Back to kitchen remodel contractors
Cbs Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Oct 2026
- Last 24 months
- 27 permits filed
134 permits since 2000: 103 completed, 14 in progress, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
47 kitchen remodel permits: 40 completed, 5 in progress, 2 never finaled. Typically 2 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 149 Buchanan St | remodel kitchen and bath. add 1 bathDetails
remodel kitchen and bath. add 1 bath | $60,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 646 06th Av | interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & subDetails
interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & sub | $350,000 |
| Feb 20, 2026 | In progress issued Feb 2026 | 130 19th Av | 1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom.Details
1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom. | $125,000 |
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 359 31st Av | in kind kitchen (1) and bathroom (2). replace finishes, cabinets, fixtures and lighting at (e) locations. no structural or layout changes.Details
in kind kitchen (1) and bathroom (2). replace finishes, cabinets, fixtures and lighting at (e) locations. no structural or layout changes. | $25,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 843 14th St | kitchen remodel 1 bath remodel in kind.Details
kitchen remodel 1 bath remodel in kind. | $30,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 761 Pine St | relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st).Details
relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st). | $250,000 |
| Jun 9, 2025 | In progress issued Aug 2025 | 10 Skyview Wy | renovation to single family dwelling at 1st floor, convert existing uncondition space to new family room, bedroom, bathroom, storage, wetbar. no excavation required. at 2nd floor, renovate bathrooms and kitchen.Details
renovation to single family dwelling at 1st floor, convert existing uncondition space to new family room, bedroom, bathroom, storage, wetbar. no excavation required. at 2nd floor, renovate bathrooms and kitchen. | $130,000 |
| Apr 29, 2025 | Completed final sign-off Oct 2025 | 148 Blake St | unit #1 - 1 kitchen and (2) baths remodelDetails
unit #1 - 1 kitchen and (2) baths remodel | $45,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2026 | 1773 15th St | 1 kitchen and 1 bath remodel.Details
1 kitchen and 1 bath remodel. | $35,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2026 | 1747 Broadway | interior remodel of e) condo unit. total bedrooms changing from 4 to 2. add 1 bath. minor reconfiguration of inteior walls & doors. remodel 1 kitchen, 1 full bath, & 1 half bath. replace all non st facing windowsDetails
interior remodel of e) condo unit. total bedrooms changing from 4 to 2. add 1 bath. minor reconfiguration of inteior walls & doors. remodel 1 kitchen, 1 full bath, & 1 half bath. replace all non st facing windows | $40,000 |
| Mar 25, 2025 | Completed final sign-off Oct 2025 | 527 Birch St | #529: kitchen remodel, add (n) full bath, office & great room #527: kitchen remodel, add (n) full bathDetails
#529: kitchen remodel, add (n) full bath, office & great room #527: kitchen remodel, add (n) full bath | $65,000 |
| Jan 17, 2025 | Completed final sign-off Aug 2026 | 507 29th Av | 1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit.Details
1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit. | $70,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2025 | 837 Fillmore St | unit #1: remodel kitchen in-kind, ~70 sf.Details
unit #1: remodel kitchen in-kind, ~70 sf. | $18,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 88 King St | unit 1407: kitchen remodel - plumbing and electrical location remain. in kind.Details
unit 1407: kitchen remodel - plumbing and electrical location remain. in kind. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Dec 2024 | 251 27th Av | unit 251: kitchen and 1 bathroom remodel in kind.Details
unit 251: kitchen and 1 bathroom remodel in kind. | $50,000 |
| Mar 22, 2024 | Completed final sign-off Apr 2025 | 505 29th Av | unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable spaceDetails
unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable space | $56,000 |
| Oct 20, 2023 | Completed final sign-off Aug 2024 | 3928 Cesar Chavez St | kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f.Details
kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f. | $28,000 |
| Jun 21, 2023 | Completed final sign-off Jan 2024 | 570 Arlington St | one kitchen remodel. new cabinet, counter top. one upstair bath remodel. new tile, new vanity/top. new plumbing fixtures. all non structural.Details
one kitchen remodel. new cabinet, counter top. one upstair bath remodel. new tile, new vanity/top. new plumbing fixtures. all non structural. | $25,000 |
| Mar 17, 2023 | Completed final sign-off Feb 2024 | 148 Blake St | apt 3: remodel one kitchen & 2 bathroom remodels. fixture location remain unchanged. non structuralDetails
apt 3: remodel one kitchen & 2 bathroom remodels. fixture location remain unchanged. non structural | $30,000 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 425 01st St | kitchen remodel in kind. no layout change. new cabinets, countertop. (2) bath remodels in kind. no layout change. new tile. shower valve, shower base, new tub. no wall removal. no structural work. maintain all accessibility requirements/features required at the time of building construction.Details
kitchen remodel in kind. no layout change. new cabinets, countertop. (2) bath remodels in kind. no layout change. new tile. shower valve, shower base, new tub. no wall removal. no structural work. maintain all accessibility requirements/features required at the time of building construction. | $35,000 |
| Nov 29, 2022 | Completed final sign-off Feb 2024 | 148 Blake St | unit #2: kitchen, 2 baths remodel. fixture location remains unchanged.Details
unit #2: kitchen, 2 baths remodel. fixture location remains unchanged. | $15,000 |
| Sep 12, 2022 | Completed final sign-off Oct 2025 | 194 Guerrero St | unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12)Details
unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12) | $35,000 |
| Aug 19, 2022 | Completed final sign-off May 2023 | 276 12th Av | upper unit 278: kitchen and bath remodel, replace new furnace. lower unit 276: bath remodel, replace new furnace. no removal of wallsDetails
upper unit 278: kitchen and bath remodel, replace new furnace. lower unit 276: bath remodel, replace new furnace. no removal of walls | $60,000 |
| Aug 19, 2022 | Completed final sign-off Apr 2023 | 555 Fulton St | apt 526: kitchen remodel, 2 bathroms rmeodel. no layout changes. new cabinets & countertop., new vanity & sink.Details
apt 526: kitchen remodel, 2 bathroms rmeodel. no layout changes. new cabinets & countertop., new vanity & sink. | $30,000 |
| Jul 13, 2022 | Completed final sign-off Jul 2023 | 1680 Oakdale Av | 1st fl - add 1 unit, 1 bedroom, kitchen and 1 full bathDetails
1st fl - add 1 unit, 1 bedroom, kitchen and 1 full bath | $48,000 |
| Dec 14, 2021 | Completed final sign-off Sep 2023 | 1758 18th Av | 2nd floor: kitchen & bath remodelDetails
2nd floor: kitchen & bath remodel | $45,000 |
| Dec 9, 2021 | Completed final sign-off Oct 2022 | 350 Arleta Av | remodel kitchen and bath, add 1 bedroomDetails
remodel kitchen and bath, add 1 bedroom | $20,000 |
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 4150 17th St | 1 kitchen remodel, 2 bath remodel in kind- no layout change.Details
1 kitchen remodel, 2 bath remodel in kind- no layout change. | $30,000 |
| Aug 17, 2021 | Completed final sign-off Mar 2022 | 1967 32nd Av | 2nd floor one kitchen (100sf) and one bath (40sf) remodel in-kind; no wall removal; no layout changeDetails
2nd floor one kitchen (100sf) and one bath (40sf) remodel in-kind; no wall removal; no layout change | $15,000 |
| Aug 20, 2019 | Completed final sign-off May 2025 | 626 Natoma St | adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16Details
adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16 | $150,000 |
| May 20, 2019 | Completed final sign-off Feb 2024 | 1367 Gilman Av | comply with complaint#201935411. 1st fl: add adu per ordinance 95-17. add 1 kitchen, living,storage. 2 beds and 1.5 bathDetails
comply with complaint#201935411. 1st fl: add adu per ordinance 95-17. add 1 kitchen, living,storage. 2 beds and 1.5 bath | $65,000 |
| Jan 17, 2019 | Never finaled issued Jun 2022, no final | 2414 43rd Av | unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit.Details
unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit. | $60,000 |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 157 Bernard St | remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floorsDetails
remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floors | $80,000 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 999 Green St | apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a.Details
apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a. | $30,000 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 45 Dellbrook Av | kitchen upgrade, new cabinets, new countertopsDetails
kitchen upgrade, new cabinets, new countertops | $8,000 |
| Nov 30, 2015 | Never finaled issued Nov 2015, no final | 39 Rosemont Pl | one kitchen & one bath remodel, new cabinet, countertop, new tub, vanity. non structural.Details
one kitchen & one bath remodel, new cabinet, countertop, new tub, vanity. non structural. | $20,000 |
| Aug 7, 2015 | Completed final sign-off Aug 2016 | 704 Castro St | kitchen & bath upgrade: replace cabinets, countertop, sink & faucet.Details
kitchen & bath upgrade: replace cabinets, countertop, sink & faucet. | $9,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 1010 Ingerson Av | remove stairs & enlarge game room at lower level, add a bathroom & enlarge bedroom @ 1st (main) floor, remove stair @ upper level. a new interior staircase will build to serve all levels. remodel bathroom & kitchen relocate stair.Details
remove stairs & enlarge game room at lower level, add a bathroom & enlarge bedroom @ 1st (main) floor, remove stair @ upper level. a new interior staircase will build to serve all levels. remodel bathroom & kitchen relocate stair. | $60,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2015 | 2200 Jerrold Av | unit z: extension to existing catering kitchen; maher n/aDetails
unit z: extension to existing catering kitchen; maher n/a | $25,000 |
| Apr 28, 2014 | Completed final sign-off Oct 2014 | 2200 Jerrold Av | suite z - remodel an existing production kitchen warehouse space and install a commissary kitchen for catering, (replacing kitchen equipment). n/a ordinance #155-13Details
suite z - remodel an existing production kitchen warehouse space and install a commissary kitchen for catering, (replacing kitchen equipment). n/a ordinance #155-13 | $110,400 |
| May 14, 2013 | Completed final sign-off Aug 2013 | 780 Green St | new kitchen cabinets. new kitchen countertop (one unit)Details
new kitchen cabinets. new kitchen countertop (one unit) | $12,000 |
| May 13, 2013 | Completed final sign-off Aug 2013 | 782 Green St | unit #782- new kitchen cabinets, new countertop, new bath shower, new vanity and top, new toilet.Details
unit #782- new kitchen cabinets, new countertop, new bath shower, new vanity and top, new toilet. | $20,000 |
| Aug 6, 2012 | Completed final sign-off Dec 2012 | 149 Belvedere St | kitchen remodel:new cabinets and countertop. upgrade electricity and plumbing. for one flat only . 149 belvedere st.Details
kitchen remodel:new cabinets and countertop. upgrade electricity and plumbing. for one flat only . 149 belvedere st. | $10,500 |
| Jun 21, 2012 | Completed final sign-off Sep 2012 | 1890 26th Av | kitchen upgrade, new cabinets and countertop, new lighting, no structural work, lighting must comply with cec 150(k); kitchen area 10'x13'Details
kitchen upgrade, new cabinets and countertop, new lighting, no structural work, lighting must comply with cec 150(k); kitchen area 10'x13' | $8,000 |
| Sep 26, 2011 | Completed final sign-off Feb 2012 | 200 Bridgeview Dr | comply with complaint 201156847, 201035237 - basement remodel, add full bath, 2 bedrooms, storage/laundry. 1st floor rmodel, kitchen and bath.Details
comply with complaint 201156847, 201035237 - basement remodel, add full bath, 2 bedrooms, storage/laundry. 1st floor rmodel, kitchen and bath. | $50,000 |
| Sep 14, 2011 | Completed final sign-off Feb 2012 | 200 Bridgeview Dr | replace kitchen cabinets and countertop upgrade electrical and plumbing, replace bathh tub, toilet, sink, and tiles to comply with nov 201035237 and 20156847Details
replace kitchen cabinets and countertop upgrade electrical and plumbing, replace bathh tub, toilet, sink, and tiles to comply with nov 201035237 and 20156847 | $17,900 |
| Jul 21, 2011 | Completed final sign-off Sep 2011 | 1240 41st Av | kitchen remodel: new cabinets, new countertop, new gfci plugs.Details
kitchen remodel: new cabinets, new countertop, new gfci plugs. | $8,500 |