Block 8721, lot 029
1515 03rd St
134 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 26, 2026 | Completed | 1515 03rd St | Principal Builders Inc. | to obtain final inspection for work approved under pa# 202410112789. all work is complete. | |
| Nov 10, 2025 | In progress | 1515 03rd St | Siemens Industry, Inc. | fire only work to replace 4 existing beam detector sets at the atriums of floor, 2, 4 & 5; 3 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system addition only) | $23,815 |
| Feb 4, 2025 | Completed | 1515 03rd St | Principal Builders Inc. | 3/fl-rev 202408289660- (n) non structural partitions. | $30,000 |
| Jan 21, 2025 | Completed | 1515 03rd St | R L H Fire Protection Inc | 5th fl -revision to fire pa 202410173099 added ceiling to library 02-0539 relocated 10 fire sprinklers and deleted 6. 202408309841 | $1,000 |
| Dec 10, 2024 | In progress | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on fl 1, additons of 2 duct detectors 4 modules, 2 speakers/strobes and the relocation of 3 speaker/strobes rep pa # 2024-0729-7454 | $12,560 |
| Dec 5, 2024 | Completed | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on floor 6. additoins are 6 speaker strobes and 11 strobes, as well s the relocation of 8 speaker strobes. ref 202407257306 | $20,285 |
| Dec 5, 2024 | Completed | 1515 03rd St | Siemens Industry, Inc. | fire only work for the open ai remodel on floor 3. additions are 1 strobe power, 1 module supply, 12 speaker/strobes, 36 strobes.11 speaker strobes being relocated ref 202408289660 | $51,240 |
| Nov 14, 2024 | Completed | 1515 03rd St | Siemens Industry, Inc. | 5th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, 1 module, 12 speaker/strobes, 31 strobes and relocation of 8 speaker/strobes. ref pa 202408309841 | $45,250 |
| Nov 14, 2024 | Completed | 1515 03rd St | Siemens Industry, Inc. | 4th fl - fire only work for the "open ai" remodel. additions are 1 strobe power supply, module, 15 speaker/strobes, 35 strobes and relocation of 8 speaker/strobes. ref pa 202408068093 | $50,600 |
| Oct 29, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | addition of prefabricated aluminum pavilion structure at the existing roof. | $100,000 |
| Oct 17, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | 5th floor. ti fire sprinkler relocate 25, add 27 fire sprinklers t.i. # 2024-0830-9841 (5th fl.) | $13,250 |
| Oct 17, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | 3rd floor. ti fire sprinkler relocate 28, add 37 fire sprinklers t.i. # 2024-0828-9660 | $10,000 |
| Oct 11, 2024 | Expired or cancelled | 1515 03rd St | Principal Builders Inc. | l7 terrace mb2 wprl omc;ides mew exterior partions millwork finishes and lighting | $75,000 |
| Oct 4, 2024 | In progress | 1515 03rd St | Principal Builders Inc. | mb2, l3 - l6 micro kitchen health dept review | |
| Sep 20, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | 4/f: t.i. fire sprinklers: relocate 31, add 40 f/s. ref t.i. pa 202408068093. | $35,000 |
| Sep 17, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | level 6/mission bay 2- install 2 new tempered chilled water fan coils. install 1 new cooling only van. relocate & demo swirl diffusers as required. rebalance e) vav's as required. install new ductwork & pipe as requried | $60,000 |
| Sep 16, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | t.i. fire sprinkler, relocate 27, add 4, delete 20 fire sprinklers. t.i. 202407257306 | $9,000 |
| Sep 12, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | ti fire sprinklers, relocate 5, add 1 fire sprinkler. 202406255225. | $2,500 |
| Sep 12, 2024 | Completed | 1515 03rd St | R L H Fire Protection Inc | ti fire sprinklers, relocate 2, add 1 fire sprinkler. ti 2024056124318 | $2,500 |
| Aug 30, 2024 | In progress | 1515 03rd St | Principal Builders Inc. | level 5 - demo (e) ceiling & finishes. minor alterations to (e) non structural partitions, suspended ceiling, 9n) millwork & finishes & (n) lighting. demo previously under pa 202408098376 | $3,999,516 |
| Aug 28, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | level 3: demo e ceiling and finishes. minor alterations to e non structural partitions, millwork, finishes, suspended ceilings, and new lighting | $3,999,516 |
| Aug 16, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | level 4: deferred mep for pa# 202408058093. | $70,000 |
| Aug 9, 2024 | Completed | 1515 03rd St | level 5, mb2. demo (e) non-structural partitons, doors, finishes. no work on (e) ceiling. per ab-017 | $62,883 | |
| Aug 6, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | level 4 mb2. demo e ceiling and finishes. minor alterations non structural to partitions, millwork, lighting, finishes, ceiling. demo previously under 2024-0724-7175 | $100,000 |
| Jul 29, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | mb2 level 1: additional scope to 202406255225: food service equipment alteration at coffee point. deferred mep under pa #202406255225 | $95,000 |
| Jul 29, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | mb2-2nd level: additional scope to 202406124318, food service equipment alterations at servery, dishwasing & beverage stations and deffered mep under pa# 202406124318. | $120,000 |
| Jul 25, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | mb2-level 6. minor alterations of existing office and bearing partitions, new millwork and finishes, and selective new lighting. | $3,999,516 |
| Jul 25, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | mb2-level 6: demolition of (e) partitions and finishes. no ceiling scope included in this scope of work, to be permitted separately. remain vacant per ab-017 | $100,000 |
| Jul 24, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | mb2/ level 4: demo for e) partitions, doors, & finishes. no work to e) ceiling included in this demo permit | $100,000 |
| Jun 25, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | 1/f: minor alterations of (e) coffee bar. limited demo, new millwork and finishes, new lighting scope indicated for design intent, mep scope under deferred permit. dph approval under separate permit. | $600,000 |
| Jun 12, 2024 | Completed | 1515 03rd St | Principal Builders Inc. | 2/f: minor alteration of (e) servery and commercial kitchen. limited demo, new non-load bearing partitions, millwork, and finishes. | $220,000 |
| May 22, 2023 | Expired or cancelled | 1515 03rd St | single side electrical box sign, "palmetto superfood" 10.63 sf | $3,000 | |
| May 22, 2023 | Expired or cancelled | 1515 03rd St | double side electrical haning sign, 6.25 sf | $2,000 | |
| Oct 5, 2022 | Never finaled | 1519 03rd St | Cbs Construction Inc. | renovate (e) new, previously unused tenant space intended for restaurant use w/a new restaurant, install sinks, electrical, plumbing & mechanical, provide (n) flooring, cove bases, (n) ceiling, (n) ada bath, (n) counter, (n) walls, install freezers + refrigerator & shelves. | $105,000 |
| Mar 11, 2022 | Never finaled | 1515 03rd St | Siemens Industry, Inc. | fire only work for the "plentea" remodel on level 1; additions are a monitor module and 3 speaker/strobes. ref pa | $2,450 |
| Jan 19, 2022 | Never finaled | 1515 03rd St | Acco Engineered Systems Inc. Dba Acco En | install new tchw fan coil, pipiing & duct as shown on plans to supplement cooling in storage room. | $165,000 |
| Dec 10, 2021 | Completed | 1515 03rd St | Triad Fire Protection System | g/f: add 3 upright spirnkler sand 8 pendent sprinklers to accommodate new t.i. 202108035618 | $8,931 |
| Sep 13, 2021 | Never finaled | 1515 03rd St | Cosco Fire Protection Inc. | adjust (e) fire sprinklers where door actuators present an obstruction on levels 3,4,5,6. relocate 10 total sprinklers. | $13,000 |
| Aug 16, 2021 | Completed | 1515 03rd St | R L H Fire Protection Inc | 6/f: fire sprinkler permit. relocate 2 sprinklers for new restroom. ref. ti pa 202106011405 | $1,000 |
| Aug 12, 2021 | Completed | 1515 03rd St | Siemens Industry, Inc. | 6th fl l- fire only work to add a smoke detector in the all gender restroom. ref pa 2021-0601-1405 | $635 |
| Aug 5, 2021 | Completed | 1515 03rd St | Truebeck Construction | add ada door operators to 14 atrium doors on levels 3-6 | $14,000 |
| Aug 3, 2021 | Completed | 1515 03rd St | First Restaurant Builders | t.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well. | $165,000 |
| Jun 1, 2021 | Completed | 1515 03rd St | level 6: all gender restroom addition, new plumbing , fixtures , millwork, cabinets, design build mep | $39,000 | |
| Feb 24, 2021 | Never finaled | 1515 03rd St | Truebeck Construction | at district inspector's request, revision #6 to site permit #201508245062 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201910164596 | |
| Feb 18, 2021 | Completed | 1515 03rd St | Siemens Industry, Inc. | as-built permit for the 2-way communication system; 6 call station were added an installed to the original scope of work under permit app # 2015 0824 5062 (addenda 9) | $3,000 |
| Jan 28, 2021 | Never finaled | 1515 03rd St | request correct stamp for occupant [illegible] fire dept only review for assembly permit scope of work added | ||
| Oct 3, 2020 | Completed | 1515 03rd St | Truebeck Construction | installation of accelerograph per ab 58. | |
| Sep 17, 2020 | Completed | 1515 03rd St | Truebeck Construction | revision to pa# 201508245062 s3. to update standpipe locations at occupied roof deck to match site addendum s8 for fire sprinklers. | |
| Sep 16, 2020 | Completed | 1515 03rd St | Truebeck Construction | mb2--fabricate & install evacuation signage for levels 1 to 7 | $10,000 |
| Aug 26, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | 1515 3rd lvel 1 fire alarm. additons are 6 smoke detectors. 9 duct detectors, 13 modules and speaker strobes, ref 201810032102 | $43,600 |
| Aug 26, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | level 6: fire alarm additions are 25 smoke detectors, 12 duct detectors, 2 heat detectors, 26 modules, 1 strobes power supply, 10 speakers, and 61 speaker/ strobes. ref app#201810032104 | $95,800 |
| Aug 22, 2020 | Completed | 1515 03rd St | Truebeck Construction | revision to bpa#201912068963 to provide stainless steel truss details that form the superstructore of the "orbital" structure | |
| Aug 20, 2020 | Expired or cancelled | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this is a 1 face non-illuminated sign "uber" facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street. this is a free standing wayfinding totem facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled | 1515 03rd St | Truebeck Construction | pierpoint ln east and west entrances - master signage plan per g-04. this permit submission includes 2 free-standing exterior wayfinding totem signage on pierpoint lane at east and west entrances at bridgeview way & third street. | $500 |
| Aug 20, 2020 | Expired or cancelled | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this sign is a 1 face non-illuminated "1515 third street" facing west. | $200 |
| Aug 11, 2020 | Completed | 1515 03rd St | Truebeck Construction | revision to app#201508245062 to incorporate revised bridge seismic joint fire protection strategy, including pre-app min, report & 3rd party review. | |
| Jul 17, 2020 | Never finaled | 1515 03rd St | Truebeck Construction | pierpoint lane - revision to pa#201912068963 to provide stub column details. structural only | |
| Jun 29, 2020 | Never finaled | 1515 03rd St | Fuel Oil System | revision to pa# 2018-0410-5954 & 2019-0514-0594. add solenoid valve, bypass ball valve, flow switch, and flow sight to fill pipe at the generator to match the generator permit. | |
| Jun 23, 2020 | Completed | 1515 03rd St | Truebeck Construction | to erect a singled faced, non-electric sign. includes building identification signage at the entry. "uber" **maher n/a** | $5,000 |
| Jun 23, 2020 | Completed | 1515 03rd St | Truebeck Construction | to erect a ground, non-electric sign.free standing exterior wayfinding totem signage at the entry of 1515 rd st**maher n/a** | $500 |
| Jun 23, 2020 | Completed | 1515 03rd St | Truebeck Construction | to erect a ground, non electric sing (south of 1455 03rd st)pierpoint lane.**maher n/a** | $500 |
| Jun 19, 2020 | Completed | 1515 03rd St | Truebeck Construction | to erect a non electric,single faced, door/window sign."1515 third st"**maher n/a** | $200 |
| May 14, 2020 | Never finaled | 1515 03rd St | street space | ||
| May 5, 2020 | Never finaled | 1515 03rd St | Truebeck Construction | revision to 201911268230. smoke control matrix has been revised to clarify actions for atrium skylights as noted in ti permit set | |
| Mar 16, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | 2nd fl - fire alarm work for "uber" redmoel (and mechanical level 7); additions are 14 duct detectors, 33 modules, 1 strobe power supply, 5 speakers, and 41 speaker/strobes. ref pa 2018-0828-8577 | $69,400 |
| Mar 9, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | level 5: fire alarm work due to ti. addition of 2 smoke detectors, 2 duct detectors, 1 module, 2 strobe power supplies, 12 spearks and 64 speaker/strobes. ref t.i. pa201903256122 | $55,100 |
| Mar 6, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | 4th fl - fire alarm work for "uber". additions are 2 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 10 speakers, and 59 speaker/strobes ref pa 2019-0325-6120 | $50,330 |
| Mar 6, 2020 | Completed | 1515 03rd St | Siemens Industry, Inc. | 3rd fl - fire alarm work for the "uber" remodel. additions are 2 smoke detectors, 2 duct detectors, 1 modoule, 2 strobe power supplies, 12 speakers, and 64 speaker/strobes. ref pa 2019-0215-3056 | $56,350 |
| Mar 2, 2020 | Never finaled | 1515 03rd St | street space | ||
| Feb 27, 2020 | Completed | 1515 03rd St | revision to pa# 2015-0824-5062 s16. | $50,000 | |
| Feb 19, 2020 | Completed | 1515 03rd St | Truebeck Construction | revision to 201508245062. to show pierpoint ln retractable bollard wiring diagrham and fire alarm control tie ins | $10,000 |
| Feb 19, 2020 | Completed | 1515 03rd St | Truebeck Construction | rev to pa# 201511183013; pier point ln revision to add fixed & retractable crash rated bullards along 3rdt st & bridgeview way, automatic, retractable bollards are provided where located in the approved fire lane ref f-p-00 for sequence of ops | |
| Jan 29, 2020 | Never finaled | 1515 03rd St | Truebeck Construction | mb2 4-7: revision to pa #2015-0824-5062: mb2 level 1-7 bulletin 18: updated smokre control supplement report for ti areas. show added smoke dampers by the base building. | |
| Jan 24, 2020 | Completed | 1515 03rd St | Truebeck Construction | to obtain final inspection for work approved under pa #201706139225, 201607182149. all work is complete. | |
| Jan 17, 2020 | Completed | 1515 03rd St | Truebeck Construction | renewal of pa# 201704133912 for final inspection. all work is complete. | |
| Jan 17, 2020 | Completed | 1515 03rd St | Truebeck Construction | renewal of pa# 201608306382, 201606079326, 201612225733 for final inspection. all work is complete. | |
| Jan 14, 2020 | Never finaled | 1515 03rd St | Truebeck Construction | administrative permit to memorialize installation requirement per ab005 for framery phone booths as shown in ti permits n/a maher | |
| Dec 18, 2019 | Completed | 1515 03rd St | 1st fl tenant improvement for art installation in lobby//vif card readers in av room and the 'request to leave' feature | $50,000 | |
| Dec 12, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | add 159 ti fire sprinkler heads | $40,000 |
| Dec 6, 2019 | Never finaled | 1515 03rd St | street space | ||
| Dec 6, 2019 | Completed | 1515 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed pierpoint lane. | $30,000 |
| Nov 26, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revision to pa 2019-0830-0342 smoke control matrix has been revised to clarify actions for ti design ahu's, dampers and split smoke zone on level 6 | |
| Oct 23, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revision to approved plumbing permit #201905171025. revised grading and added bollards at pierpoint lane and open space | |
| Oct 16, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revision to issued permit# 2015-0824-5062 addendum# 3 to incorporate changes to various life safety, egress path, door schedule, room layout, and misc drawings.**maher n/a** | |
| Sep 30, 2019 | Completed | 1515 03rd St | mb2-l1 - revision to previously approved pa #201810032102. scope of work includes revisions to architectural walls, ceilings, structure and mep tsav. maher na | ||
| Aug 30, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revisionto approved pa #201901049633. smoke control panel & sequence of operations have been revised to account for t.i. design including smoke zone on level 6 & including t.i. equipment in the smoke control matrix & sequence. refer to g-s-001 for detail narrative of changes. maher na | |
| Aug 19, 2019 | Completed | 1515 03rd St | Truebeck Construction | admin permit to correct app # incorectly recorded on the dwgs and job card/ adden 1 of site permit 201511183013 for pier point lane, aka lot 22 the correct app # for this adden dwgs & job card is 201511183013 | |
| Jul 31, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | structural, mechanical, ele, plumbing engineering and deisign for a complete and operational fuel cell system that will serve future telecommunications and network rooms in building. tlecommunications and network rooms under ti maher not req | $75,000 |
| Jul 23, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | 6/f: added 276 new sprinkler head for l6 t.1. | $40,000 |
| Jul 18, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | added 224 new sprinkler heads for l5 ti | $30,000 |
| Jul 15, 2019 | Never finaled | 1515 03rd St | street space | ||
| Jun 28, 2019 | Completed | 1515 03rd St | Truebeck Construction | revision to approved plumbing permit #2018-1002-2074. inspector in field has requested all pages to be stamped approved. plumbing only. updated utility plans. | |
| Jun 10, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | tenant improvement to be performed to the 4th fl. added 203 sprinkler heads | $25,000 |
| May 17, 2019 | Completed | 1515 03rd St | Truebeck Construction | plumbing review. revision to pa# 2018-1002-2074. installation of man holes & sandtrap for perpoint ln & open space. | |
| May 14, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revision to 201804105954 fire only. relocate remote fill enclosure from the insoide of the wall to the outside of same wall. elec equipment easement for the area in front of n enclosure has been modified to include remote fill | |
| May 8, 2019 | Completed | 1515 03rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | 2nd fl- furnish and install 3 ansul r-102 fire systems in the main kitchen; furnish and install the 2 ansul r-102 fire systems in the pollution control units on the roof. ref pa 2018-0828-8577 | $35,000 |
| May 7, 2019 | Never finaled | 1515 03rd St | street space | ||
| Apr 24, 2019 | Never finaled | 1509 03rd St | change address per owner at pa #201508245061 from 1517, 1521 3rd street to 1509 3rd street. | ||
| Apr 16, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | t.i. to be performed to the 3rd fl. added 210 sprinkler heads n/a maher | $25,000 |
| Apr 16, 2019 | Completed | 1515 03rd St | Truebeck Construction | revision to 201810032104 to include: egress, floor layout, mep & security, tech & audio-visual | |
| Mar 25, 2019 | Completed | 1515 03rd St | Truebeck Construction | 4th flr - revision to 201807245435 - interior walls, floors, finishes & mep maher na | |
| Mar 25, 2019 | Completed | 1515 03rd St | Truebeck Construction | 5th flr - revision to 201807245439 - interior walls, floors, finishes & mep maher na | |
| Mar 5, 2019 | Never finaled | 1517 03rd St | per pa #201508245061, add address to block 8721, lot 029 as; 1517, 1519, 1521 03rd street. | ||
| Feb 15, 2019 | Completed | 1515 03rd St | Truebeck Construction | revision to approved bpa #201807245434 - work to include interior wall & floor improvements. new finsihes, mep, tech, security av. fully sprinklered building. access floor to be under separate deferred submittal. | |
| Jan 30, 2019 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | 2nd flr sprinkler t.i. adding 128 pendant sprinkler heads | $21,000 |
| Jan 4, 2019 | Never finaled | 1515 03rd St | Truebeck Construction | revision to bpa 201508245062 s3 for sequence operations changes | |
| Oct 3, 2018 | Completed | 1515 03rd St | Truebeck Construction | 1st fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, bathrooms | $3,441,000 |
| Oct 3, 2018 | Completed | 1515 03rd St | Truebeck Construction | 6th fl - ti (n) include non-structural partitions, finishes case w/millwork. (n) mep, security, av (n) breakrooms, food prep, bathrooms | $5,439,000 |
| Oct 2, 2018 | Completed | 1515 03rd St | Truebeck Construction | revision to pa#201801128537. water flow information in conjunction with new bldg construction under pa#201508245062 per plumbing inspection results. | |
| Aug 28, 2018 | Completed | 1515 03rd St | Truebeck Construction | 7th fl - (n) casework, millwork, (n) mep, including lighting & plumbing. (n) av, security tech. full sprinklered a3 occupant load is 366 | $50,000 |
| Aug 28, 2018 | Completed | 1515 03rd St | Truebeck Construction | 2nd fl - (n) interior to include: non-structural partitions, finishes, casework, millwork. (n) mep: tech, security, av. (n) cafeteria: kitchen equipment & dishwashing area | $11,880 |
| Jul 24, 2018 | Never finaled | 1515 03rd St | Truebeck Construction | 3rd flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) tech, security and a.v. breakrooms, food prep, bathrooms | $8,190,000 |
| Jul 24, 2018 | Completed | 1515 03rd St | Truebeck Construction | 5th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathrooms | $8,000,000 |
| Jul 24, 2018 | Completed | 1515 03rd St | Truebeck Construction | 4th flr - (n) interior t.i, includeds non-structural paritions finishes, case w/ millwork. (n) mep, tech, security and a.v. breakrooms, food prep, bathrooms | $8,100,000 |
| Apr 12, 2018 | Never finaled | 1515 03rd St | street space permit - renewal of permit #m851027 | ||
| Apr 10, 2018 | Never finaled | 1515 03rd St | Truebeck Construction | deferred fire department air replenishment system associated with site permit #2015-0824-5062. relaces addendum 12 pf site permit. | |
| Apr 10, 2018 | Never finaled | 1515 03rd St | Truebeck Construction | deferred fuel oil permit associated with approved site permit #2015-0824-5062. | |
| Apr 5, 2018 | Completed | 1515 03rd St | Gecms Inc/Mcguire And Hester Joint Ventu | installation of new 8-inch fire service off of 12-inch main on south st. from street curb at sidewalk to 5 feet from building. reference #201508245062. comply w/ maher ord 155-13. | $64,500 |
| Jan 12, 2018 | Never finaled | 1515 03rd St | Truebeck Construction | water flow information in conjunction w/ new bldg construction under pa #2015-0824-5062, per plumbing inspectors request. | |
| Nov 2, 2017 | Never finaled | 1515 03rd St | street space | ||
| Oct 30, 2017 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | revision to app #201704133912. relocate fdc on 3rd st. maher na | $17,000 |
| Jul 18, 2017 | Completed | 1515 03rd St | Truebeck Construction | revision to app#201606039047. scope to revise piles based on field conditions. n/a for maher | |
| Jun 13, 2017 | Expired or cancelled | 1515 03rd St | Truebeck Construction | tower crane foundation & erection for (n) bldg under pa 2015-0824-5062 | $50,000 |
| Apr 13, 2017 | Completed | 1515 03rd St | Cosco Fire Protection Inc. | revision to app#201701257866. add fdc to 3rd street and add back flow preventer. | $17,000 |
| Jan 25, 2017 | Never finaled | 1515 03rd St | Cosco Fire Protection Inc. | 2 8" fire services 5ft out from building maher not req coordinate with the issued site permit | $17,000 |
| Dec 22, 2016 | Completed | 1515 03rd St | Truebeck Construction | construction of shoring wall in association of bld construction at 1455 3rd 106 ft of wall with 29 tiebacks within property and 1 tiebacks encroaching along 3rd street maher na | $50,000 |
| Aug 30, 2016 | Completed | 1515 03rd St | Truebeck Construction | soil improvements test array, in advance of construction. work includes installation of stone columns, per geotechnical engineers recommendations | $10,000 |
| Aug 12, 2016 | Completed | 1515 03rd St | Truebeck Construction | indicator piles associated with/production pile permit 201606039047 maher na | $10,000 |
| Jun 7, 2016 | Completed | 1515 03rd St | Truebeck Construction | demo & excavation in advance of (n) bldg park & public thruway under separate permit #201508245071. work includes site preparation & grading #201511182997 | $40,000 |
| Jun 3, 2016 | Completed | 1515 03rd St | Truebeck Construction | installation of piles in advance of construction of new building under site permit 201508245065: work includes installation of (268) 16/26 tubex piles and (14) existing 14" precast piles. n/a for maher ordinance no. 155-13. | $150,000 |
| Jun 3, 2016 | Completed | 1515 03rd St | Truebeck Construction | soil improvements in advance of construction of new building under site permit 201508245062: work includes installation of stone columns per geotech engineers. n/a for maher ordinance no.155-13. | $100,000 |
| Nov 18, 2015 | Completed | 1515 03rd St | Truebeck Construction | renovation of (e) private lane, adjacent to (n) bldg submitted under appln #201508245062 lot 22: pierpoint lane. scope includes (n) landscaping, benches, & utilities below grade. | $4,000,000 |
| Aug 24, 2015 | Completed | 1515 03rd St | Truebeck Construction | erect 7-story, type 1, no basement, office/retail bldg. | $57,684,393 |