Back to kitchen remodel contractors
Castillo Family Inc Dba Castle Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 6 permits filed
43 permits since 2000: 36 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 14 completed, 3 in progress. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 152 Lombard St | unit 502: replace wall and floor tiles in bathroom and half bath, 2 shower valves, relocate light switch and outlets in kitchen, replace kitchen counter tops and faucet, install hardwood floor thoughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5Details
unit 502: replace wall and floor tiles in bathroom and half bath, 2 shower valves, relocate light switch and outlets in kitchen, replace kitchen counter tops and faucet, install hardwood floor thoughout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5 | $90,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 101 Lombard St | unit # 511 w 5th floor: remodel kitchen, change bath to shower. move sink to opposite side in kitchen. removal end wall to dining room and make it a ponywall. no exterior work.Details
unit # 511 w 5th floor: remodel kitchen, change bath to shower. move sink to opposite side in kitchen. removal end wall to dining room and make it a ponywall. no exterior work. | $50,000 |
| Mar 23, 2026 | Completed final sign-off Sep 2026 | 135 Beaver St | relocate accessory sink in kitchen to face kitchen side. remove and replace half bath vanity top and faucet. relocate dining room light box. install 2 new wall sconces in kitchen.Details
relocate accessory sink in kitchen to face kitchen side. remove and replace half bath vanity top and faucet. relocate dining room light box. install 2 new wall sconces in kitchen. | $25,000 |
| Oct 18, 2024 | In progress issued Oct 2024 | 156 Lombard St | unit #35; completely remodel kitchen, hall bathroom, master bathroom and half bath like for like. upgrade electrical panel. convert hall bathroom tub to shower w/new pre fabricated shower pan.Details
unit #35; completely remodel kitchen, hall bathroom, master bathroom and half bath like for like. upgrade electrical panel. convert hall bathroom tub to shower w/new pre fabricated shower pan. | $75,000 |
| Aug 29, 2024 | Completed final sign-off Sep 2025 | 150 Lombard St | unit #905: remodel kitchen like for like w/ new kitchen cabinets, countertop and flooring. remodel hall and master bathroom like for like w/ new water mixing valves, wall tile, pre-fabricated shower pan, new vanitites and tops.Details
unit #905: remodel kitchen like for like w/ new kitchen cabinets, countertop and flooring. remodel hall and master bathroom like for like w/ new water mixing valves, wall tile, pre-fabricated shower pan, new vanitites and tops. | $70,000 |
| Jan 10, 2024 | Completed final sign-off Jul 2024 | 46 Eastwood Dr | fully remodel existing kitchen like for like, install new tub and wall tile in bathroom, build new half bathroom in existing bedroom closet, and new closet space in bedroom, repair back stairs and landing.Details
fully remodel existing kitchen like for like, install new tub and wall tile in bathroom, build new half bathroom in existing bedroom closet, and new closet space in bedroom, repair back stairs and landing. | $58,000 |
| Jan 17, 2023 | Completed final sign-off Jun 2023 | 154 Lombard St | unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughoutDetails
unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughout | $58,000 |
| Jul 21, 2022 | Completed final sign-off Apr 2023 | 150 Lombard St | fully remodel (2) bathrooms (keeping vanities) like for like. remodel kitchen like for like. upgrade electrical panel. no structural work and no change in floor layout.Details
fully remodel (2) bathrooms (keeping vanities) like for like. remodel kitchen like for like. upgrade electrical panel. no structural work and no change in floor layout. | $45,000 |
| Jul 21, 2022 | Completed final sign-off Feb 2023 | 111 Chestnut St | unit #205: fully remodeled 2 bathrooms (1 tub, 1 shower) like for like on all plumbing location, fully remodel kitchen with new cabinets and counter top, install new flooring through out condoDetails
unit #205: fully remodeled 2 bathrooms (1 tub, 1 shower) like for like on all plumbing location, fully remodel kitchen with new cabinets and counter top, install new flooring through out condo | $53,000 |
| Jun 9, 2022 | Completed final sign-off Nov 2022 | 156 Lombard St | upgrade lighting in entry, kitchen, dining room, 2 bedrooms, master bathroom with new recessed led lights. upgrade electrical panel and move out of closet. replace kitchen counter top and sink. install new hardwood floor in 2nd floor.Details
upgrade lighting in entry, kitchen, dining room, 2 bedrooms, master bathroom with new recessed led lights. upgrade electrical panel and move out of closet. replace kitchen counter top and sink. install new hardwood floor in 2nd floor. | $45,000 |
| Oct 26, 2021 | Completed final sign-off Oct 2022 | 101 Lombard St | unit #208w. remodel one kitchen like for like w/same layout, new cabinets and counter tops, remodel one hall bathroom and convert tub to shower, same foot print and layout, remodel one master bath like for like, new tub, showr valve w/pre fab shower pan, same footprint and layout. non structural.Details
unit #208w. remodel one kitchen like for like w/same layout, new cabinets and counter tops, remodel one hall bathroom and convert tub to shower, same foot print and layout, remodel one master bath like for like, new tub, showr valve w/pre fab shower pan, same footprint and layout. non structural. | $55,000 |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 152 Lombard St | remodel kitchen like for like with new cabinets, countertops. replace hall bath shower/tub conrol valve (keeping tub). replace 650 sqft of hardwood floor. upgrade electrical panel.Details
remodel kitchen like for like with new cabinets, countertops. replace hall bath shower/tub conrol valve (keeping tub). replace 650 sqft of hardwood floor. upgrade electrical panel. | $45,000 |
| Jul 27, 2020 | Completed final sign-off Mar 2021 | 150 Lombard St | remodel kitchen like for like remodel master bath like for like,remodel hall bath like for like, upgrade electriacl panel.Details
remodel kitchen like for like remodel master bath like for like,remodel hall bath like for like, upgrade electriacl panel. | $90,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2020 | 150 Lombard St | unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windowsDetails
unit # 906: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 (e) windows | $50,000 |
| May 23, 2019 | Completed final sign-off Aug 2019 | 101 Lombard St | #10e: due to wager damage rebuild bathroom, tile, vanity, toilet, kitchen cabinets, counter top, sink, faucet, 56 sqft kitchen, 78 sqft bathroom.Details
#10e: due to wager damage rebuild bathroom, tile, vanity, toilet, kitchen cabinets, counter top, sink, faucet, 56 sqft kitchen, 78 sqft bathroom. | $50,000 |
| Nov 9, 2016 | Completed final sign-off Feb 2017 | 2058 45th Av | to comply with complaint 201641271,kitchen replace kitchen cabinets, & countertops bathroom replace bathorom vanity floor & wall tile, replace dry rot near front window & basement, replace 2 front window aluminum clad repalce a portion exterior stucco 20 25ftDetails
to comply with complaint 201641271,kitchen replace kitchen cabinets, & countertops bathroom replace bathorom vanity floor & wall tile, replace dry rot near front window & basement, replace 2 front window aluminum clad repalce a portion exterior stucco 20 25ft | $12,000 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 152 Lombard St | unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification.Details
unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification. | $25,000 |