Block 1664, lot 043
2045 Cabrillo St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 9,405 sq ft
- Lot
- 4,273 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 14, 2020 | Completed final sign-off Feb 2020 | 2045 Cabrillo St | Steelcore Builders Inc | revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 designDetails
revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 design | |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 2045 Cabrillo St | street spaceDetails
street space | ||
| Aug 29, 2017 | Completed final sign-off Feb 2020 | 2045 Cabrillo St | soft story retrofit to confomr with chater 4d of the sfebc per ab-107 utilizing fema p-807 design.Details
soft story retrofit to confomr with chater 4d of the sfebc per ab-107 utilizing fema p-807 design. | $45,000 | |
| Jan 13, 2015 | Completed final sign-off Jan 2015 | 2045 Cabrillo St | Make Ready Maintenance Inc | unit 7. kitchen and bathroom remodel. replace appliancds & cabinets, in kind. no structural work.Details
unit 7. kitchen and bathroom remodel. replace appliancds & cabinets, in kind. no structural work. | $20,000 |
| Nov 26, 2014 | Completed final sign-off Mar 2015 | 2045 Cabrillo St | Everest Waterproofing & Restoration Inc. | to comply with nov ces: 201317521. remove brick veneer 3'above garade door, cut open drywall at garage header and install c channel to strength the header and rebuild brick in kind with same brickDetails
to comply with nov ces: 201317521. remove brick veneer 3'above garade door, cut open drywall at garage header and install c channel to strength the header and rebuild brick in kind with same brick | $30,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 2045 Cabrillo St | Har Bro Of No. California | water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations.Details
water damage repair in units #3,4,7,8 & 11: replace insulation, drywall,finish carpentry and wood flooring. tiles work, toilet & shower faucet for bath rm in units #3 & 7. approx. 200 sf of flr area per unit. 5/8" type x gyp bd at all locations. | $32,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Everest Waterproofing & Restoration Inc., Har Bro Of No. California, Make Ready Maintenance Inc, Steelcore Builders Inc
- Architects
- Alan Burr
- Engineers
- Alan Charles Burr
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.