Block 1170, lot 035
330 Stanyan St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 3
- Units
- 12
- Rooms
- 13 bathrooms
- Building
- 13,162 sq ft
- Lot
- 6,581 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 330 Stanyan St | B-Side Inc. | (rear of building) replace entire wall of siding. install waterproofing. install new siding- in kind.Details
(rear of building) replace entire wall of siding. install waterproofing. install new siding- in kind. | $5,000 |
| Mar 25, 2021 | Completed final sign-off Sep 2022 | 330 Stanyan St | Axel8 Construction, B-Side Inc. | unit 330: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install washer & dryer.Details
unit 330: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install washer & dryer. | $45,000 |
| Dec 2, 2020 | Never finaled filed Dec 2020, never issued | 2288 Fulton St | addition of two (2) accessory dwelling units (adu), to an existing six (6) unit building for a total of eight (8) units per ordinance 162-16. the proposed adus are located at the basement level within the existing building envelope.Details
addition of two (2) accessory dwelling units (adu), to an existing six (6) unit building for a total of eight (8) units per ordinance 162-16. the proposed adus are located at the basement level within the existing building envelope. | $120,000 | |
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 2292 Fulton St | street spaceDetails
street space | ||
| Nov 5, 2018 | Never finaled issued Nov 2018, no final | 2292 Fulton St | street spaceDetails
street space | ||
| Jul 5, 2018 | Completed final sign-off Jul 2019 | 2292 Fulton St | Har Bro Of No. California | rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d.Details
rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d. | $85,000 |
| Jul 5, 2018 | Completed final sign-off Jul 2019 | 2290 Fulton St | Axel8 Construction | 2nd floor: convert (e) kitchen & bedroom into living room. relocate kitchen. rehabilie (e) bathroom. install bathroom meet sffc 1103.7.61Details
2nd floor: convert (e) kitchen & bedroom into living room. relocate kitchen. rehabilie (e) bathroom. install bathroom meet sffc 1103.7.61 | $40,000 |
| Sep 12, 2017 | Expired or cancelled cancelled Jan 2026 | 322 Stanyan St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinance | $45,000 | |
| Sep 12, 2017 | Completed final sign-off Nov 2019 | 2288 Fulton St | Sandbank Construction, Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinance | $40,000 |
| Aug 30, 2017 | Completed final sign-off Apr 2018 | 328 Stanyan St | Kong's Plumbing & Construction Co. | unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher naDetails
unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher na | $46,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 322 Stanyan St | Markoff Structural Pest Control | markoff termite report #16758, item #2Details
markoff termite report #16758, item #2 | $21,000 |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 322 Stanyan St | Kong's Plumbing & Construction Co. | unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 332 Stanyan St | Kong's Plumbing & Construction Co. | unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 2288 Fulton St | J P F Construction | remodel 1 bathroom & 1 kitchen,. electrical upgrade, painting, non-structural work.Details
remodel 1 bathroom & 1 kitchen,. electrical upgrade, painting, non-structural work. | $45,000 |
| Sep 19, 2014 | Completed final sign-off Oct 2014 | 2296 Fulton St | Lovett & Lovett Roofing Co Inc | reroof: tear off roof, modified butiment 3-ply roof system, no structural changes class a 66sq less than 2/12. n/a ordinance #155-13Details
reroof: tear off roof, modified butiment 3-ply roof system, no structural changes class a 66sq less than 2/12. n/a ordinance #155-13 | $45,760 |
| May 13, 2014 | Completed final sign-off Aug 2014 | 2296 Fulton St | A - Mac Construction | remodel (e) kitchen - new cabinets, countertop, and tile floor; bathroom remodel new tub, tub surround, toilet, vanity sink, tile floor; to comply with cec150k) 8 & 10. compliance with ordinance #155-13 not requiredDetails
remodel (e) kitchen - new cabinets, countertop, and tile floor; bathroom remodel new tub, tub surround, toilet, vanity sink, tile floor; to comply with cec150k) 8 & 10. compliance with ordinance #155-13 not required | $20,000 |
| Jun 13, 2013 | Never finaled issued Jun 2013, no final | 2288 Fulton St | street spaceDetails
street space | ||
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 2288 Fulton St | street spaceDetails
street space | ||
| Jun 16, 2004 | Completed final sign-off Nov 2004 | 2288 Fulton St | replace (e) rotted wood rear stairs with new galvanized steel stairDetails
replace (e) rotted wood rear stairs with new galvanized steel stair | $35,000 |