Block 6517, lot 016
988 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 3
- Units
- 4
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 2,589 sq ft
- Lot
- 3,332 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 988 Capp St | Anthony C. Cirella/Afs Property Mgmt | rev to pa202006259146: partial voluntary seismic strengthening at 1st floor only; addition of new plywood shearwall at gridline c, w/ (n) 24'-0" shearwall and 10'-0" shearwall @ gridline 4.5 & 5.Details
rev to pa202006259146: partial voluntary seismic strengthening at 1st floor only; addition of new plywood shearwall at gridline c, w/ (n) 24'-0" shearwall and 10'-0" shearwall @ gridline 4.5 & 5. | $26,000 |
| Oct 2, 2020 | Completed final sign-off Jan 2022 | 988 Capp St | Armstrong Installation Service | reroofing. foam overlay, 20.5 squres, no tear off, no resheet, 1 layer, class b, flat, whiteDetails
reroofing. foam overlay, 20.5 squres, no tear off, no resheet, 1 layer, class b, flat, white | $18,400 |
| Jun 25, 2020 | Completed final sign-off Jun 2022 | 988 Capp St | Anthony C. Cirella/Afs Property Mgmt | remodel of existing kitchen, remodel/relocate existing bath. upgrade electrical to existing bedroom and living room for first floor unit.Details
remodel of existing kitchen, remodel/relocate existing bath. upgrade electrical to existing bedroom and living room for first floor unit. | $125,000 |
| Jul 11, 2018 | Completed final sign-off Dec 2019 | 988 Capp St | Chavarria Construction Inc | replace rotten header of garage, replace rotten beams & post w/ steal frame inside, add new drainage trench, garage upgrade fire rated sheet rock. no wall has been removed, no changes in structural system and lateral resisteive system. stairwell changed in kind.Details
replace rotten header of garage, replace rotten beams & post w/ steal frame inside, add new drainage trench, garage upgrade fire rated sheet rock. no wall has been removed, no changes in structural system and lateral resisteive system. stairwell changed in kind. | $15,000 |
| Sep 14, 2015 | Completed final sign-off Oct 2015 | 988 Capp St | Castillo Family Inc Dba Castle Company | repair front wood stairs (1001(b)(13)hc) = replacing two 4x6 posts, like for like, less than 50% to comply w/nov #201560561, items #2Details
repair front wood stairs (1001(b)(13)hc) = replacing two 4x6 posts, like for like, less than 50% to comply w/nov #201560561, items #2 | $1,800 |
| Nov 7, 2003 | Completed final sign-off Dec 2003 | 988 Capp St | to comply with nov.less than 50% of structureDetails
to comply with nov.less than 50% of structure | $1,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Anthony C. Cirella/Afs Property Mgmt (2), Armstrong Installation Service, Castillo Family Inc Dba Castle Company, Chavarria Construction Inc
- Architects
- John Mallick
- Engineers
- Dr. Amin Ghafooripour
- Authorized agent-otherss
- Anthony C. Cirella
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.