Castillo Family Inc Dba Castle Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 6 permits filed
43 permits since 2000: 36 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 152 Lombard St | unit 502: replace wall and floor tiles in bathroom and half bath, 2 shower valves, relocate light switch and outlets in kitchen, replace kitchen counter tops and faucet, install hardwood floor thoughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5Details
unit 502: replace wall and floor tiles in bathroom and half bath, 2 shower valves, relocate light switch and outlets in kitchen, replace kitchen counter tops and faucet, install hardwood floor thoughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5 | $90,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 101 Lombard St | unit # 511 w 5th floor: remodel kitchen, change bath to shower. move sink to opposite side in kitchen. removal end wall to dining room and make it a ponywall. no exterior work.Details
unit # 511 w 5th floor: remodel kitchen, change bath to shower. move sink to opposite side in kitchen. removal end wall to dining room and make it a ponywall. no exterior work. | $50,000 |
| Mar 23, 2026 | Completed final sign-off Sep 2026 | 135 Beaver St | relocate accessory sink in kitchen to face kitchen side. remove and replace half bath vanity top and faucet. relocate dining room light box. install 2 new wall sconces in kitchen.Details
relocate accessory sink in kitchen to face kitchen side. remove and replace half bath vanity top and faucet. relocate dining room light box. install 2 new wall sconces in kitchen. | $25,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 156 Lombard St | to obtain final inspection for work approved under 202410183269. all work is complete.Details
to obtain final inspection for work approved under 202410183269. all work is complete. | |
| Mar 28, 2025 | Completed final sign-off Oct 2025 | 170 Pacific Av | replace existing gas buring fireplace with new one,replace marth and install new stone slab on fireplace wall add receptacles in entry closet, and bedroomDetails
replace existing gas buring fireplace with new one,replace marth and install new stone slab on fireplace wall add receptacles in entry closet, and bedroom | $8,000 |
| Oct 18, 2024 | In progress issued Oct 2024 | 156 Lombard St | unit #35; completely remodel kitchen, hall bathroom, master bathroom and half bath like for like. upgrade electrical panel. convert hall bathroom tub to shower w/new pre fabricated shower pan.Details
unit #35; completely remodel kitchen, hall bathroom, master bathroom and half bath like for like. upgrade electrical panel. convert hall bathroom tub to shower w/new pre fabricated shower pan. | $75,000 |
| Aug 29, 2024 | Completed final sign-off Sep 2025 | 150 Lombard St | unit #905: remodel kitchen like for like w/ new kitchen cabinets, countertop and flooring. remodel hall and master bathroom like for like w/ new water mixing valves, wall tile, pre-fabricated shower pan, new vanitites and tops.Details
unit #905: remodel kitchen like for like w/ new kitchen cabinets, countertop and flooring. remodel hall and master bathroom like for like w/ new water mixing valves, wall tile, pre-fabricated shower pan, new vanitites and tops. | $70,000 |
| Jan 10, 2024 | Completed final sign-off Jul 2024 | 46 Eastwood Dr | fully remodel existing kitchen like for like, install new tub and wall tile in bathroom, build new half bathroom in existing bedroom closet, and new closet space in bedroom, repair back stairs and landing.Details
fully remodel existing kitchen like for like, install new tub and wall tile in bathroom, build new half bathroom in existing bedroom closet, and new closet space in bedroom, repair back stairs and landing. | $58,000 |
| Nov 20, 2023 | Completed final sign-off Dec 2023 | 562 19th Av | convert tub to shower in same location. install new mixing valve and new tile. using a pre-fabricated shower pan.Details
convert tub to shower in same location. install new mixing valve and new tile. using a pre-fabricated shower pan. | $15,000 |
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 150 Lombard St | unit# 906: remodel 2 bathrooms like for like, new drop in-tub and new pre-fabricated shower pan; convert 3 bedroom space back to original 2 bedroom layout. partition non load bearing metal stud walls.Details
unit# 906: remodel 2 bathrooms like for like, new drop in-tub and new pre-fabricated shower pan; convert 3 bedroom space back to original 2 bedroom layout. partition non load bearing metal stud walls. | $58,000 |
| Jan 17, 2023 | Completed final sign-off Jun 2023 | 154 Lombard St | unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughoutDetails
unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughout | $58,000 |
| Aug 11, 2022 | Completed final sign-off Mar 2024 | 989 Hollister Av | revision to pa# 2021-0211-4463 to indicate rear adu building to be fully sprinklered per nfpa13dDetails
revision to pa# 2021-0211-4463 to indicate rear adu building to be fully sprinklered per nfpa13d | |
| Jul 21, 2022 | Completed final sign-off Apr 2023 | 150 Lombard St | fully remodel (2) bathrooms (keeping vanities) like for like. remodel kitchen like for like. upgrade electrical panel. no structural work and no change in floor layout.Details
fully remodel (2) bathrooms (keeping vanities) like for like. remodel kitchen like for like. upgrade electrical panel. no structural work and no change in floor layout. | $45,000 |
| Jul 21, 2022 | Completed final sign-off Feb 2023 | 111 Chestnut St | unit #205: fully remodeled 2 bathrooms (1 tub, 1 shower) like for like on all plumbing location, fully remodel kitchen with new cabinets and counter top, install new flooring through out condoDetails
unit #205: fully remodeled 2 bathrooms (1 tub, 1 shower) like for like on all plumbing location, fully remodel kitchen with new cabinets and counter top, install new flooring through out condo | $53,000 |
| Jun 9, 2022 | Completed final sign-off Nov 2022 | 156 Lombard St | upgrade lighting in entry, kitchen, dining room, 2 bedrooms, master bathroom with new recessed led lights. upgrade electrical panel and move out of closet. replace kitchen counter top and sink. install new hardwood floor in 2nd floor.Details
upgrade lighting in entry, kitchen, dining room, 2 bedrooms, master bathroom with new recessed led lights. upgrade electrical panel and move out of closet. replace kitchen counter top and sink. install new hardwood floor in 2nd floor. | $45,000 |
| Oct 26, 2021 | Completed final sign-off Oct 2022 | 101 Lombard St | unit #208w. remodel one kitchen like for like w/same layout, new cabinets and counter tops, remodel one hall bathroom and convert tub to shower, same foot print and layout, remodel one master bath like for like, new tub, showr valve w/pre fab shower pan, same footprint and layout. non structural.Details
unit #208w. remodel one kitchen like for like w/same layout, new cabinets and counter tops, remodel one hall bathroom and convert tub to shower, same foot print and layout, remodel one master bath like for like, new tub, showr valve w/pre fab shower pan, same footprint and layout. non structural. | $55,000 |
| Jun 18, 2021 | Completed final sign-off Jul 2021 | 385 10th St | install new hardie siding on north facing wall. about 2,450 squarefeet. new flashing cap at roofs edge. visible from street.Details
install new hardie siding on north facing wall. about 2,450 squarefeet. new flashing cap at roofs edge. visible from street. | $20,000 |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 152 Lombard St | remodel kitchen like for like with new cabinets, countertops. replace hall bath shower/tub conrol valve (keeping tub). replace 650 sqft of hardwood floor. upgrade electrical panel.Details
remodel kitchen like for like with new cabinets, countertops. replace hall bath shower/tub conrol valve (keeping tub). replace 650 sqft of hardwood floor. upgrade electrical panel. | $45,000 |
| Mar 11, 2021 | Completed final sign-off May 2021 | 46 Eastwood Dr | replace rotted front pergola post. repair rotted boards at front and replace about 80 sqft of stucco. rebuilding to match existing post.Details
replace rotted front pergola post. repair rotted boards at front and replace about 80 sqft of stucco. rebuilding to match existing post. | $9,000 |
| Feb 11, 2021 | Completed final sign-off Mar 2024 | 989 Hollister Av | to erect a type-v, 1-story single family adu in rear of (e) bldg per adu ordinance 162-17.Details
to erect a type-v, 1-story single family adu in rear of (e) bldg per adu ordinance 162-17. | $40,000 |
| Feb 2, 2021 | Completed final sign-off Feb 2021 | 3121 Franklin St | ref pa 202101293615 adding to scope of work. additional replacement of 2 windows w/ marvin wood/alum clad (in condo 3123) not visible from street. replace about 96 sqft of drywall in ground floor common hall to yard.Details
ref pa 202101293615 adding to scope of work. additional replacement of 2 windows w/ marvin wood/alum clad (in condo 3123) not visible from street. replace about 96 sqft of drywall in ground floor common hall to yard. | $4,000 |
| Jan 29, 2021 | Completed final sign-off Feb 2021 | 3121 Franklin St | remove and replace rohed wood siding with in like cedar siding at rear of bldg. about 1500 sq ft. remove and replace 5 windows at rear and 3 at front of bldg with new marvin alum cladding windows (3123)Details
remove and replace rohed wood siding with in like cedar siding at rear of bldg. about 1500 sq ft. remove and replace 5 windows at rear and 3 at front of bldg with new marvin alum cladding windows (3123) | $45,000 |
| Jul 27, 2020 | Completed final sign-off Sep 2020 | 3121 Franklin St | remove roted wood siding about 1,000 sq feet. wood siding only, visible from street.Details
remove roted wood siding about 1,000 sq feet. wood siding only, visible from street. | $50,000 |
| Jul 27, 2020 | Completed final sign-off Mar 2021 | 150 Lombard St | remodel kitchen like for like remodel master bath like for like,remodel hall bath like for like, upgrade electriacl panel.Details
remodel kitchen like for like remodel master bath like for like,remodel hall bath like for like, upgrade electriacl panel. | $90,000 |
| Jan 23, 2020 | Completed final sign-off Sep 2020 | 152 Lombard St | remodel 2 bathrooms like for like, new tile, tub, pedestal sink, shower pan (pre-fab), upgrade electrical panel. maher naDetails
remodel 2 bathrooms like for like, new tile, tub, pedestal sink, shower pan (pre-fab), upgrade electrical panel. maher na | $60,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2020 | 150 Lombard St | unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windowsDetails
unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windows | $50,000 |
| May 23, 2019 | Completed final sign-off Aug 2019 | 101 Lombard St | #10e: due to wager damage rebuild bathroom, tile, vanity, toilet, kitchen cabinets, counter top, sink, faucet, 56 sqft kitchen, 78 sqft bathroom.Details
#10e: due to wager damage rebuild bathroom, tile, vanity, toilet, kitchen cabinets, counter top, sink, faucet, 56 sqft kitchen, 78 sqft bathroom. | $50,000 |
| Jun 7, 2017 | Completed final sign-off Aug 2017 | 3215 Jackson St | dry rot repair at corner of building. top near roof line, like for like. repair stucco at corner.Details
dry rot repair at corner of building. top near roof line, like for like. repair stucco at corner. | $12,000 |
| Nov 9, 2016 | Completed final sign-off Feb 2017 | 2058 45th Av | to comply with complaint 201641271,kitchen replace kitchen cabinets, & countertops bathroom replace bathorom vanity floor & wall tile, replace dry rot near front window & basement, replace 2 front window aluminum clad repalce a portion exterior stucco 20 25ftDetails
to comply with complaint 201641271,kitchen replace kitchen cabinets, & countertops bathroom replace bathorom vanity floor & wall tile, replace dry rot near front window & basement, replace 2 front window aluminum clad repalce a portion exterior stucco 20 25ft | $12,000 |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 152 Lombard St | revision to pa#201609157890, remove non load bearing wall to create pony wall n/a maher ord. 155-13Details
revision to pa#201609157890, remove non load bearing wall to create pony wall n/a maher ord. 155-13 | $200 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 152 Lombard St | unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification.Details
unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification. | $25,000 |
| Sep 14, 2016 | Completed final sign-off Nov 2016 | 3107 Franklin St | repair rotted deck joist and decking as needed. remove and replace bedroom door leading to deck with same size door.Details
repair rotted deck joist and decking as needed. remove and replace bedroom door leading to deck with same size door. | $8,000 |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 2915 23rd St | street spaceDetails
street space | |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 3367 21st St | street spaceDetails
street space | |
| Sep 14, 2015 | Completed final sign-off Oct 2015 | 988 Capp St | repair front wood stairs (1001(b)(13)hc) = replacing two 4x6 posts, like for like, less than 50% to comply w/nov #201560561, items #2Details
repair front wood stairs (1001(b)(13)hc) = replacing two 4x6 posts, like for like, less than 50% to comply w/nov #201560561, items #2 | $1,800 |
| Jun 25, 2015 | Completed final sign-off Aug 2015 | 681 Panorama Dr | window replacement. aluminum windows in front and side in-kind. vinyl in the rear. 6 windows, 1 skylight. all windows to be replaced in kind on same locations as existing.Details
window replacement. aluminum windows in front and side in-kind. vinyl in the rear. 6 windows, 1 skylight. all windows to be replaced in kind on same locations as existing. | $2,200 |
| Jan 21, 2015 | Completed final sign-off Apr 2015 | 1 Daniel Burnham Ct | remove and replace tile floor, tile shower walls, tub, vanity. will meet acoustical requirement per home owners association.Details
remove and replace tile floor, tile shower walls, tub, vanity. will meet acoustical requirement per home owners association. | $10,000 |
| Jan 12, 2015 | Completed final sign-off Jan 2015 | 2915 23rd St | renew permit for final inspection. all work complete. pa# 200207232066Details
renew permit for final inspection. all work complete. pa# 200207232066 | |
| Sep 15, 2014 | Completed final sign-off Dec 2015 | 2915 23rd St | remove (e) rotten rear wood stair & deck. rebuilt rear wood stair & deck w/configuration change for code compliance.Details
remove (e) rotten rear wood stair & deck. rebuilt rear wood stair & deck w/configuration change for code compliance. | $18,000 |
| Jul 7, 2014 | Completed final sign-off Dec 2014 | 2228 Union St | remove and replace existing shingle siding on the sides of bldg siding, contains lead.Details
remove and replace existing shingle siding on the sides of bldg siding, contains lead. | $30,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 1221 Folsom St | replacement of wood siding on back of house with ti-11 siding in 4x8 sheets, replace in kind; repair of less than 50% of stairs on back of home, decking surface and rails will undergo repairDetails
replacement of wood siding on back of house with ti-11 siding in 4x8 sheets, replace in kind; repair of less than 50% of stairs on back of home, decking surface and rails will undergo repair | $11,600 |
| Dec 6, 2011 | Completed final sign-off Dec 2011 | 2386 15th St | replace (e) one window, replace with same type of wood window. location right front side. replace in kind. no structural work, u-factir =0.4. (a separate permit will be obtain to comply w/nov #201146347.)Details
replace (e) one window, replace with same type of wood window. location right front side. replace in kind. no structural work, u-factir =0.4. (a separate permit will be obtain to comply w/nov #201146347.) | $2,000 |
| Nov 24, 2010 | Expired or cancelled expired Apr 2022 | 3367 21st St | repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations.Details
repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations. | $5,000 |