Back to bathroom remodel contractors
Har Bro Of No. California
- Based in
- Hayward
- On San Francisco permits
- Apr 2000 to Dec 2019
- Last 24 months
- 0 permits filed
263 permits since 2000: 185 completed, 41 never finaled, 37 expired or cancelled.
Of the 41 never-finaled permits, 5 are 5 to 10 years old, 36 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 28 completed, 5 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2018 | Completed final sign-off Jul 2019 | 2292 Fulton St | rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d.Details
rehabilitate fire damaged area at #2292 in-kind (replace damaged wood windows). remodel layout at unit @ 2292. scope of remodel is as follows - rehabilitate (e) kitchen, install 2nd bath. rehabilitate (e) bathroom, install w/d. | $85,000 |
| May 13, 2016 | Completed final sign-off Apr 2019 | 251 Lincoln Wy | fire damage repair, remove & replace damaged roof framing, damaged studs and damged interior finish, minor remodeling of bath and closets.Details
fire damage repair, remove & replace damaged roof framing, damaged studs and damged interior finish, minor remodeling of bath and closets. | $500,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 425 02nd Av | remove rear deck 1/4 of third floor rear strip interior finishes. demo only. halls kitchens bathrooms 3rd floor and 2nd floor to garage. to comply with violation ces #201574912Details
remove rear deck 1/4 of third floor rear strip interior finishes. demo only. halls kitchens bathrooms 3rd floor and 2nd floor to garage. to comply with violation ces #201574912 | $15,000 |
| Sep 23, 2015 | Completed final sign-off Feb 2017 | 925 Pierce St | unit 7 - water damage repairs to plaster at living room, kitchen, bedroom & bathroom which includes remodelling. all new lights shall be led/flourescent. all 3 rooms to be repaired in kind/no windows or doors.Details
unit 7 - water damage repairs to plaster at living room, kitchen, bedroom & bathroom which includes remodelling. all new lights shall be led/flourescent. all 3 rooms to be repaired in kind/no windows or doors. | $9,000 |
| Apr 21, 2015 | Completed final sign-off Sep 2015 | 117 04th Av | unit 117: fire damage repair. non structural repairs. comply with bid nov #201529461. replace fire damaged kitchen, roofing, plaster, flooring, windows, etc., & 1 bathroom.Details
unit 117: fire damage repair. non structural repairs. comply with bid nov #201529461. replace fire damaged kitchen, roofing, plaster, flooring, windows, etc., & 1 bathroom. | $100,000 |
| Apr 23, 2014 | Expired or cancelled expired May 2016 | 830 Hyde St | mechanical, electrical, and plumbing drawing for previously approved app 201403271840. new wiring, heating and fan units. new bathroom and kitchen fixtures and associated plumbing. n/a ordinance #155-13.Details
mechanical, electrical, and plumbing drawing for previously approved app 201403271840. new wiring, heating and fan units. new bathroom and kitchen fixtures and associated plumbing. n/a ordinance #155-13. | $33,000 |
| Feb 26, 2014 | Expired or cancelled withdrawn Mar 2014 | 830 Hyde St | revision to app# 201208278280/r-2. floor plan changes to all dwelling units (9). 4 units with additional full bath(units 301,501,701,901). 4 units with additional tub(units 201,401,601,801). n/a for the maher ordinance #155-13Details
revision to app# 201208278280/r-2. floor plan changes to all dwelling units (9). 4 units with additional full bath(units 301,501,701,901). 4 units with additional tub(units 201,401,601,801). n/a for the maher ordinance #155-13 | $70,000 |
| Nov 28, 2012 | Completed final sign-off Dec 2012 | 200 Brannan St | replace minimum drywall& insulation at unit 141,142,241,242,338,339. all drywall repair is in bathrooms of aforementioned 6 units (drywall patching). replace in kind.Details
replace minimum drywall& insulation at unit 141,142,241,242,338,339. all drywall repair is in bathrooms of aforementioned 6 units (drywall patching). replace in kind. | $12,000 |
| Jul 3, 2012 | Completed final sign-off Aug 2012 | 1044 Florida St | revision to application #201108021495. revision to permit to include new bathroom or kitchenDetails
revision to application #201108021495. revision to permit to include new bathroom or kitchen | |
| Oct 19, 2011 | Completed final sign-off May 2012 | 3463 20th St | comply with nov 201133541, fire repair minimal damage to roof, replace partial siding down on south elevation, replace ceiling plaster throughout, partial wall plaster (smoke and water damage) new kitchen. lighting per cec 150 (k)8, bath lighting per cec 150 (k) 10Details
comply with nov 201133541, fire repair minimal damage to roof, replace partial siding down on south elevation, replace ceiling plaster throughout, partial wall plaster (smoke and water damage) new kitchen. lighting per cec 150 (k)8, bath lighting per cec 150 (k) 10 | $85,000 |
| Jun 1, 2011 | Completed final sign-off Mar 2012 | 790 Brannan St | 2nd floor (tenant #2) to comply w/nov #2011147561 fire damage repair: remove unpermitted 2nd floor rear deck & deck roof. remodel bathroom, replace gypsum board walls & ceilings, repair electrical system under separate permit.Details
2nd floor (tenant #2) to comply w/nov #2011147561 fire damage repair: remove unpermitted 2nd floor rear deck & deck roof. remodel bathroom, replace gypsum board walls & ceilings, repair electrical system under separate permit. | $135,000 |
| Jun 1, 2011 | Completed final sign-off Mar 2012 | 790 Brannan St | basement & 1st floor (tenant #1) to comply w/nov 201114561 fire damage repair: remodel front entrance, replace bathroom fixtures, install remote door opener, replace gypsum board walls & ceilings, repair rear deck & stair less than 20% in-kind, repair electrical under separate permit.Details
basement & 1st floor (tenant #1) to comply w/nov 201114561 fire damage repair: remodel front entrance, replace bathroom fixtures, install remote door opener, replace gypsum board walls & ceilings, repair rear deck & stair less than 20% in-kind, repair electrical under separate permit. | $250,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 2045 Cabrillo St | water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations.Details
water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations. | $32,000 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 1790 Jackson St | repair water damage in-kind to bathroom of units #201,301,401,501 & 601. repair water damage in-kind to kitchen of units #202,302,402 & 502. all drywall shall be 5/8" type x gyp.bd. plus insulation at walls seperating between units and public area, new cabinets and new fixtures, no wall relocation.Details
repair water damage in-kind to bathroom of units #201,301,401,501 & 601. repair water damage in-kind to kitchen of units #202,302,402 & 502. all drywall shall be 5/8" type x gyp.bd. plus insulation at walls seperating between units and public area, new cabinets and new fixtures, no wall relocation. | $60,000 |
| Jul 7, 2010 | Completed final sign-off Dec 2010 | 485 Dewey Bl | repair water damage in bath, remove & replace drywall, insulation, tub, sink & flooring, paint.Details
repair water damage in bath, remove & replace drywall, insulation, tub, sink & flooring, paint. | $12,677 |
| Apr 13, 2009 | Completed final sign-off Nov 2009 | 333 Monticello St | fire repair. minimal structral damage. new electric, some new plumbing fixtures & piping, new furnace. new drywall. new kitchen & bath cabinets.Details
fire repair. minimal structral damage. new electric, some new plumbing fixtures & piping, new furnace. new drywall. new kitchen & bath cabinets. | $80,000 |
| Apr 9, 2009 | Completed final sign-off Oct 2009 | 646 33rd Av | small fire repair in top floor, full bath, closet, bed, minor structural damage sister some studs, & sister 3 roof rafters, approx 40 sq. ft. roof decking, re rock & insulation in bath, hall, bed, closet, re rock & insulate same areas on 648 below.Details
small fire repair in top floor, full bath, closet, bed, minor structural damage sister some studs, & sister 3 roof rafters, approx 40 sq. ft. roof decking, re rock & insulation in bath, hall, bed, closet, re rock & insulate same areas on 648 below. | $30,000 |
| Mar 31, 2009 | Never finaled issued Mar 2009, no final | 650 33rd Av | small fire repair in top floor, full bath, closet & bedroom. minor structural damage sister 4 stud's to (e) sister 2n 2 x 6 to (e) roof sheating to be replaced approx 40 sq. ft. re sheet rock & insulate in bedroom, bathroom, closet & hall due to water damage & same area on 1st floor unit.Details
small fire repair in top floor, full bath, closet & bedroom. minor structural damage sister 4 stud's to (e) sister 2n 2 x 6 to (e) roof sheating to be replaced approx 40 sq. ft. re sheet rock & insulate in bedroom, bathroom, closet & hall due to water damage & same area on 1st floor unit. | $35,000 |
| Mar 25, 2009 | Completed final sign-off Oct 2009 | 3231 Ingalls St | gut 1st fl.(upper level) kitchen & bathroom, new finishes, insulation, drywall, paint. new windows at rear of the house, new electrical 7'x14' deck and new sliding door @ rear, new flooring zone hvac.Details
gut 1st fl.(upper level) kitchen & bathroom, new finishes, insulation, drywall, paint. new windows at rear of the house, new electrical 7'x14' deck and new sliding door @ rear, new flooring zone hvac. | $125,000 |
| Feb 20, 2009 | Expired or cancelled expired Feb 2011 | 160 Saint Elmo Wy | revision to pa# 2008-0625-5296-remodel (e) bathrooms, add new master bathroom and new powder, remodel interior stairs, remodel kitchen, relocate laundry room to basement, replace (e) windows in kind, add new windows at front & side. structural-new foundation bolts, plywood & holddowns at all floorsDetails
revision to pa# 2008-0625-5296-remodel (e) bathrooms, add new master bathroom and new powder, remodel interior stairs, remodel kitchen, relocate laundry room to basement, replace (e) windows in kind, add new windows at front & side. structural-new foundation bolts, plywood & holddowns at all floors | $80,000 |
| Feb 5, 2009 | Completed final sign-off May 2009 | 301 Main St | work @ unit# 27b only. remove & replace walls & floors tiles, shower pan, replace dry walls as necessary in both bathroom, remove & replace engineer hardwood floor in living room, dinning room, entry way & bedroom guest. remove & replace counter top only. sink, faucets due to water damage inDetails
work @ unit# 27b only. remove & replace walls & floors tiles, shower pan, replace dry walls as necessary in both bathroom, remove & replace engineer hardwood floor in living room, dinning room, entry way & bedroom guest. remove & replace counter top only. sink, faucets due to water damage in | $29,236 |
| Nov 30, 2007 | Never finaled issued Nov 2007, no final | 444 Larkin St | fire damage repair at lightwell walls sheathing exterior, sheetrock and exterior finish, some minor stud replacement, at 3rd fl and units 5, 6, 11, 12, 18 & 19 bathroom window, elevator shaft interior finishes, rewire replacement two floor levels, replace all plumbing in lightwell for apartments.Details
fire damage repair at lightwell walls sheathing exterior, sheetrock and exterior finish, some minor stud replacement, at 3rd fl and units 5, 6, 11, 12, 18 & 19 bathroom window, elevator shaft interior finishes, rewire replacement two floor levels, replace all plumbing in lightwell for apartments. | $80,000 |
| Sep 24, 2007 | Completed final sign-off Feb 2008 | 225 Cortland Av | 1)remove cab's sheetrock, floors in kitchen due to water damage for fire repair. plmg and elect. to meet code and replace as needed. 2) remove and replace bath tub/shower, vanity and toilet in bathroomDetails
1)remove cab's sheetrock, floors in kitchen due to water damage for fire repair. plmg and elect. to meet code and replace as needed. 2) remove and replace bath tub/shower, vanity and toilet in bathroom | $7,000 |
| Nov 20, 2006 | Completed final sign-off Nov 2007 | 2819 Laguna St | fire repair, like kind and quality roof and waqll repair floor joists, kitchen ad bath replacement drywall and plaster replacementDetails
fire repair, like kind and quality roof and waqll repair floor joists, kitchen ad bath replacement drywall and plaster replacement | $120,000 |
| Nov 6, 2006 | Completed final sign-off Aug 2007 | 930 Hayes St | fire repair, like kind and quality minor framing and siding kchn and bath replacement, plaster repair, major work in unit 10, water damage repair in units 5,6,9Details
fire repair, like kind and quality minor framing and siding kchn and bath replacement, plaster repair, major work in unit 10, water damage repair in units 5,6,9 | $80,000 |
| Nov 2, 2005 | Never finaled issued Nov 2005, no final | 1231 08th Av | demo burnt frame & siding & dryrot at bath one unit/demo fire damaged stairs and about 12 ft wide wall at right middle side of bldg/reconstruction drwg on separate permitDetails
demo burnt frame & siding & dryrot at bath one unit/demo fire damaged stairs and about 12 ft wide wall at right middle side of bldg/reconstruction drwg on separate permit | $10,000 |
| Oct 17, 2005 | Never finaled filed Oct 2005, never issued | 1231 08th Av | fire damage repair. mininal electrical, drywall lids, finish carpentry, replace bornt wall 18' long, re do 2 bath rooms, 1 kitchen. repaint complete.Details
fire damage repair. mininal electrical, drywall lids, finish carpentry, replace bornt wall 18' long, re do 2 bath rooms, 1 kitchen. repaint complete. | $150,000 |
| Oct 11, 2005 | Completed final sign-off Jun 2006 | 301 Marina Bl | reconfigure (e)bathroom @2/f,replace fire damaged,(e)non conforming stair with 5'diameter spiral staircase from 3/f to (e)roof deck (350.6 sq.ft.).reconfigure (e)bathroom into 2 bathrooms @3/f,repair (e)parapet wall & upgrade to 36"high roofdeck guardrail @ roof level.replace fire damaged (e)roofDetails
reconfigure (e)bathroom @2/f,replace fire damaged,(e)non conforming stair with 5'diameter spiral staircase from 3/f to (e)roof deck (350.6 sq.ft.).reconfigure (e)bathroom into 2 bathrooms @3/f,repair (e)parapet wall & upgrade to 36"high roofdeck guardrail @ roof level.replace fire damaged (e)roof | $120,000 |
| Jan 13, 2005 | Completed final sign-off Jun 2005 | 250 Bridgeview Dr | remove damaged sheet rock.install cabinet,repl ace finish plumbing fixtures in kitchen&bath.Details
remove damaged sheet rock.install cabinet,repl ace finish plumbing fixtures in kitchen&bath. | $30,000 |
| Jan 6, 2005 | Completed final sign-off Sep 2005 | 706 43rd Av | repair in livingrm, diningrm, kitchen, bath & all on upper flr. drywall replacement not to exceed twDetails
repair in livingrm, diningrm, kitchen, bath & all on upper flr. drywall replacement not to exceed tw | $60,000 |
| Jun 10, 2004 | Never finaled issued Jun 2004, no final | 2835 Clay St | fire repair-this permit for dmo only 2 bathrooms, 2 bdrms, living room, 400'+ or exterior siding. reDetails
fire repair-this permit for dmo only 2 bathrooms, 2 bdrms, living room, 400'+ or exterior siding. re | $7,500 |
| Jul 31, 2002 | Completed final sign-off Sep 2002 | 755 Monterey Bl | repair water damage to bath room/sheetrock, light frame damage, replace ext.siding 10x20 sf of ext sDetails
repair water damage to bath room/sheetrock, light frame damage, replace ext.siding 10x20 sf of ext s | $15,000 |
| Jun 18, 2002 | Completed final sign-off Mar 2003 | 1024 Florida St | roof repair,siding,windows,lath/plstr w/drywall,kitchen & bath,plumb/elec upgrd,heating upgrd (4 aptDetails
roof repair,siding,windows,lath/plstr w/drywall,kitchen & bath,plumb/elec upgrd,heating upgrd (4 apt | $200,000 |
| Dec 18, 2001 | Completed final sign-off Jun 2002 | 275 Turk St | rebuild fire damaged apt units (5) bathrooms,kitchens,litewell,cosmetic smoke and water damage repaiDetails
rebuild fire damaged apt units (5) bathrooms,kitchens,litewell,cosmetic smoke and water damage repai | $150,000 |
| Sep 17, 2001 | Completed final sign-off Aug 2002 | 470 15th Av | repair fire damage no changes replace lath and plaster base casing kitchen cabinets bath fixturesDetails
repair fire damage no changes replace lath and plaster base casing kitchen cabinets bath fixtures | $85,750 |
| Aug 29, 2001 | Completed final sign-off Feb 2003 | 501 Capp St | fire repair drywall replacement kitchen-bath fixts.structural roof & staircase repair under separateDetails
fire repair drywall replacement kitchen-bath fixts.structural roof & staircase repair under separate | $170,000 |
| Jun 28, 2001 | Expired or cancelled expired Jun 2002 | 1148 Montgomery St | interior remodel-new bathrooms & kitchens. new (2) furnaces, wter heaters. new electrical & lightingDetails
interior remodel-new bathrooms & kitchens. new (2) furnaces, wter heaters. new electrical & lighting | $70,000 |