Block 0059, lot 078
152 Lombard St
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,150 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2024 | In progress issued Jan 2026 | 152 Lombard St | Pyro-Comm Systems, Inc. | bldg #2: addition to the (e) fire alarm system. new nottification appliances will be added to provide proper coverage for area of work. all new notification appliances will be connected to (e) & new remote power supply. appliances will be activated on general alarm condition. 118-mini horn.Details
bldg #2: addition to the (e) fire alarm system. new nottification appliances will be added to provide proper coverage for area of work. all new notification appliances will be connected to (e) & new remote power supply. appliances will be activated on general alarm condition. 118-mini horn. | $111,842 |
| Aug 6, 2021 | Completed final sign-off Jun 2022 | 152 Lombard St | Centric Building Inc. | level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a.Details
level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a. | |
| Dec 11, 2020 | Completed final sign-off Jun 2022 | 152 Lombard St | Centric Building Inc. | reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7Details
reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7 | |
| Sep 2, 2020 | Completed final sign-off Jun 2022 | 152 Lombard St | bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Details
bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. | $35,000 | |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 152 Lombard St | Castillo Family Inc Dba Castle Company | unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification.Details
unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification. | $25,000 |
| Oct 13, 2011 | Completed final sign-off Mar 2012 | 152 Lombard St | Priority Architectural Graphics Dba Prio | 23 evacuation maps to be reviewed by sffd only (common areas)Details
23 evacuation maps to be reviewed by sffd only (common areas) | $6,900 |
| Oct 14, 2009 | Completed final sign-off Aug 2010 | 152 Lombard St | Lindele Construction Co, Inc | unit# 703 at 7th floor. interior remodel of approx. 1,150 sqft incl casework in kitchen, laundry, master bath, bath#2. partial demo of non bearing wall in kitchen. addition of mantle in lv room fire place. redo floor finishes.Details
unit# 703 at 7th floor. interior remodel of approx. 1,150 sqft incl casework in kitchen, laundry, master bath, bath#2. partial demo of non bearing wall in kitchen. addition of mantle in lv room fire place. redo floor finishes. | $75,000 |
| Mar 5, 2007 | Completed final sign-off May 2007 | 152 Lombard St | Ehj Construction,Inc. | demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changesDetails
demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changes | $13,950 |
| Dec 12, 2006 | Completed final sign-off Jul 2007 | 152 Lombard St | Sf Contractor | unit #404-master bath:replace cracked shower pan, retile shower and floors, new plumbing fixtures, counter tops, new surface lighting fixtures, switches, gfi's trim. guest bath: replace tub, plumbing fixtures, retile floor & walls, new counter top, new surface lighting fixtures, switches & gfi trim.Details
unit #404-master bath:replace cracked shower pan, retile shower and floors, new plumbing fixtures, counter tops, new surface lighting fixtures, switches, gfi's trim. guest bath: replace tub, plumbing fixtures, retile floor & walls, new counter top, new surface lighting fixtures, switches & gfi trim. | $21,000 |
| Aug 15, 2005 | Completed final sign-off Dec 2005 | 152 Lombard St | Sure, Inc. | replace kitchen cabinets - and bath remodelDetails
replace kitchen cabinets - and bath remodel | $23,000 |
| Feb 4, 2003 | Expired or cancelled expired Sep 2007 | 152 Lombard St | general upgrade & maintenance to (e) bldng lobby & common hallways, work includes (n) paint, (n) carDetails
general upgrade & maintenance to (e) bldng lobby & common hallways, work includes (n) paint, (n) car | $20,000 | |
| Feb 1, 2000 | Completed final sign-off Apr 2000 | 152 Lombard St | new layer of 5/8" gyp over metal channels over existing ceilings (4-rooms)Details
new layer of 5/8" gyp over metal channels over existing ceilings (4-rooms) | ||
| Jan 7, 2000 | Expired or cancelled expired Aug 2000 | 152 Lombard St | renewal of pa 9417671Details
renewal of pa 9417671 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Centric Building Inc. (2), Castillo Family Inc Dba Castle Company, Ehj Construction,Inc., Lindele Construction Co, Inc, Priority Architectural Graphics Dba Prio, Pyro-Comm Systems, Inc., Sf Contractor, Sure, Inc.
- Architects
- D. Ian Bevilacqua (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.