Block 0059, lot 076
150 Lombard St
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,169 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
2 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 150 Lombard St | Castillo Family Inc Dba Castle Company | unit# 906: remodel 2 bathrooms like for like, new drop in-tub and new pre-fabricated shower pan; convert 3 bedroom space back to original 2 bedroom layout. partition non load bearing metal stud walls.Details
unit# 906: remodel 2 bathrooms like for like, new drop in-tub and new pre-fabricated shower pan; convert 3 bedroom space back to original 2 bedroom layout. partition non load bearing metal stud walls. | $58,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2020 | 150 Lombard St | Castillo Family Inc Dba Castle Company | unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windowsDetails
unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windows | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Castillo Family Inc Dba Castle Company (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.