Block 8721, lot 029
1515 03rd St
- City’s use
- Commercial Office
- Built
- 2021
- Stories
- 6
- Building
- 302,084 sq ft
- Lot
- 38,227 sq ft
- Zoning
- MBO
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
134 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 26, 2026 | Completed final sign-off Feb 2026 | 1515 03rd St | Principal Builders Inc. | to obtain final inspection for work approved under pa# 202410112789. all work is complete.Details
to obtain final inspection for work approved under pa# 202410112789. all work is complete. | |
| Nov 10, 2025 | In progress issued Nov 2025 | 1515 03rd St | Siemens Industry, Inc. | fire only work to replace 4 existing beam detector sets at the atriums of floor, 2, 4 & 5; 3 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system addition only)Details
fire only work to replace 4 existing beam detector sets at the atriums of floor, 2, 4 & 5; 3 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system addition only) | $23,815 |
| Feb 4, 2025 | Completed final sign-off Mar 2025 | 1515 03rd St | Principal Builders Inc. | 3/fl-rev 202408289660- (n) non structural partitions.Details
3/fl-rev 202408289660- (n) non structural partitions. | $30,000 |
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 1515 03rd St | 5th fl -revision to fire pa 202410173099 added ceiling to library 02-0539 relocated 10 fire sprinklers and deleted 6. 202408309841Details
5th fl -revision to fire pa 202410173099 added ceiling to library 02-0539 relocated 10 fire sprinklers and deleted 6. 202408309841 | $1,000 | |
| Dec 10, 2024 | In progress issued Dec 2024 | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on fl 1, additons of 2 duct detectors 4 modules, 2 speakers/strobes and the relocation of 3 speaker/strobes rep pa # 2024-0729-7454Details
fire only work for the open ai remodel on fl 1, additons of 2 duct detectors 4 modules, 2 speakers/strobes and the relocation of 3 speaker/strobes rep pa # 2024-0729-7454 | $12,560 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on floor 6. additoins are 6 speaker strobes and 11 strobes, as well s the relocation of 8 speaker strobes. ref 202407257306Details
fire only work for the open ai remodel on floor 6. additoins are 6 speaker strobes and 11 strobes, as well s the relocation of 8 speaker strobes. ref 202407257306 | $20,285 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on floor 3. additions are 1 strobe power, 1 module supply, 12 speaker/strobes, 36 strobes.11 speaker strobes being relocated ref 202408289660Details
fire only work for the open ai remodel on floor 3. additions are 1 strobe power, 1 module supply, 12 speaker/strobes, 36 strobes.11 speaker strobes being relocated ref 202408289660 | $51,240 |
| Nov 14, 2024 | Completed final sign-off Feb 2025 | 1515 03rd St | Siemens Industry, Inc. | 5th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, 1 module, 12 speaker/strobes, 31 strobes and relocation of 8 speaker/strobes. ref pa 202408309841Details
5th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, 1 module, 12 speaker/strobes, 31 strobes and relocation of 8 speaker/strobes. ref pa 202408309841 | $45,250 |
| Nov 14, 2024 | Completed final sign-off Dec 2024 | 1515 03rd St | Siemens Industry, Inc. | 4th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, module, 15 speaker/strobes, 35 strobes and relocation of 8 speaker/strobes. ref pa 202408068093Details
4th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, module, 15 speaker/strobes, 35 strobes and relocation of 8 speaker/strobes. ref pa 202408068093 | $50,600 |
| Oct 29, 2024 | Completed final sign-off Feb 2026 | 1515 03rd St | Principal Builders Inc. | addition of prefabricated aluminum pavilion structure at the existing roof.Details
addition of prefabricated aluminum pavilion structure at the existing roof. | $100,000 |
| Oct 17, 2024 | Completed final sign-off Feb 2025 | 1515 03rd St | 5th floor. ti fire sprinkler relocate 25, add 27 fire sprinklers t.i. # 2024-0830-9841 (5th fl.)Details
5th floor. ti fire sprinkler relocate 25, add 27 fire sprinklers t.i. # 2024-0830-9841 (5th fl.) | $13,250 | |
| Oct 17, 2024 | Completed final sign-off Feb 2025 | 1515 03rd St | 3rd floor. ti fire sprinkler relocate 28, add 37 fire sprinklers t.i. # 2024-0828-9660Details
3rd floor. ti fire sprinkler relocate 28, add 37 fire sprinklers t.i. # 2024-0828-9660 | $10,000 | |
| Oct 11, 2024 | Expired or cancelled expired Feb 2026 | 1515 03rd St | Principal Builders Inc. | l7 terrace mb2 wprl omc;ides mew exterior partions millwork finishes and lightingDetails
l7 terrace mb2 wprl omc;ides mew exterior partions millwork finishes and lighting | $75,000 |
| Oct 4, 2024 | In progress issued Nov 2024 | 1515 03rd St | Principal Builders Inc. | mb2, l3 - l6 micro kitchen health dept reviewDetails
mb2, l3 - l6 micro kitchen health dept review | |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 1515 03rd St | 4/f: t.i. fire sprinklers: relocate 31, add 40 f/s. ref t.i. pa 202408068093.Details
4/f: t.i. fire sprinklers: relocate 31, add 40 f/s. ref t.i. pa 202408068093. | $35,000 | |
| Sep 17, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | level 6/mission bay 2- install 2 new tempered chilled water fan coils. install 1 new cooling only van. relocate & demo swirl diffusers as required. rebalance e) vav's as required. install new ductwork & pipe as requriedDetails
level 6/mission bay 2- install 2 new tempered chilled water fan coils. install 1 new cooling only van. relocate & demo swirl diffusers as required. rebalance e) vav's as required. install new ductwork & pipe as requried | $60,000 |
| Sep 16, 2024 | Completed final sign-off Jan 2025 | 1515 03rd St | t.i. fire sprinkler, relocate 27, add 4, delete 20 fire sprinklers. t.i. 202407257306Details
t.i. fire sprinkler, relocate 27, add 4, delete 20 fire sprinklers. t.i. 202407257306 | $9,000 | |
| Sep 12, 2024 | Completed final sign-off Jan 2025 | 1515 03rd St | ti fire sprinklers, relocate 5, add 1 fire sprinkler. 202406255225.Details
ti fire sprinklers, relocate 5, add 1 fire sprinkler. 202406255225. | $2,500 | |
| Sep 12, 2024 | Completed final sign-off Jan 2025 | 1515 03rd St | ti fire sprinklers, relocate 2, add 1 fire sprinkler. ti 2024056124318Details
ti fire sprinklers, relocate 2, add 1 fire sprinkler. ti 2024056124318 | $2,500 | |
| Aug 30, 2024 | In progress issued Oct 2024 | 1515 03rd St | Principal Builders Inc. | level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376Details
level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376 | $3,999,516 |
| Aug 28, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | level 3: demo e ceiling and finishes. minor alterations to e non structural partitions, millwork, finishes, suspended ceilings, and new lightingDetails
level 3: demo e ceiling and finishes. minor alterations to e non structural partitions, millwork, finishes, suspended ceilings, and new lighting | $3,999,516 |
| Aug 16, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | level 4: deferred mep for pa# 202408058093.Details
level 4: deferred mep for pa# 202408058093. | $70,000 |
| Aug 9, 2024 | Completed final sign-off Dec 2024 | 1515 03rd St | level 5, mb2. demo (e) non-structural partitons, doors, finishes. no work on (e) ceiling. per ab-017Details
level 5, mb2. demo (e) non-structural partitons, doors, finishes. no work on (e) ceiling. per ab-017 | $62,883 | |
| Aug 6, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | level 4 mb2. demo e ceiling and finishes. minor alterations non structural to partitions, millwork, lighting, finishes, ceiling. demo previously under 2024-0724-7175Details
level 4 mb2. demo e ceiling and finishes. minor alterations non structural to partitions, millwork, lighting, finishes, ceiling. demo previously under 2024-0724-7175 | $100,000 |
| Jul 29, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | mb2-2nd level: additional scope to 202406124318, food service equipment alterations at servery, dishwasing & beverage stations and deffered mep under pa# 202406124318.Details
mb2-2nd level: additional scope to 202406124318, food service equipment alterations at servery, dishwasing & beverage stations and deffered mep under pa# 202406124318. | $120,000 |
| Jul 29, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | mb2 level 1: additional scope to 202406255225: food service equipment alteration at coffee point. deferred mep under pa #202406255225Details
mb2 level 1: additional scope to 202406255225: food service equipment alteration at coffee point. deferred mep under pa #202406255225 | $95,000 |
| Jul 25, 2024 | Completed final sign-off Dec 2024 | 1515 03rd St | Principal Builders Inc. | mb2-level 6: demolition of (e) partitions and finishes. no ceiling scope included in this scope of work, to be permitted separately. remain vacant per ab-017Details
mb2-level 6: demolition of (e) partitions and finishes. no ceiling scope included in this scope of work, to be permitted separately. remain vacant per ab-017 | $100,000 |
| Jul 25, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting.Details
mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting. | $3,999,516 |
| Jul 24, 2024 | Completed final sign-off Dec 2024 | 1515 03rd St | Principal Builders Inc. | mb2/ level 4: demo for e) partitions, doors, & finishes. no work to e) ceiling included in this demo permitDetails
mb2/ level 4: demo for e) partitions, doors, & finishes. no work to e) ceiling included in this demo permit | $100,000 |
| Jun 25, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | 1/f: minor alterations of (e) coffee bar. limited demo, new millwork and finishes, new lighting scope indicated for design intent, mep scope under deferred permit. dph approval under separate permit.Details
1/f: minor alterations of (e) coffee bar. limited demo, new millwork and finishes, new lighting scope indicated for design intent, mep scope under deferred permit. dph approval under separate permit. | $600,000 |
| Jun 12, 2024 | Completed final sign-off Apr 2025 | 1515 03rd St | Principal Builders Inc. | 2/f: minor alteration of (e) servery and commercial kitchen. limited demo, new non-load bearing partitions, millwork, and finishes.Details
2/f: minor alteration of (e) servery and commercial kitchen. limited demo, new non-load bearing partitions, millwork, and finishes. | $220,000 |
| May 22, 2023 | Expired or cancelled cancelled Jan 2026 | 1515 03rd St | double side electrical haning sign, 6.25 sf | $2,000 | |
| May 22, 2023 | Expired or cancelled cancelled Jan 2026 | 1515 03rd St | single side electrical box sign, "palmetto superfood" 10.63 sfDetails
single side electrical box sign, "palmetto superfood" 10.63 sf | $3,000 | |
| Oct 5, 2022 | Never finaled issued Mar 2023, no final | 1519 03rd St | Cbs Construction Inc. | renovate (e) new, previously unused tenant space intended for restaurant use w/a new restaurant, install sinks, electrical, plumbing & mechanical, provide (n) flooring, cove bases, (n) ceiling, (n) ada bath, (n) counter, (n) walls, install freezers + refrigerator & shelves.Details
renovate (e) new, previously unused tenant space intended for restaurant use w/a new restaurant, install sinks, electrical, plumbing & mechanical, provide (n) flooring, cove bases, (n) ceiling, (n) ada bath, (n) counter, (n) walls, install freezers + refrigerator & shelves. | $105,000 |
| Mar 11, 2022 | Never finaled issued Mar 2022, no final | 1515 03rd St | Siemens Industry, Inc. | fire only work for the "plentea" remodel on level 1; additions are a monitor module and 3 speaker/strobes. ref paDetails
fire only work for the "plentea" remodel on level 1; additions are a monitor module and 3 speaker/strobes. ref pa | $2,450 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 1515 03rd St | Acco Engineered Systems Inc. Dba Acco En | install new tchw fan coil, pipiing & duct as shown on plans to supplement cooling in storage room.Details
install new tchw fan coil, pipiing & duct as shown on plans to supplement cooling in storage room. | $165,000 |
| Dec 10, 2021 | Completed final sign-off Sep 2024 | 1515 03rd St | Triad Fire Protection System | g/f: add 3 upright spirnkler sand 8 pendent sprinklers to accommodate new t.i. 202108035618Details
g/f: add 3 upright spirnkler sand 8 pendent sprinklers to accommodate new t.i. 202108035618 | $8,931 |
| Sep 13, 2021 | Never finaled issued Sep 2021, no final | 1515 03rd St | Cosco Fire Protection Inc. | adjust (e) fire sprinklers where door actuators present an obstruction on levels 3,4,5,6. relocate 10 total sprinklers.Details
adjust (e) fire sprinklers where door actuators present an obstruction on levels 3,4,5,6. relocate 10 total sprinklers. | $13,000 |
| Aug 16, 2021 | Completed final sign-off Sep 2021 | 1515 03rd St | 6/f: fire sprinkler permit. relocate 2 sprinklers for new restroom. ref. ti pa 202106011405Details
6/f: fire sprinkler permit. relocate 2 sprinklers for new restroom. ref. ti pa 202106011405 | $1,000 | |
| Aug 12, 2021 | Completed final sign-off Sep 2021 | 1515 03rd St | Siemens Industry, Inc. | 6th fl l- fire only work to add a smoke detector in the all gender restroom. ref pa 2021-0601-1405Details
6th fl l- fire only work to add a smoke detector in the all gender restroom. ref pa 2021-0601-1405 | $635 |
| Aug 5, 2021 | Completed final sign-off Nov 2021 | 1515 03rd St | Truebeck Construction | add ada door operators to 14 atrium doors on levels 3-6Details
add ada door operators to 14 atrium doors on levels 3-6 | $14,000 |
| Aug 3, 2021 | Completed final sign-off Dec 2022 | 1515 03rd St | First Restaurant Builders | t.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well.Details
t.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well. | $165,000 |
| Jun 1, 2021 | Completed final sign-off Nov 2021 | 1515 03rd St | level 6: all gender restroom addition, new plumbing , fixtures , millwork, cabinets, design build mepDetails
level 6: all gender restroom addition, new plumbing , fixtures , millwork, cabinets, design build mep | $39,000 | |
| Feb 24, 2021 | Never finaled issued Apr 2021, no final | 1515 03rd St | Truebeck Construction | at district inspector's request, revision #6 to site permit #201508245062 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201910164596Details
at district inspector's request, revision #6 to site permit #201508245062 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201910164596 | |
| Feb 18, 2021 | Completed final sign-off Mar 2021 | 1515 03rd St | Siemens Industry, Inc. | as-built permit for the 2-way communication system; 6 call station were added an installed to the original scope of work under permit app # 2015 0824 5062 (addenda 9)Details
as-built permit for the 2-way communication system; 6 call station were added an installed to the original scope of work under permit app # 2015 0824 5062 (addenda 9) | $3,000 |
| Jan 28, 2021 | Never finaled issued Mar 2021, no final | 1515 03rd St | request correct stamp for occupant [illegible] fire dept only review for assembly permit scope of work addedDetails
request correct stamp for occupant [illegible] fire dept only review for assembly permit scope of work added | ||
| Oct 3, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | installation of accelerograph per ab 58.Details
installation of accelerograph per ab 58. | |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to pa# 201508245062 s3. to update standpipe locations at occupied roof deck to match site addendum s8 for fire sprinklers.Details
revision to pa# 201508245062 s3. to update standpipe locations at occupied roof deck to match site addendum s8 for fire sprinklers. | |
| Sep 16, 2020 | Completed final sign-off Nov 2020 | 1515 03rd St | Truebeck Construction | mb2--fabricate & install evacuation signage for levels 1 to 7Details
mb2--fabricate & install evacuation signage for levels 1 to 7 | $10,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2022 | 1515 03rd St | Siemens Industry, Inc. | 1515 3rd lvel 1 fire alarm. additons are 6 smoke detectors. 9 duct detectors, 13 modules and speaker strobes, ref 201810032102Details
1515 3rd lvel 1 fire alarm. additons are 6 smoke detectors. 9 duct detectors, 13 modules and speaker strobes, ref 201810032102 | $43,600 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 1515 03rd St | Siemens Industry, Inc. | level 6: fire alarm additions are 25 smoke detectors, 12 duct detectors, 2 heat detectors, 26 modules, 1 strobes power supply, 10 speakers, and 61 speaker/ strobes. ref app#201810032104Details
level 6: fire alarm additions are 25 smoke detectors, 12 duct detectors, 2 heat detectors, 26 modules, 1 strobes power supply, 10 speakers, and 61 speaker/ strobes. ref app#201810032104 | $95,800 |
| Aug 22, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to bpa#201912068963 to provide stainless steel truss details that form the superstructore of the "orbital" structureDetails
revision to bpa#201912068963 to provide stainless steel truss details that form the superstructore of the "orbital" structure | |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this sign is a 1 face non-illuminated "1515 third street" facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this sign is a 1 face non-illuminated "1515 third street" facing west. | $200 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this is a 1 face non-illuminated sign "uber" facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this is a 1 face non-illuminated sign "uber" facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street. this is a free standing wayfinding totem facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street. this is a free standing wayfinding totem facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | pierpoint ln east and west entrances - master signage plan per g-04. this permit submission includes 2 free-standing exterior wayfinding totem signage on pierpoint lane at east and west entrances at bridgeview way & third street.Details
pierpoint ln east and west entrances - master signage plan per g-04. this permit submission includes 2 free-standing exterior wayfinding totem signage on pierpoint lane at east and west entrances at bridgeview way & third street. | $500 |
| Aug 11, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | revision to app#201508245062 to incorporate revised bridge seismic joint fire protection strategy, including pre-app min, report & 3rd party review.Details
revision to app#201508245062 to incorporate revised bridge seismic joint fire protection strategy, including pre-app min, report & 3rd party review. | |
| Jul 17, 2020 | Never finaled issued Aug 2020, no final | 1515 03rd St | Truebeck Construction | pierpoint lane - revision to pa#201912068963 to provide stub column details. structural onlyDetails
pierpoint lane - revision to pa#201912068963 to provide stub column details. structural only | |
| Jun 29, 2020 | Never finaled issued Nov 2020, no final | 1515 03rd St | Fuel Oil System | revision to pa# 2018-0410-5954 & 2019-0514-0594. add solenoid valve, bypass ball valve, flow switch, and flow sight to fill pipe at the generator to match the generator permit.Details
revision to pa# 2018-0410-5954 & 2019-0514-0594. add solenoid valve, bypass ball valve, flow switch, and flow sight to fill pipe at the generator to match the generator permit. | |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a ground, non electric sing (south of 1455 03rd st)pierpoint lane.**maher n/a**Details
to erect a ground, non electric sing (south of 1455 03rd st)pierpoint lane.**maher n/a** | $500 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a singled faced, non-electric sign. includes building identification signage at the entry. "uber" **maher n/a**Details
to erect a singled faced, non-electric sign. includes building identification signage at the entry. "uber" **maher n/a** | $5,000 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a ground, non-electric sign.free standing exterior wayfinding totem signage at the entry of 1515 rd st**maher n/a**Details
to erect a ground, non-electric sign.free standing exterior wayfinding totem signage at the entry of 1515 rd st**maher n/a** | $500 |
| Jun 19, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a non electric,single faced, door/window sign."1515 third st"**maher n/a**Details
to erect a non electric,single faced, door/window sign."1515 third st"**maher n/a** | $200 |
| May 14, 2020 | Never finaled issued May 2020, no final | 1515 03rd St | street space | ||
| May 5, 2020 | Never finaled issued May 2020, no final | 1515 03rd St | Truebeck Construction | revision to 201911268230. smoke control matrix has been revised to clarify actions for atrium skylights as noted in ti permit setDetails
revision to 201911268230. smoke control matrix has been revised to clarify actions for atrium skylights as noted in ti permit set | |
| Mar 16, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Siemens Industry, Inc. | 2nd fl - fire alarm work for "uber" redmoel (and mechanical level 7); additions are 14 duct detectors, 33 modules, 1 strobe power supply, 5 speakers, and 41 speaker/strobes. ref pa 2018-0828-8577Details
2nd fl - fire alarm work for "uber" redmoel (and mechanical level 7); additions are 14 duct detectors, 33 modules, 1 strobe power supply, 5 speakers, and 41 speaker/strobes. ref pa 2018-0828-8577 | $69,400 |
| Mar 9, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Siemens Industry, Inc. | level 5: fire alarm work due to ti. addition of 2 smoke detectors, 2 duct detectors, 1 module, 2 strobe power supplies, 12 spearks and 64 speaker/strobes. ref t.i. pa201903256122Details
level 5: fire alarm work due to ti. addition of 2 smoke detectors, 2 duct detectors, 1 module, 2 strobe power supplies, 12 spearks and 64 speaker/strobes. ref t.i. pa201903256122 | $55,100 |
| Mar 6, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Siemens Industry, Inc. | 4th fl - fire alarm work for "uber". additions are 2 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 10 speakers, and 59 speaker/strobes ref pa 2019-0325-6120Details
4th fl - fire alarm work for "uber". additions are 2 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 10 speakers, and 59 speaker/strobes ref pa 2019-0325-6120 | $50,330 |
| Mar 6, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Siemens Industry, Inc. | 3rd fl - fire alarm work for the "uber" remodel. additions are 2 smoke detectors, 2 duct detectors, 1 modoule, 2 strobe power supplies, 12 speakers, and 64 speaker/strobes. ref pa 2019-0215-3056Details
3rd fl - fire alarm work for the "uber" remodel. additions are 2 smoke detectors, 2 duct detectors, 1 modoule, 2 strobe power supplies, 12 speakers, and 64 speaker/strobes. ref pa 2019-0215-3056 | $56,350 |
| Mar 2, 2020 | Never finaled issued Mar 2020, no final | 1515 03rd St | street space | ||
| Feb 27, 2020 | Completed final sign-off Nov 2020 | 1515 03rd St | revision to pa# 2015-0824-5062 s16.Details
revision to pa# 2015-0824-5062 s16. | $50,000 | |
| Feb 19, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to 201508245062. to show pierpoint ln retractable bollard wiring diagrham and fire alarm control tie insDetails
revision to 201508245062. to show pierpoint ln retractable bollard wiring diagrham and fire alarm control tie ins | $10,000 |
| Feb 19, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | rev to pa# 201511183013; pier point ln revision to add fixed & retractable crash rated bullards along 3rdt st & bridgeview way, automatic, retractable bollards are provided where located in the approved fire lane ref f-p-00 for sequence of opsDetails
rev to pa# 201511183013; pier point ln revision to add fixed & retractable crash rated bullards along 3rdt st & bridgeview way, automatic, retractable bollards are provided where located in the approved fire lane ref f-p-00 for sequence of ops | |
| Jan 29, 2020 | Never finaled issued Feb 2020, no final | 1515 03rd St | Truebeck Construction | mb2 4-7: revision to pa #2015-0824-5062: mb2 level 1-7 bulletin 18: updated smokre control supplement report for ti areas. show added smoke dampers by the base building.Details
mb2 4-7: revision to pa #2015-0824-5062: mb2 level 1-7 bulletin 18: updated smokre control supplement report for ti areas. show added smoke dampers by the base building. | |
| Jan 24, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to obtain final inspection for work approved under pa #201706139225, 201607182149. all work is complete.Details
to obtain final inspection for work approved under pa #201706139225, 201607182149. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | renewal of pa# 201704133912 for final inspection. all work is complete.Details
renewal of pa# 201704133912 for final inspection. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | renewal of pa# 201608306382, 201606079326, 201612225733 for final inspection. all work is complete.Details
renewal of pa# 201608306382, 201606079326, 201612225733 for final inspection. all work is complete. | |
| Jan 14, 2020 | Never finaled issued Nov 2020, no final | 1515 03rd St | Truebeck Construction | administrative permit to memorialize installation requirement per ab005 for framery phone booths as shown in ti permits n/a maherDetails
administrative permit to memorialize installation requirement per ab005 for framery phone booths as shown in ti permits n/a maher | |
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | 1st fl tenant improvement for art installation in lobby//vif card readers in av room and the 'request to leave' featureDetails
1st fl tenant improvement for art installation in lobby//vif card readers in av room and the 'request to leave' feature | $50,000 | |
| Dec 12, 2019 | Completed final sign-off Dec 2020 | 1515 03rd St | Cosco Fire Protection Inc. | add 159 ti fire sprinkler headsDetails
add 159 ti fire sprinkler heads | $40,000 |
| Dec 6, 2019 | Completed final sign-off May 2021 | 1515 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed pierpoint lane.Details
installation of art on (e) privately owned, publicly accessed pierpoint lane. | $30,000 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 1515 03rd St | street space | ||
| Nov 26, 2019 | Never finaled issued Dec 2019, no final | 1515 03rd St | Truebeck Construction | revision to pa 2019-0830-0342 smoke control matrix has been revised to clarify actions for ti design ahu's, dampers and split smoke zone on level 6Details
revision to pa 2019-0830-0342 smoke control matrix has been revised to clarify actions for ti design ahu's, dampers and split smoke zone on level 6 | |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 1515 03rd St | Truebeck Construction | revision to approved plumbing permit #201905171025. revised grading and added bollards at pierpoint lane and open spaceDetails
revision to approved plumbing permit #201905171025. revised grading and added bollards at pierpoint lane and open space | |
| Oct 16, 2019 | Never finaled issued Sep 2020, no final | 1515 03rd St | Truebeck Construction | revision to issued permit# 2015-0824-5062 addendum# 3 to incorporate changes to various life safety, egress path, door schedule, room layout, and misc drawings.**maher n/a**Details
revision to issued permit# 2015-0824-5062 addendum# 3 to incorporate changes to various life safety, egress path, door schedule, room layout, and misc drawings.**maher n/a** | |
| Sep 30, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | mb2-l1 - revision to previously approved pa #201810032102. scope of work includes revisions to architectural walls, ceilings, structure and mep tsav. maher naDetails
mb2-l1 - revision to previously approved pa #201810032102. scope of work includes revisions to architectural walls, ceilings, structure and mep tsav. maher na | ||
| Aug 30, 2019 | Never finaled issued Sep 2019, no final | 1515 03rd St | Truebeck Construction | revisionto approved pa #201901049633. smoke control panel & sequence of operations have been revised to account for t.i. design including smoke zone on level 6 & including t.i. equipment in the smoke control matrix & sequence. refer to g-s-001 for detail narrative of changes. maher naDetails
revisionto approved pa #201901049633. smoke control panel & sequence of operations have been revised to account for t.i. design including smoke zone on level 6 & including t.i. equipment in the smoke control matrix & sequence. refer to g-s-001 for detail narrative of changes. maher na | |
| Aug 19, 2019 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | admin permit to correct app # incorectly recorded on the dwgs and job card/ adden 1 of site permit 201511183013 for pier point lane, aka lot 22 the correct app # for this adden dwgs & job card is 201511183013Details
admin permit to correct app # incorectly recorded on the dwgs and job card/ adden 1 of site permit 201511183013 for pier point lane, aka lot 22 the correct app # for this adden dwgs & job card is 201511183013 | |
| Jul 31, 2019 | Never finaled issued Dec 2019, no final | 1515 03rd St | Truebeck Construction | structural, mechanical, ele, plumbing engineering and deisign for a complete and operational fuel cell system that will serve future telecommunications and network rooms in building. tlecommunications and network rooms under ti maher not reqDetails
structural, mechanical, ele, plumbing engineering and deisign for a complete and operational fuel cell system that will serve future telecommunications and network rooms in building. tlecommunications and network rooms under ti maher not req | $75,000 |
| Jul 23, 2019 | Completed final sign-off Nov 2024 | 1515 03rd St | Cosco Fire Protection Inc. | 6/f: added 276 new sprinkler head for l6 t.1.Details
6/f: added 276 new sprinkler head for l6 t.1. | $40,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2021 | 1515 03rd St | Cosco Fire Protection Inc. | added 224 new sprinkler heads for l5 tiDetails
added 224 new sprinkler heads for l5 ti | $30,000 |
| Jul 15, 2019 | Never finaled issued Jul 2019, no final | 1515 03rd St | street space | ||
| Jun 28, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to approved plumbing permit #2018-1002-2074. inspector in field has requested all pages to be stamped approved. plumbing only. updated utility plans.Details
revision to approved plumbing permit #2018-1002-2074. inspector in field has requested all pages to be stamped approved. plumbing only. updated utility plans. | |
| Jun 10, 2019 | Completed final sign-off Dec 2021 | 1515 03rd St | Cosco Fire Protection Inc. | tenant improvement to be performed to the 4th fl. added 203 sprinkler headsDetails
tenant improvement to be performed to the 4th fl. added 203 sprinkler heads | $25,000 |
| May 17, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | plumbing review. revision to pa# 2018-1002-2074. installation of man holes & sandtrap for perpoint ln & open space.Details
plumbing review. revision to pa# 2018-1002-2074. installation of man holes & sandtrap for perpoint ln & open space. | |
| May 14, 2019 | Never finaled issued May 2019, no final | 1515 03rd St | Truebeck Construction | revision to 201804105954 fire only. relocate remote fill enclosure from the insoide of the wall to the outside of same wall. elec equipment easement for the area in front of n enclosure has been modified to include remote fillDetails
revision to 201804105954 fire only. relocate remote fill enclosure from the insoide of the wall to the outside of same wall. elec equipment easement for the area in front of n enclosure has been modified to include remote fill | |
| May 8, 2019 | Completed final sign-off Dec 2020 | 1515 03rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | 2nd fl- furnish and install 3 ansul r-102 fire systems in the main kitchen; furnish and install the 2 ansul r-102 fire systems in the pollution control units on the roof. ref pa 2018-0828-8577Details
2nd fl- furnish and install 3 ansul r-102 fire systems in the main kitchen; furnish and install the 2 ansul r-102 fire systems in the pollution control units on the roof. ref pa 2018-0828-8577 | $35,000 |
| May 7, 2019 | Never finaled issued May 2019, no final | 1515 03rd St | street space | ||
| Apr 24, 2019 | Never finaled issued Apr 2019, no final | 1509 03rd St | change address per owner at pa #201508245061 from 1517, 1521 3rd street to 1509 3rd street.Details
change address per owner at pa #201508245061 from 1517, 1521 3rd street to 1509 3rd street. | ||
| Apr 16, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to 201810032104 to include: egress, floor layout, mep & security, tech & audio-visualDetails
revision to 201810032104 to include: egress, floor layout, mep & security, tech & audio-visual | |
| Apr 16, 2019 | Completed final sign-off Dec 2020 | 1515 03rd St | Cosco Fire Protection Inc. | t.i. to be performed to the 3rd fl. added 210 sprinkler heads n/a maherDetails
t.i. to be performed to the 3rd fl. added 210 sprinkler heads n/a maher | $25,000 |
| Mar 25, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 5th flr - revision to 201807245439 - interior walls, floors, finishes & mep maher naDetails
5th flr - revision to 201807245439 - interior walls, floors, finishes & mep maher na | |
| Mar 25, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 4th flr - revision to 201807245435 - interior walls, floors, finishes & mep maher naDetails
4th flr - revision to 201807245435 - interior walls, floors, finishes & mep maher na | |
| Mar 5, 2019 | Never finaled issued Mar 2019, no final | 1517 03rd St | per pa #201508245061, add address to block 8721, lot 029 as; 1517, 1519, 1521 03rd street.Details
per pa #201508245061, add address to block 8721, lot 029 as; 1517, 1519, 1521 03rd street. | ||
| Feb 15, 2019 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to approved bpa #201807245434 - work to include interior wall & floor improvements. new finsihes, mep, tech, security av. fully sprinklered building. access floor to be under separate deferred submittal.Details
revision to approved bpa #201807245434 - work to include interior wall & floor improvements. new finsihes, mep, tech, security av. fully sprinklered building. access floor to be under separate deferred submittal. | |
| Jan 30, 2019 | Completed final sign-off Dec 2020 | 1515 03rd St | Cosco Fire Protection Inc. | 2nd flr sprinkler t.i. adding 128 pendant sprinkler headsDetails
2nd flr sprinkler t.i. adding 128 pendant sprinkler heads | $21,000 |
| Jan 4, 2019 | Never finaled issued Jan 2019, no final | 1515 03rd St | Truebeck Construction | revision to bpa 201508245062 s3 for sequence operations changesDetails
revision to bpa 201508245062 s3 for sequence operations changes | |
| Oct 3, 2018 | Completed final sign-off Jun 2021 | 1515 03rd St | Truebeck Construction | 6th fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, food prep, bathroomsDetails
6th fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, food prep, bathrooms | $5,439,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 1st fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, bathroomsDetails
1st fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, bathrooms | $3,441,000 |
| Oct 2, 2018 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to pa#201801128537. water flow information in conjunction with new bldg construction under pa#201508245062 per plumbing inspection results.Details
revision to pa#201801128537. water flow information in conjunction with new bldg construction under pa#201508245062 per plumbing inspection results. | |
| Aug 28, 2018 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 2nd fl - (n) interior to include: non-structural partitions, finishes, casework, millwork. (n) mep: tech, security, av. (n) cafeteria: kitchen equipment & dishwashing areaDetails
2nd fl - (n) interior to include: non-structural partitions, finishes, casework, millwork. (n) mep: tech, security, av. (n) cafeteria: kitchen equipment & dishwashing area | $11,880 |
| Aug 28, 2018 | Completed final sign-off May 2021 | 1515 03rd St | Truebeck Construction | 7th fl - (n) casework, millwork, (n) mep, including lighting & plumbing. (n) av, security tech. full sprinklered a3 occupant load is 366Details
7th fl - (n) casework, millwork, (n) mep, including lighting & plumbing. (n) av, security tech. full sprinklered a3 occupant load is 366 | $50,000 |
| Jul 24, 2018 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 4th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathroomsDetails
4th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathrooms | $8,100,000 |
| Jul 24, 2018 | Never finaled issued Oct 2018, no final | 1515 03rd St | Truebeck Construction | 3rd flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) tech, security and a.v. breakrooms, food prep, bathroomsDetails
3rd flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) tech, security and a.v. breakrooms, food prep, bathrooms | $8,190,000 |
| Jul 24, 2018 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | 5th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathroomsDetails
5th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathrooms | $8,000,000 |
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 1515 03rd St | street space permit - renewal of permit #m851027Details
street space permit - renewal of permit #m851027 | ||
| Apr 10, 2018 | Never finaled issued Aug 2018, no final | 1515 03rd St | Truebeck Construction | deferred fuel oil permit associated with approved site permit #2015-0824-5062.Details
deferred fuel oil permit associated with approved site permit #2015-0824-5062. | |
| Apr 10, 2018 | Never finaled issued Oct 2018, no final | 1515 03rd St | Truebeck Construction | deferred fire department air replenishment system associated with site permit #2015-0824-5062. relaces addendum 12 pf site permit.Details
deferred fire department air replenishment system associated with site permit #2015-0824-5062. relaces addendum 12 pf site permit. | |
| Apr 5, 2018 | Completed final sign-off Mar 2021 | 1515 03rd St | Gecms Inc/Mcguire And Hester Joint Ventu | installation of new 8-inch fire service off of 12-inch main on south st. from street curb at sidewalk to 5 feet from building. reference #201508245062. comply w/ maher ord 155-13.Details
installation of new 8-inch fire service off of 12-inch main on south st. from street curb at sidewalk to 5 feet from building. reference #201508245062. comply w/ maher ord 155-13. | $64,500 |
| Jan 12, 2018 | Never finaled issued Oct 2018, no final | 1515 03rd St | Truebeck Construction | water flow information in conjunction w/ new bldg construction under pa #2015-0824-5062, per plumbing inspectors request.Details
water flow information in conjunction w/ new bldg construction under pa #2015-0824-5062, per plumbing inspectors request. | |
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 1515 03rd St | street space | ||
| Oct 30, 2017 | Completed final sign-off Apr 2025 | 1515 03rd St | Cosco Fire Protection Inc. | revision to app #201704133912. relocate fdc on 3rd st. maher naDetails
revision to app #201704133912. relocate fdc on 3rd st. maher na | $17,000 |
| Jul 18, 2017 | Completed final sign-off Oct 2020 | 1515 03rd St | Truebeck Construction | revision to app#201606039047. scope to revise piles based on field conditions. n/a for maherDetails
revision to app#201606039047. scope to revise piles based on field conditions. n/a for maher | |
| Jun 13, 2017 | Expired or cancelled expired Mar 2021 | 1515 03rd St | Truebeck Construction | tower crane foundation & erection for (n) bldg under pa 2015-0824-5062Details
tower crane foundation & erection for (n) bldg under pa 2015-0824-5062 | $50,000 |
| Apr 13, 2017 | Completed final sign-off Dec 2020 | 1515 03rd St | Cosco Fire Protection Inc. | revision to app#201701257866. add fdc to 3rd street and add back flow preventer.Details
revision to app#201701257866. add fdc to 3rd street and add back flow preventer. | $17,000 |
| Jan 25, 2017 | Never finaled issued Jan 2017, no final | 1515 03rd St | Cosco Fire Protection Inc. | 2 8" fire services 5ft out from building maher not req coordinate with the issued site permitDetails
2 8" fire services 5ft out from building maher not req coordinate with the issued site permit | $17,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2020 | 1515 03rd St | Truebeck Construction | construction of shoring wall in association of bld construction at 1455 3rd 106 ft of wall with 29 tiebacks within property and 1 tiebacks encroaching along 3rd street maher naDetails
construction of shoring wall in association of bld construction at 1455 3rd 106 ft of wall with 29 tiebacks within property and 1 tiebacks encroaching along 3rd street maher na | $50,000 |
| Aug 30, 2016 | Completed final sign-off Nov 2020 | 1515 03rd St | Truebeck Construction | soil improvements test array, in advance of construction. work includes installation of stone columns, per geotechnical engineers recommendationsDetails
soil improvements test array, in advance of construction. work includes installation of stone columns, per geotechnical engineers recommendations | $10,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2020 | 1515 03rd St | Truebeck Construction | indicator piles associated with/production pile permit 201606039047 maher naDetails
indicator piles associated with/production pile permit 201606039047 maher na | $10,000 |
| Jun 7, 2016 | Completed final sign-off Oct 2020 | 1515 03rd St | Truebeck Construction | demo & excavation in advance of (n) bldg park & public thruway under separate permit #201508245071. work includes site preparation & grading #201511182997Details
demo & excavation in advance of (n) bldg park & public thruway under separate permit #201508245071. work includes site preparation & grading #201511182997 | $40,000 |
| Jun 3, 2016 | Completed final sign-off Nov 2020 | 1515 03rd St | Truebeck Construction | soil improvements in advance of construction of new building under site permit 201508245062: work includes installation of stone columns per geotech engineers. n/a for maher ordinance no.155-13.Details
soil improvements in advance of construction of new building under site permit 201508245062: work includes installation of stone columns per geotech engineers. n/a for maher ordinance no.155-13. | $100,000 |
| Jun 3, 2016 | Completed final sign-off Oct 2020 | 1515 03rd St | Truebeck Construction | installation of piles in advance of construction of new building under site permit 201508245065: work includes installation of (268) 16/26 tubex piles and (14) existing 14" precast piles. n/a for maher ordinance no. 155-13.Details
installation of piles in advance of construction of new building under site permit 201508245065: work includes installation of (268) 16/26 tubex piles and (14) existing 14" precast piles. n/a for maher ordinance no. 155-13. | $150,000 |
| Nov 18, 2015 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | renovation of (e) private lane, adjacent to (n) bldg submitted under appln #201508245062 lot 22: pierpoint lane. scope includes (n) landscaping, benches, & utilities below grade.Details
renovation of (e) private lane, adjacent to (n) bldg submitted under appln #201508245062 lot 22: pierpoint lane. scope includes (n) landscaping, benches, & utilities below grade. | $4,000,000 |
| Aug 24, 2015 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | erect 7-story, type 1, no basement, office/retail bldg.Details
erect 7-story, type 1, no basement, office/retail bldg. | $57,684,393 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (60), Principal Builders Inc. (17), Siemens Industry, Inc. (15), Cosco Fire Protection Inc. (10), Aaa Restaurant Fire Control/Dba Aaa Fire, Acco Engineered Systems Inc. Dba Acco En, Cbs Construction Inc., First Restaurant Builders, Fuel Oil System, Gecms Inc/Mcguire And Hester Joint Ventu, Triad Fire Protection System
- Architects
- Coren D Sharples (14), Luda Hoe (11), Stanley H Lew (8), Alfred Quezada (3), Alfred Quezada, Jr, Ceren Sharples, Gensler Gensler, Janet Coral Campbell, Julio Guerrero Jr, Red Cloud Wireless
- Engineers
- Erik Elmtoft (2), John Worley (2), Lars P. Mortensen (2), Stephen Shaffer (2), Charles Lew, David Gateno, Fini Jafar, Fini Jafar, Hassan Ally, Jefferey Tarantino, Leo Panian, Leonard M. Rose, Mark Koenigs, Marvin Byrl Williams, Robert Nixdorf, Ronald Zeiger, Ryan Laureta, Saied Nazeri, Sherry Chaumpluke, Stanley H Lew
- Authorized agents
- Lawrence Connell
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.