Cbs Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Oct 2026
- Last 24 months
- 27 permits filed
134 permits since 2000: 103 completed, 14 in progress, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 30 days from filing to permit and 311 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2023 | Completed final sign-off Aug 2024 | 3928 Cesar Chavez St | kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f.Details
kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f. | $28,000 |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 157 Bernard St | remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floorsDetails
remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floors | $80,000 |
| Oct 30, 2018 | Completed final sign-off Sep 2019 | 1615 Church St | first floor removel to include (n) bedroom, (n) bathroom, (n) den and (n) staircase to downstairsDetails
first floor removel to include (n) bedroom, (n) bathroom, (n) den and (n) staircase to downstairs | $50,000 |
| Oct 23, 2017 | Never finaled issued Apr 2018, no final | 142 Cortland Av | rebuild front entry stairs and add three new bike parking spaces for new adu in the rear building. see pa#2016-1216-5233 for plansDetails
rebuild front entry stairs and add three new bike parking spaces for new adu in the rear building. see pa#2016-1216-5233 for plans | $3,000 |
| Oct 19, 2017 | Completed final sign-off Jun 2019 | 1126 Taylor St | add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinanceDetails
add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinance | $28,000 |
| Aug 24, 2015 | Completed final sign-off Aug 2016 | 704 Castro St | repair/replace front stair steps. existing posts/walls remain unchanged. less than 50% replacement. front stair.Details
repair/replace front stair steps. existing posts/walls remain unchanged. less than 50% replacement. front stair. | $1,000 |
| Aug 6, 2015 | Completed final sign-off May 2016 | 1471 Washington St | to comply w/nov #201459321 (entirely rplaced in kind per nov) - patch & repair (e) stairs, treads, risers & stair enclosure, & two windows as required. no more than 20% of existing area. compliance with maher ordinance no 155-13 not required.Details
to comply w/nov #201459321 (entirely rplaced in kind per nov) - patch & repair (e) stairs, treads, risers & stair enclosure, & two windows as required. no more than 20% of existing area. compliance with maher ordinance no 155-13 not required. | $7,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 1010 Ingerson Av | remove stairs & enlarge game room at lower level, add a bathroom & enlarge bedroom @ 1st (main) floor, remove stair @ upper level. a new interior staircase will build to serve all levels. remodel bathroom & kitchen relocate stair.Details
remove stairs & enlarge game room at lower level, add a bathroom & enlarge bedroom @ 1st (main) floor, remove stair @ upper level. a new interior staircase will build to serve all levels. remodel bathroom & kitchen relocate stair. | $60,000 |