 Cayuga Av | 1) add 2 new bedrooms. 1 full bathroom and 1 kitchette at 1st flr 2) replace existing furnance and water heater.Details
1) add 2 new bedrooms. 1 full bathroom and 1 kitchette at 1st flr 2) replace existing furnance and water heater. | $60,000 |
| Aug 2, 2024 | Completed final sign-off Nov 2025 | 1333 Geneva Av | comply with nov 202419696. remove existing as built rooms and 3 fixture bath. followed by addition of gym, office , entertainment area, kitchenette and new 3 fixture bath on 1st fl. no structural alteration under this permit.Details
comply with nov 202419696. remove existing as built rooms and 3 fixture bath. followed by addition of gym, office , entertainment area, kitchenette and new 3 fixture bath on 1st fl. no structural alteration under this permit. | $90,000 |
| Mar 1, 2024 | Completed final sign-off Aug 2024 | 430 Gennessee St | 1sy/f: add 2 bedrooms, a family rm, a study rm & 2 bathrooms. add 2 burner. relocate heater, furnace at garage. no work on 2nd/f. 840 sf habitable spceDetails
1sy/f: add 2 bedrooms, a family rm, a study rm & 2 bathrooms. add 2 burner. relocate heater, furnace at garage. no work on 2nd/f. 840 sf habitable spce | $150,000 |
| Oct 27, 2023 | Completed final sign-off Jan 2024 | 555 Ashbury St | unit #1: replace toilet, tub, and sink in bathroom (inkind). replace counters and cabinets and applicances in kitchen (inkind). no other work, unless listedDetails
unit #1: replace toilet, tub, and sink in bathroom (inkind). replace counters and cabinets and applicances in kitchen (inkind). no other work, unless listed | $10,000 |
| Jun 5, 2023 | Completed final sign-off Sep 2023 | 190 Collins St | unit #190 b: remodel (e) bathroom (replace fixtures w/ new). replace (e) fireplace w/ new electric fire place in same opening.all work at 2/f in unit 190 b collins st.Details
unit #190 b: remodel (e) bathroom (replace fixtures w/ new). replace (e) fireplace w/ new electric fire place in same opening.all work at 2/f in unit 190 b collins st. | $28,000 |
| May 25, 2023 | Expired or cancelled suspend Nov 2023 | 1210 Stanyan St | comply w/ complaint # 202294284, 202307910, 202307955, 20230797: remodel (e) kitchen, bathroom. construct new bathroom & replace sheetrock w/ new at 3/f. relocate (e) kitchen to g/f. remodel (e) room & replace sheet rock w/ new at 2/f. new kitchen & construct new interior staircase at g/f.Details
comply w/ complaint # 202294284, 202307910, 202307955, 20230797: remodel (e) kitchen, bathroom. construct new bathroom & replace sheetrock w/ new at 3/f. relocate (e) kitchen to g/f. remodel (e) room & replace sheet rock w/ new at 2/f. new kitchen & construct new interior staircase at g/f. | $580,000 |
| May 4, 2023 | Completed final sign-off May 2026 | 738 Geneva Av | 1/f (g/f): convert existing storage rooms into 2 bedrooms and a media room. remodel (e) bathroom in kind and relocate laundry units. no structural alteration. no exterior work or facade work.Details
1/f (g/f): convert existing storage rooms into 2 bedrooms and a media room. remodel (e) bathroom in kind and relocate laundry units. no structural alteration. no exterior work or facade work. | $40,000 |
| Sep 29, 2022 | Completed final sign-off Sep 2023 | 2774 San Bruno Av | 1st floor: convert extg space to have 2 bedrooms, 2 bathrooms, a famiy room with a wetbar. 2nd floor: remodel kitchen, bathroom, bedroom. add a bathroom, remodel rear deck. repair front stairs in kind. in attic floor: add 2 dormers.Details
1st floor: convert extg space to have 2 bedrooms, 2 bathrooms, a famiy room with a wetbar. 2nd floor: remodel kitchen, bathroom, bedroom. add a bathroom, remodel rear deck. repair front stairs in kind. in attic floor: add 2 dormers. | $85,000 |
| Jul 5, 2022 | Completed final sign-off May 2023 | 495 Moscow St | construct 1 bedroom, 2 full bath, & family room. all work on ground floor.Details
construct 1 bedroom, 2 full bath, & family room. all work on ground floor. | $89,000 |
| Apr 15, 2022 | Completed final sign-off Apr 2023 | 1057 Treat Av | 1st fl remodel. add 1 family room, 1 bedroom and 1 full bathroom. replace foundation.Details
1st fl remodel. add 1 family room, 1 bedroom and 1 full bathroom. replace foundation. | $90,000 |
| Dec 15, 2021 | Completed final sign-off Jul 2022 | 407 Capistrano Av | 1st fl interior remodel. adding bedroom, full bath, media room, family rm with a sink and range stove.Details
1st fl interior remodel. adding bedroom, full bath, media room, family rm with a sink and range stove. | $65,000 |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 1057 Treat Av | interior remodel on 2nd floor: relocation of kitchen, bathrooms, and bedrooms per plan.Details
interior remodel on 2nd floor: relocation of kitchen, bathrooms, and bedrooms per plan. | $60,000 |
| Feb 18, 2020 | Completed final sign-off Jan 2022 | 1500 18th Av | construct 2 bedrooms, 2 full bathrooms, media room and convert extg study room to bedroom. all work at ground floor.Details
construct 2 bedrooms, 2 full bathrooms, media room and convert extg study room to bedroom. all work at ground floor. | $89,000 |
| Apr 18, 2019 | Completed final sign-off Oct 2019 | 733 Garfield St | 1/f: remodel to add a full bathroom & a family room. comply w/complaint #201789286 & #201788341, remove stairs mold & declog landing floor drain.Details
1/f: remodel to add a full bathroom & a family room. comply w/complaint #201789286 & #201788341, remove stairs mold & declog landing floor drain. | $30,000 |
| Jan 6, 2017 | Completed final sign-off Nov 2017 | 167 Ellington Av | ground floor: remodel 2 (e) bedrooms. 1 (e) half bath. construct one half bath room, storage room & laundry at ground floorDetails
ground floor: remodel 2 (e) bedrooms. 1 (e) half bath. construct one half bath room, storage room & laundry at ground floor | $36,000 |