Har Bro Of No. California
- Based in
- Hayward
- On San Francisco permits
- Apr 2000 to Dec 2019
- Last 24 months
- 0 permits filed
263 permits since 2000: 185 completed, 41 never finaled, 37 expired or cancelled.
Of the 41 never-finaled permits, 5 are 5 to 10 years old, 36 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 263.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2019 | Completed final sign-off Dec 2020 | 8 10th St | to comply with nov201906932 item #4: replace/replace drywall 2lf from floor.Details
to comply with nov201906932 item #4: replace/replace drywall 2lf from floor. | $5,000 |
| Nov 27, 2018 | Completed final sign-off Aug 2024 | 3333 Cabrillo St | to comply with nov 201890031. fire damage repair. remove roof framing, wall framing, replace windows & doors. remove & replace all fire damaged interior & exterior finishes-new wood siding.Details
to comply with nov 201890031. fire damage repair. remove roof framing, wall framing, replace windows & doors. remove & replace all fire damaged interior & exterior finishes-new wood siding. | $110,000 |
| Sep 20, 2018 | Completed final sign-off Feb 2019 | 2595 Washington St | rev to pa#201807174704: replace 20 windows east facade of building with aluminum-clad wood windows, visible to street. no other work under this permit.Details
rev to pa#201807174704: replace 20 windows east facade of building with aluminum-clad wood windows, visible to street. no other work under this permit. | $25,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 2595 Washington St | replace 77 windows on exterior elevation with marvin ultimate aluminum-clad.Details
replace 77 windows on exterior elevation with marvin ultimate aluminum-clad. | $200,000 |
| Jul 5, 2018 | Completed final sign-off Jul 2019 | 2292 Fulton St | rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d.Details
rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d. | $85,000 |
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 1360 Jones St | restoration and specialized cleaning of water mold/fungi damanged construction matrials and contents from within the interior of garage.Details
restoration and specialized cleaning of water mold/fungi damanged construction matrials and contents from within the interior of garage. | $10,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 32 West Portal Av | strip interior framing to studs, nonstructural demo-exploratoryDetails
strip interior framing to studs, nonstructural demo-exploratory | $30,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2019 | 2595 Washington St | fire damage: #4:strip to studs,ice blast chard joist sister b joist.#4-5-6-8-9 replace front doors for.#8 replace drwall in bdrm walls & ceiling.#7 replace drywall in common wall in bdrm & lid, #5 front bedrm dryall common wall,hallway ceiling, front rooom ceiling & closet,Details
fire damage: #4:strip to studs,ice blast chard joist sister b joist.#4-5-6-8-9 replace front doors for.#8 replace drwall in bdrm walls & ceiling.#7 replace drywall in common wall in bdrm & lid, #5 front bedrm dryall common wall,hallway ceiling, front rooom ceiling & closet, | $200,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 835 Pine St | unit #8: install dry wall and insulation at bay window facing rear of buildingDetails
unit #8: install dry wall and insulation at bay window facing rear of building | $6,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 835 Pine St | remove/replace aging siding to match (e), not visible from street at rear.Details
remove/replace aging siding to match (e), not visible from street at rear. | $25,000 |
| Jan 6, 2017 | Completed final sign-off Jan 2017 | 3076 26th St | temp patch hole in roof, no other workDetails
temp patch hole in roof, no other work | $3,500 |
| Aug 1, 2016 | Never finaled issued Oct 2016, no final | 160 Saint Elmo Wy | repair damaged deck to sinking concrete piers due to soil errosion.Details
repair damaged deck to sinking concrete piers due to soil errosion. | $2,500 |
| May 13, 2016 | Completed final sign-off Apr 2019 | 251 Lincoln Wy | fire damage repair, remove & replace damaged roof framing, damaged studs and damged interior finish, minor remodeling of bath and closets.Details
fire damage repair, remove & replace damaged roof framing, damaged studs and damged interior finish, minor remodeling of bath and closets. | $500,000 |
| Apr 28, 2016 | Completed final sign-off May 2016 | 830 Hyde St | to obtain a final inspection for work already approved under pa# 201411242368, 201203297111, & 201205231104, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201411242368, 201203297111, & 201205231104, all work is complete | |
| Apr 28, 2016 | Completed final sign-off May 2016 | 830 Hyde St | to obtain a final inspection for work already approved under pa# 201309197277 201404233975, 201412022808, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201309197277 201404233975, 201412022808, all work is complete | |
| Apr 21, 2016 | Completed final sign-off Jun 2017 | 2418 Fulton St | correction notice dated 03/31/16 per inspector quinlan - plans not required, restore to pre-fire condition. separate elect, plumbing & mech permit.Details
correction notice dated 03/31/16 per inspector quinlan - plans not required, restore to pre-fire condition. separate elect, plumbing & mech permit. | $200,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 830 Hyde St | revision to appl #201208278280 - 1st floor plan showing existing gate & fdc encroachment on the sidewalk. n/a maher ordinanceDetails
revision to appl #201208278280 - 1st floor plan showing existing gate & fdc encroachment on the sidewalk. n/a maher ordinance | |
| Feb 3, 2016 | Completed final sign-off Sep 2017 | 425 02nd Av | fire damage repair of existing 4 unit apartment - repair/replace (e) walls, (n) patio decks & stairs. (n) shearwalls, new finishesDetails
fire damage repair of existing 4 unit apartment - repair/replace (e) walls, (n) patio decks & stairs. (n) shearwalls, new finishes | $97,000 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 3835 19th St | water damage repairs at unit 202. no walls to be moved, no structural, (e) to be maintained.Details
water damage repairs at unit 202. no walls to be moved, no structural, (e) to be maintained. | $15,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 425 02nd Av | remove rear deck 1/4 of third floor rear strip interior finishes. demo only. halls kitchens bathrooms 3rd floor and 2nd floor to garage. to comply with violation ces #201574912Details
remove rear deck 1/4 of third floor rear strip interior finishes. demo only. halls kitchens bathrooms 3rd floor and 2nd floor to garage. to comply with violation ces #201574912 | $15,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2016 | 2221 Pacific Av | water damage repairs @ ceiling and walls throughout entire unit with the exception of kitchen. 5/8" type x drywall to be replaced in kind and insulating walls and ceiling @ unit 3. approx 3,000 sq. ft. of wall finish repair. no structural work. no change to walls, doors or windows.Details
water damage repairs @ ceiling and walls throughout entire unit with the exception of kitchen. 5/8" type x drywall to be replaced in kind and insulating walls and ceiling @ unit 3. approx 3,000 sq. ft. of wall finish repair. no structural work. no change to walls, doors or windows. | $15,100 |
| Oct 22, 2015 | Completed final sign-off Aug 2016 | 204 Dore St | to comply with nov# 201571471. fire damaged exterior side wall in kind, remove & replace damaged interior door. n/a ordinance #155-13.Details
to comply with nov# 201571471. fire damaged exterior side wall in kind, remove & replace damaged interior door. n/a ordinance #155-13. | $150,000 |
| Oct 7, 2015 | Completed final sign-off Feb 2016 | 2023 Folsom St | unit 1 & 4 - drywall water damage repairs around tub to comply with nov 201559381Details
unit 1 & 4 - drywall water damage repairs around tub to comply with nov 201559381 | $3,000 |
| Sep 23, 2015 | Completed final sign-off Feb 2017 | 925 Pierce St | unit 7 - water damage repairs to plaster at living room, kitchen, bedroom & bathroom which includes remodelling. all new lights shall be led/flourescent. all 3 rooms to be repaired in kind/no windows or doors.Details
unit 7 - water damage repairs to plaster at living room, kitchen, bedroom & bathroom which includes remodelling. all new lights shall be led/flourescent. all 3 rooms to be repaired in kind/no windows or doors. | $9,000 |
| Aug 10, 2015 | Completed final sign-off Feb 2016 | 3835 19th St | to comply with nov 201523061 - water damage repairs at 1st floor and lobby at units 100 & 102 - no walls to be moved/no structural. exiting to be maintainedDetails
to comply with nov 201523061 - water damage repairs at 1st floor and lobby at units 100 & 102 - no walls to be moved/no structural. exiting to be maintained | $30,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2015 | 155 Haight St | water damage repair. drywalls, insulation, cabinets and paint. replace like to like at units #108, #208 and #308. approx. 1000 sq ft of surface area. all work in kind.Details
water damage repair. drywalls, insulation, cabinets and paint. replace like to like at units #108, #208 and #308. approx. 1000 sq ft of surface area. all work in kind. | $35,000 |
| Jun 11, 2015 | Completed final sign-off Feb 2016 | 3835 19th St | to comply w/nov #201523061 for item #3 - 3rd floor fire damaged repair (item #3) in unit # 302 and #303 per plan.Details
to comply w/nov #201523061 for item #3 - 3rd floor fire damaged repair (item #3) in unit # 302 and #303 per plan. | $80,000 |
| Apr 21, 2015 | Completed final sign-off Sep 2015 | 117 04th Av | unit 117: fire damage repair. non structural repairs. comply with bid nov #201529461. replace fire damaged kitchen, roofing, plaster, flooring, windows, etc., & 1 bathroom.Details
unit 117: fire damage repair. non structural repairs. comply with bid nov #201529461. replace fire damaged kitchen, roofing, plaster, flooring, windows, etc., & 1 bathroom. | $100,000 |
| Mar 12, 2015 | Completed final sign-off Apr 2015 | 3835 19th St | drywalling the inside of an elevator shaft only.Details
drywalling the inside of an elevator shaft only. | $6,500 |
| Feb 24, 2015 | Never finaled issued May 2015, no final | 2630 Mission St | close off door openings to adjacent building with cmu. building to remain vacant until compliance with accessibility per ab017.Details
close off door openings to adjacent building with cmu. building to remain vacant until compliance with accessibility per ab017. | $12,000 |
| Dec 2, 2014 | Expired or cancelled expired May 2016 | 830 Hyde St | installation of elevator guide rail supports and hoist beam. revision to pa#201208278280. n/a ordinance #155-13Details
installation of elevator guide rail supports and hoist beam. revision to pa#201208278280. n/a ordinance #155-13 | $1,500 |
| Nov 24, 2014 | Expired or cancelled expired May 2016 | 830 Hyde St | addition of 2-hr.rated elevator machine room on 1st floor. revision to app#201208278280. n/a for the maher ordinance.Details
addition of 2-hr.rated elevator machine room on 1st floor. revision to app#201208278280. n/a for the maher ordinance. | $2,500 |
| Nov 19, 2014 | Never finaled issued Nov 2014, no final | 2632 Mission St | demolish 2-story, type 3, merchantile building. emergency order #106861e, dated 9/8/2014.Details
demolish 2-story, type 3, merchantile building. emergency order #106861e, dated 9/8/2014. | $125,000 |
| Aug 28, 2014 | Completed final sign-off Jul 2015 | 23 Castillo St | roof repair sheathing framing/cieling joist/installation/dry wall electrical/window/doors cabinet and fixturesDetails
roof repair sheathing framing/cieling joist/installation/dry wall electrical/window/doors cabinet and fixtures | $40,000 |
| Jul 7, 2014 | Completed final sign-off Aug 2014 | 1050 North Point St | water damage repair to master bedroom, shower stall area, remove & replace ceramic tile, shower pan, shower faucet as in kind. with quatz panel.Details
water damage repair to master bedroom, shower stall area, remove & replace ceramic tile, shower pan, shower faucet as in kind. with quatz panel. | $4,000 |
| Apr 23, 2014 | Expired or cancelled expired May 2016 | 830 Hyde St | mechanical, electrical, and plumbing drawing for previously approved app 201403271840. new wiring, heating and fan units. new bathroom and kitchen fixtures and associated plumbing. n/a ordinance #155-13.Details
mechanical, electrical, and plumbing drawing for previously approved app 201403271840. new wiring, heating and fan units. new bathroom and kitchen fixtures and associated plumbing. n/a ordinance #155-13. | $33,000 |
| Apr 3, 2014 | Completed final sign-off May 2014 | 300 Berry St | water damage in common hallways affecting units # 301, 401, 501, 701, 901, 1001, 411, 511, 611, 811, 413, 513, 713, 813, 913 & 1012. install insulation and draywall 2 ft high x approx 2,000 lft at the above units - water damaged repair - 5/8" type x g.b. n/a compliance with maher ordinance#155-13Details
water damage in common hallways affecting units # 301, 401, 501, 701, 901, 1001, 411, 511, 611, 811, 413, 513, 713, 813, 913 & 1012. install insulation and draywall 2 ft high x approx 2,000 lft at the above units - water damaged repair - 5/8" type x g.b. n/a compliance with maher ordinance#155-13 | $30,000 |
| Mar 31, 2014 | Completed final sign-off Mar 2015 | 1408 46th Av | to comply with nov# 201447351 dated 1/14/2014, bomb explosion, remove & replace damaged walls and roof rafter, add 2 new post & foundation.Details
to comply with nov# 201447351 dated 1/14/2014, bomb explosion, remove & replace damaged walls and roof rafter, add 2 new post & foundation. | $35,000 |
| Mar 27, 2014 | Completed final sign-off May 2016 | 830 Hyde St | revision to pa#201208278280/r-2. revised layouts to restore existing fire damaged 5 story apt. build with upgrades as mandated by city of san francisco dept. of building and safety, add new plumbing shaft, no new bedrooms. n/a ordinance #155-13.Details
revision to pa#201208278280/r-2. revised layouts to restore existing fire damaged 5 story apt. build with upgrades as mandated by city of san francisco dept. of building and safety, add new plumbing shaft, no new bedrooms. n/a ordinance #155-13. | $180,000 |
| Feb 27, 2014 | Completed final sign-off Jul 2014 | 1369 Shafter Av | fire damage repair in bedroom only, remove & replace approx. 40 sq.ft. of exterior siding, patch roof, install insulation drywall and paint bedrooms. exterior rear siding. electrical permit will by pull by electrician. no plans required per nov.Details
fire damage repair in bedroom only, remove & replace approx. 40 sq.ft. of exterior siding, patch roof, install insulation drywall and paint bedrooms. exterior rear siding. electrical permit will by pull by electrician. no plans required per nov. | $25,000 |
| Feb 26, 2014 | Expired or cancelled withdrawn Mar 2014 | 830 Hyde St | revision to app# 201208278280/r-2. floor plan changes to all dwelling units (9). 4 units with additional full bath(units 301,501,701,901). 4 units with additional tub(units 201,401,601,801). n/a for the maher ordinance #155-13Details
revision to app# 201208278280/r-2. floor plan changes to all dwelling units (9). 4 units with additional full bath(units 301,501,701,901). 4 units with additional tub(units 201,401,601,801). n/a for the maher ordinance #155-13 | $70,000 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 4099 Judah St | temporary shoring for removal of lath and plaster in unit 1408 and garage ceiling. walls and ceilings affected by explosion. exploratory demo only as required by city inspector.Details
temporary shoring for removal of lath and plaster in unit 1408 and garage ceiling. walls and ceilings affected by explosion. exploratory demo only as required by city inspector. | $8,000 |
| Dec 27, 2013 | Completed final sign-off May 2014 | 759 Capp St | 17 windows ro be replaced with one at front. replace in kind.Details
17 windows ro be replaced with one at front. replace in kind. | $9,000 |
| Nov 19, 2013 | Never finaled issued Nov 2013, no final | 540 Valencia St | fire damage repair on exterior, siding drywall patch & paint dining room, paint exterior.Details
fire damage repair on exterior, siding drywall patch & paint dining room, paint exterior. | $40,000 |
| Nov 19, 2013 | Never finaled issued Nov 2013, no final | 1253 Exposition Dr | fire damage repair 2 bedrooms insulation & drywall paint interior complete & flooring change in unit cDetails
fire damage repair 2 bedrooms insulation & drywall paint interior complete & flooring change in unit c | $49,000 |
| Sep 26, 2013 | Never finaled issued Oct 2013, no final | 1402 Sturgeon St | fire damage repair like for like with truss calculations and simple drawings.Details
fire damage repair like for like with truss calculations and simple drawings. | $105,000 |
| Sep 19, 2013 | Expired or cancelled expired May 2016 | 830 Hyde St | revision 201208278280. install diaphragm at ceiling. new detail 18/s.4 mod detail 11 s.4 update plans (s-2.6)Details
revision 201208278280. install diaphragm at ceiling. new detail 18/s.4 mod detail 11 s.4 update plans (s-2.6) | |
| Aug 7, 2013 | Completed final sign-off Aug 2013 | 527 Central Av | replace of retrofit windows in the rear. three (3) windows. all windows double pane. comply with rescue/egress req'sDetails
replace of retrofit windows in the rear. three (3) windows. all windows double pane. comply with rescue/egress req's | $2,438 |
| Apr 1, 2013 | Never finaled issued Apr 2013, no final | 759 Capp St | reroofingDetails
reroofing | $5,000 |
| Mar 19, 2013 | Completed final sign-off May 2014 | 759 Capp St | fire damage repair at the 2nd, 3rd, and roof level. nov 201383103-cesDetails
fire damage repair at the 2nd, 3rd, and roof level. nov 201383103-ces | $500,000 |
| Mar 13, 2013 | Completed final sign-off Sep 2013 | 759 Capp St | remove wet & fire damage acm materials from back 1/2 of garage units 2,4,5,6,7 demo only. permit to follow for construction. to comply with ces nov 201383103, no structural work at this time.Details
remove wet & fire damage acm materials from back 1/2 of garage units 2,4,5,6,7 demo only. permit to follow for construction. to comply with ces nov 201383103, no structural work at this time. | $45,000 |
| Feb 7, 2013 | Completed final sign-off Mar 2013 | 138 Clinton Pk | to comply with nov # 201384721 , items # 1,2,3 & 4Details
to comply with nov # 201384721 , items # 1,2,3 & 4 | $3,500 |
| Dec 21, 2012 | Expired or cancelled cancelled Jan 2026 | 2857 Mission St | fire repair minor framing, roofing, electrical & plumbing. gas test plaster repairDetails
fire repair minor framing, roofing, electrical & plumbing. gas test plaster repair | $15,000 |
| Nov 28, 2012 | Completed final sign-off Dec 2012 | 200 Brannan St | replace minimum drywall& insulation at unit 141,142,241,242,338,339. all drywall repair is in bathrooms of aforementioned 6 units (drywall patching). replace in kind.Details
replace minimum drywall& insulation at unit 141,142,241,242,338,339. all drywall repair is in bathrooms of aforementioned 6 units (drywall patching). replace in kind. | $12,000 |
| Nov 6, 2012 | Never finaled issued Dec 2012, no final | 1552 Ocean Av | ab-004. priority processing by mayor's office. to erect 1 story retail & restaurant commercial building.Details
ab-004. priority processing by mayor's office. to erect 1 story retail & restaurant commercial building. | $400,000 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 90 Parker Av | repair only, car drove thru window. replace window, repair framing, repair stucco.Details
repair only, car drove thru window. replace window, repair framing, repair stucco. | $12,000 |
| Aug 27, 2012 | Completed final sign-off May 2016 | 830 Hyde St | to comply with nov# 201074289 bid. restore (e) fire damaged 5 story, 9 units apartment building to original pre-fire condition with upgrades as mandated by the department of building inspection.Details
to comply with nov# 201074289 bid. restore (e) fire damaged 5 story, 9 units apartment building to original pre-fire condition with upgrades as mandated by the department of building inspection. | $600,000 |
| Aug 16, 2012 | Completed final sign-off Dec 2012 | 1552 Ocean Av | demolish 1 story, type 5, coffee shop.Details
demolish 1 story, type 5, coffee shop. | $80,000 |
| Aug 10, 2012 | Expired or cancelled revoked Aug 2012 | 1552 Ocean Av | to comply with eo # 104568e. removed fire damged sheet rock. finishes and burned framing including partial roof structure. barricade and secure building - non structural.Details
to comply with eo # 104568e. removed fire damged sheet rock. finishes and burned framing including partial roof structure. barricade and secure building - non structural. | $45,000 |
| Jul 3, 2012 | Completed final sign-off Aug 2012 | 1044 Florida St | revision to application #201108021495. revision to permit to include new bathroom or kitchenDetails
revision to application #201108021495. revision to permit to include new bathroom or kitchen | |
| Mar 29, 2012 | Expired or cancelled expired May 2016 | 830 Hyde St | repair fire damaged stair well, elevator shaft & light well at roof only. this permit is for partial fire damage repair. a separate permit will be obtained for the remainder of the fire damage. all work in kind.Details
repair fire damaged stair well, elevator shaft & light well at roof only. this permit is for partial fire damage repair. a separate permit will be obtained for the remainder of the fire damage. all work in kind. | $10,000 |
| Mar 27, 2012 | Completed final sign-off Jul 2012 | 1388 California St | fire repair - replace minor framing, some electrical, pluming, drywall & siding on east elevation / less than 200 sq ft, 5 rooms and small section of bar affected.Details
fire repair - replace minor framing, some electrical, pluming, drywall & siding on east elevation / less than 200 sq ft, 5 rooms and small section of bar affected. | $40,000 |
| Mar 6, 2012 | Completed final sign-off Aug 2013 | 510 Capp St | fire repair to rear of house, partial roof framing, water damage to balance, new elec, new plumbing, repair rear exit stairs & landings.Details
fire repair to rear of house, partial roof framing, water damage to balance, new elec, new plumbing, repair rear exit stairs & landings. | $160,000 |
| Jan 17, 2012 | Never finaled issued Jan 2012, no final | 307 03rd Av | to comply nov#20117741 & 201170673 remove all finishes from #3,4,5 main stair well. #2 fire place wall, #5 source of fire the rest is wet, 2 comml spaces ceiling & back wall are wet need to be demo out. additional permit w/plans shall be submitted for review prior to final inspection of this permit.Details
to comply nov#20117741 & 201170673 remove all finishes from #3,4,5 main stair well. #2 fire place wall, #5 source of fire the rest is wet, 2 comml spaces ceiling & back wall are wet need to be demo out. additional permit w/plans shall be submitted for review prior to final inspection of this permit. | $10,000 |
| Dec 5, 2011 | Never finaled issued Dec 2011, no final | 510 Capp St | fire demolition only - to aid in cover up to mitigate further damage. only fire damaged debris to be removed. plans for re-construction to follow under separate permit - rear 20' of top floor only to be removed.Details
fire demolition only - to aid in cover up to mitigate further damage. only fire damaged debris to be removed. plans for re-construction to follow under separate permit - rear 20' of top floor only to be removed. | $15,000 |
| Oct 19, 2011 | Completed final sign-off May 2012 | 3463 20th St | comply with nov 201133541, fire repair minimal damage to roof, replace partial siding down on south elevation, replace ceiling plaster throughout, partial wall plaster (smoke and water damage) new kitchen. lighting per cec 150 (k)8, bath lighting per cec 150 (k) 10Details
comply with nov 201133541, fire repair minimal damage to roof, replace partial siding down on south elevation, replace ceiling plaster throughout, partial wall plaster (smoke and water damage) new kitchen. lighting per cec 150 (k)8, bath lighting per cec 150 (k) 10 | $85,000 |
| Oct 14, 2011 | Never finaled issued Oct 2011, no final | 4049 24th St | repair fire damage per plan; comply with notice of violation #201157588. fire @ top unit, water damage on all other floors including commercial space.Details
repair fire damage per plan; comply with notice of violation #201157588. fire @ top unit, water damage on all other floors including commercial space. | $160,000 |
| Sep 30, 2011 | Expired or cancelled expired Mar 2016 | 4049 24th St | fire damage, need to demo to allow further observation by engineer and to mitigate further damage to building. soft dmo, non structrual only. demo permit only for fire damaged area. fire damaged repair under seperate permit. to comply w/nov 201157588 dated 9/11/11.Details
fire damage, need to demo to allow further observation by engineer and to mitigate further damage to building. soft dmo, non structrual only. demo permit only for fire damaged area. fire damaged repair under seperate permit. to comply w/nov 201157588 dated 9/11/11. | $20,000 |
| Sep 13, 2011 | Completed final sign-off Feb 2012 | 790 Brannan St | structural revision to bpa# 201106017182 per plan.Details
structural revision to bpa# 201106017182 per plan. | $45,000 |
| Aug 2, 2011 | Completed final sign-off Aug 2012 | 1044 Florida St | repair fire damaged roof, replace fire damaged window & siding. electrical, plumbing, hvac at rear of buildingDetails
repair fire damaged roof, replace fire damaged window & siding. electrical, plumbing, hvac at rear of building | $120,000 |
| Jun 1, 2011 | Completed final sign-off Mar 2012 | 790 Brannan St | basement & 1st floor (tenant #1) to comply w/nov 201114561 fire damage repair: remodel front entrance, replace bathroom fixtures, install remote door opener, replace gypsum board walls & ceilings, repair rear deck & stair less than 20% in-kind, repair electrical under separate permit.Details
basement & 1st floor (tenant #1) to comply w/nov 201114561 fire damage repair: remodel front entrance, replace bathroom fixtures, install remote door opener, replace gypsum board walls & ceilings, repair rear deck & stair less than 20% in-kind, repair electrical under separate permit. | $250,000 |
| Jun 1, 2011 | Completed final sign-off Mar 2012 | 790 Brannan St | 2nd floor (tenant #2) to comply w/nov #2011147561 fire damage repair: remove unpermitted 2nd floor rear deck & deck roof. remodel bathroom, replace gypsum board walls & ceilings, repair electrical system under separate permit.Details
2nd floor (tenant #2) to comply w/nov #2011147561 fire damage repair: remove unpermitted 2nd floor rear deck & deck roof. remodel bathroom, replace gypsum board walls & ceilings, repair electrical system under separate permit. | $135,000 |
| May 26, 2011 | Completed final sign-off Mar 2012 | 409 Panorama Dr | fire repair return to like kind and quality new elec, new plumbing, new hvac, drywall and insulation throughout, seismic work. some framing on 1st flDetails
fire repair return to like kind and quality new elec, new plumbing, new hvac, drywall and insulation throughout, seismic work. some framing on 1st fl | $140,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 2045 Cabrillo St | water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations.Details
water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations. | $32,000 |
| Feb 16, 2011 | Expired or cancelled cancelled Nov 2022 | 66 Rondel Pl | fire repair as per plans & to comply with correction notice of violation# 201063342. removal of existing dwelling unit in basement.Details
fire repair as per plans & to comply with correction notice of violation# 201063342. removal of existing dwelling unit in basement. | $120,000 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 1790 Jackson St | repair water damage in-kind to bathroom of units #201,301,401,501 & 601. repair water damage in-kind to kitchen of units #202,302,402 & 502. all drywall shall be 5/8" type x gyp.bd. plus insulation at walls seperating between units and public area, new cabinets and new fixtures, no wall relocation.Details
repair water damage in-kind to bathroom of units #201,301,401,501 & 601. repair water damage in-kind to kitchen of units #202,302,402 & 502. all drywall shall be 5/8" type x gyp.bd. plus insulation at walls seperating between units and public area, new cabinets and new fixtures, no wall relocation. | $60,000 |
| Feb 3, 2011 | Completed final sign-off Jan 2012 | 1100 Fell St | obtain final inspection to work approved under pa# 2008-0129-3473. all work completeDetails
obtain final inspection to work approved under pa# 2008-0129-3473. all work complete | |
| Jan 31, 2011 | Completed final sign-off Mar 2011 | 419 Mangels Av | repair fire damage, no plans required as per correction notice dated 1/21/11 -patch roof, install 2 new windows, no diaminion change 8'x5', insulate, drywall, paint front elevation & bedroom lay flooring, reinstall doors & trim. patch roof sheating with 3/4" ply app 4'x4' damage from fire dept.Details
repair fire damage, no plans required as per correction notice dated 1/21/11 -patch roof, install 2 new windows, no diaminion change 8'x5', insulate, drywall, paint front elevation & bedroom lay flooring, reinstall doors & trim. patch roof sheating with 3/4" ply app 4'x4' damage from fire dept. | $5,000 |
| Jan 13, 2011 | Completed final sign-off Jan 2011 | 388 05th St | to obtain final inspection for work approved under pa 200702154222; all work is completeDetails
to obtain final inspection for work approved under pa 200702154222; all work is complete | |
| Jan 13, 2011 | Completed final sign-off Jan 2011 | 388 05th St | to obtain final inspection for work approved under pa 200711137927; all work is completeDetails
to obtain final inspection for work approved under pa 200711137927; all work is complete | |
| Nov 29, 2010 | Never finaled issued Nov 2010, no final | 830 Hyde St | #7 & #9- demo units on walls & ceilings due to water lose damage only on lath & plaster or drywall. repair lath & plaster on walls & ceilings. no structural work.Details
#7 & #9- demo units on walls & ceilings due to water lose damage only on lath & plaster or drywall. repair lath & plaster on walls & ceilings. no structural work. | $10,000 |
| Nov 1, 2010 | Completed final sign-off Feb 2011 | 160 Saint Elmo Wy | to obtain final inspection app#200902202468 all work is completeDetails
to obtain final inspection app#200902202468 all work is complete | |
| Sep 13, 2010 | Completed final sign-off Aug 2015 | 66 Rondel Pl | fire damaged- remove debris and unsafe portion of construction to allow admittance of engineer. future repair permit to follow.Details
fire damaged- remove debris and unsafe portion of construction to allow admittance of engineer. future repair permit to follow. | $15,000 |
| Aug 26, 2010 | Completed final sign-off Oct 2010 | 146 Ramsell St | obtain final inspection for work approved under pa# 2007-0710-9385. all work is completeDetails
obtain final inspection for work approved under pa# 2007-0710-9385. all work is complete | |
| Jul 13, 2010 | Completed final sign-off Sep 2010 | 1111 Pine St | to obtain final inspection for work approved under appl#200806174644, all work is complete.Details
to obtain final inspection for work approved under appl#200806174644, all work is complete. | |
| Jul 7, 2010 | Completed final sign-off Dec 2010 | 485 Dewey Bl | repair water damage in bath, remove & replace drywall, insulation, tub, sink & flooring, paint.Details
repair water damage in bath, remove & replace drywall, insulation, tub, sink & flooring, paint. | $12,677 |
| Jun 16, 2010 | Completed final sign-off Oct 2010 | 535 Ashbury St | install insulation, drywalls, cabinets, flooring in unit # 1 & 3. only in the kitchens.Details
install insulation, drywalls, cabinets, flooring in unit # 1 & 3. only in the kitchens. | $17,000 |
| Jun 9, 2010 | Completed final sign-off May 2011 | 705 Banks St | fire repair/ remove and replace drywall, minor framing repair, new elec, plumbing repair, new hvac, new kitchen . new garage door, remove walls in garage and convert back to parking space.Details
fire repair/ remove and replace drywall, minor framing repair, new elec, plumbing repair, new hvac, new kitchen . new garage door, remove walls in garage and convert back to parking space. | $80,000 |
| May 18, 2010 | Completed final sign-off Aug 2010 | 501 Waller St | remove water damaged plaster with type x 5/8 dry wall, taped, painted, units # 503 & 505Details
remove water damaged plaster with type x 5/8 dry wall, taped, painted, units # 503 & 505 | $15,000 |
| Mar 5, 2010 | Completed final sign-off Aug 2010 | 295 Bay St | approx. 2300 sq ft of drywall to be replaced on office dividing pony walls. water damage as a result of sprinklers going off.Details
approx. 2300 sq ft of drywall to be replaced on office dividing pony walls. water damage as a result of sprinklers going off. | $15,000 |
| Feb 16, 2010 | Completed final sign-off Oct 2010 | 146 Ramsell St | repair rear stair and landing less than 50%. ref# 2007.08.10.9385.Details
repair rear stair and landing less than 50%. ref# 2007.08.10.9385. | $2,000 |
| Feb 12, 2010 | Completed final sign-off Nov 2010 | 268 Frederick St | repair fire damage, repair of existing fire damage membrane. scope of work does not include seismic upgrade of existing bldg. voluntary strengthening of framing is done by adding plywood at perimeter walls, moment frame & pad footing @ ground floor.Details
repair fire damage, repair of existing fire damage membrane. scope of work does not include seismic upgrade of existing bldg. voluntary strengthening of framing is done by adding plywood at perimeter walls, moment frame & pad footing @ ground floor. | $200,000 |
| Feb 9, 2010 | Completed final sign-off Apr 2010 | 217 Divisadero St | remove & replace (e) drywall ceiling with new non-sound conductive ceiling in unit #217Details
remove & replace (e) drywall ceiling with new non-sound conductive ceiling in unit #217 | $35,000 |
| Feb 8, 2010 | Completed final sign-off Jun 2010 | 1 Daniel Burnham Ct | unit#202: kitchen remodel including drywall repairs due to water damage.Details
unit#202: kitchen remodel including drywall repairs due to water damage. | $33,753 |
| Feb 1, 2010 | Completed final sign-off Jul 2010 | 605 Peralta Av | unit 605 & 609 - fire repair, no structural, smoke & water damage, drywall repalcement, new ktichen - like in kind & quality.Details
unit 605 & 609 - fire repair, no structural, smoke & water damage, drywall repalcement, new ktichen - like in kind & quality. | $30,000 |
| Jan 29, 2010 | Completed final sign-off Jan 2012 | 1100 Fell St | to complete work and obtain final inspection for work approved under app #200801293473Details
to complete work and obtain final inspection for work approved under app #200801293473 | $30,000 |
| Dec 24, 2009 | Completed final sign-off Aug 2010 | 611 02nd Av | fire repair, replace cable end siding & trim, minimal interior plaster repair, no structural work.Details
fire repair, replace cable end siding & trim, minimal interior plaster repair, no structural work. | $45,000 |
| Oct 1, 2009 | Completed final sign-off Nov 2010 | 268 Frederick St | fire related plaster removal only to expose damage and allow visual inspection. engineered plans to follow for exploratory reasons only. building is vacant.Details
fire related plaster removal only to expose damage and allow visual inspection. engineered plans to follow for exploratory reasons only. building is vacant. | $30,000 |
| Sep 25, 2009 | Completed final sign-off May 2011 | 1106 Fell St | to complete work and obtain final inspectio for work approved under 200809182010.Details
to complete work and obtain final inspectio for work approved under 200809182010. | $9,000 |
| Sep 15, 2009 | Completed final sign-off Mar 2010 | 1111 Pine St | remove and replace extg rear wall siding and scofolding. not visible on front streetDetails
remove and replace extg rear wall siding and scofolding. not visible on front street | $35,000 |