Block 0273, lot 001D
835 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 16
- Rooms
- 16 bathrooms
- Building
- 10,950 sq ft
- Lot
- 4,948 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 835 Pine St | Redlog Flooring Services Corp | unit #8: plaster repairs in living room wall in-kind, not to exceed 200 sq ft.Details
unit #8: plaster repairs in living room wall in-kind, not to exceed 200 sq ft. | $4,000 |
| Sep 9, 2025 | Completed final sign-off Nov 2025 | 835 Pine St | Redlog Flooring Services Corp | replace siding 20' x 60' in kind. back of home, like for like materials.Details
replace siding 20' x 60' in kind. back of home, like for like materials. | $45,000 |
| Jul 10, 2023 | Completed final sign-off Jan 2024 | 835 Pine St | Au Electric Corporation/Aec Alarms | upgrade existing fa system to compy with sffc 1103.7.6.1 by installing new wireless low frequency sounders & like-for-like replacements for existing smoke detectors, pull stations, horn/strobes in common areas.Details
upgrade existing fa system to compy with sffc 1103.7.6.1 by installing new wireless low frequency sounders & like-for-like replacements for existing smoke detectors, pull stations, horn/strobes in common areas. | $55,000 |
| Aug 9, 2021 | Completed final sign-off May 2022 | 835 Pine St | B-Side Inc. | unit 7: convert (e) kitchen to study. relocate kitchen. rehab (e) bathroom. install washer/ dryerDetails
unit 7: convert (e) kitchen to study. relocate kitchen. rehab (e) bathroom. install washer/ dryer | $44,000 |
| Jun 23, 2021 | Completed final sign-off Dec 2021 | 835 Pine St | Brighter Bay Builders Inc | unit 8 - convert kitchen to study. relocate kitchen, rehabilitate existing bathroom and install washer & dryer.Details
unit 8 - convert kitchen to study. relocate kitchen, rehabilitate existing bathroom and install washer & dryer. | $45,000 |
| Nov 25, 2020 | Never finaled issued Oct 2022, no final | 835 Pine St | Wickman Development And Construction | convert (e) storage spaces into (2) accessory dwelling unit per ordinance 162-16, for building total of 18 units. entire basement ceiling assembly @ unit to be upgraded to an 1 hour rated asssembly per information sheet fs-05.Details
convert (e) storage spaces into (2) accessory dwelling unit per ordinance 162-16, for building total of 18 units. entire basement ceiling assembly @ unit to be upgraded to an 1 hour rated asssembly per information sheet fs-05. | $50,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 835 Pine St | B-Side Inc. | unit 4. replace washer dryer ventless, upgreade line. no structural work, no moving walls.Details
unit 4. replace washer dryer ventless, upgreade line. no structural work, no moving walls. | $5,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 835 Pine St | street spaceDetails
street space | ||
| Jun 19, 2018 | Completed final sign-off Sep 2018 | 835 Pine St | Brighter Bay Builders Inc | unit#15 rehabilitate existing kitchen & bathroom, install washer/dryer. n/a for maher.Details
unit#15 rehabilitate existing kitchen & bathroom, install washer/dryer. n/a for maher. | $30,000 |
| Jan 3, 2018 | Completed final sign-off Apr 2018 | 835 Pine St | Kong's Plumbing & Construction Co. | #14 - rehabiliate (e) kitchen & bathroom. install w/d maher naDetails
#14 - rehabiliate (e) kitchen & bathroom. install w/d maher na | $27,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 835 Pine St | Har Bro Of No. California | unit #8: install dry wall and insulation at bay window facing rear of buildingDetails
unit #8: install dry wall and insulation at bay window facing rear of building | $6,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 835 Pine St | Har Bro Of No. California | remove/replace aging siding to match (e), not visible from street at rear.Details
remove/replace aging siding to match (e), not visible from street at rear. | $25,000 |
| Dec 14, 2016 | Never finaled issued Jan 2017, no final | 835 Pine St | Casman Construction Inc | remodel unit 9 on the 3rd fl, remodel existing kitchen, existing bath, add washer and dryer. compliance with maher ord-155-13 na.Details
remodel unit 9 on the 3rd fl, remodel existing kitchen, existing bath, add washer and dryer. compliance with maher ord-155-13 na. | $24,000 |
| Sep 19, 2016 | Never finaled issued Sep 2016, no final | 835 Pine St | street spaceDetails
street space | ||
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 835 Pine St | B-Side Inc. | 3/f #12- remodel existing kitchen, add washer & dryer. n/a ordinance #155-13Details
3/f #12- remodel existing kitchen, add washer & dryer. n/a ordinance #155-13 | $15,000 |
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 835 Pine St | Cook Construction | remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required.Details
remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required. | $25,000 |
| Feb 18, 2016 | Never finaled issued Feb 2016, no final | 835 Pine St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 835 Pine St | Boss Construction Inc. | apt 4: 1/f: remodel (e) kitchen, upgrade electrical pand and add washer/dryer.Details
apt 4: 1/f: remodel (e) kitchen, upgrade electrical pand and add washer/dryer. | $15,000 |
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 835 Pine St | street spaceDetails
street space | ||
| Nov 3, 2015 | Completed final sign-off Jan 2016 | 835 Pine St | Boss Construction Inc. | unit #5: remodel on 1st floor. remodel extg kitchen and addition of dishwasher. add washer and dryer.Details
unit #5: remodel on 1st floor. remodel extg kitchen and addition of dishwasher. add washer and dryer. | $15,000 |
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 835 Pine St | B-Side Inc. | unit #2 remodel at ground floor, remodel existing kitchen & addition of dishwasher, add washer and dryer; maher n/aDetails
unit #2 remodel at ground floor, remodel existing kitchen & addition of dishwasher, add washer and dryer; maher n/a | $20,000 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 835 Pine St | B-Side Inc. | 1. remodel unit #16 at 3rd floor. 2. remodel (e) kitchen & addition of dishwasher. add washer and dryer.Details
1. remodel unit #16 at 3rd floor. 2. remodel (e) kitchen & addition of dishwasher. add washer and dryer. | $25,000 |
| Jun 3, 2015 | Completed final sign-off May 2016 | 835 Pine St | Dan Gillies Construction Services Inc | mandatory soft story retrofit per san francisco ordinance per sfbc chapter 34b. engineering criteria 2012 iebc appendix a-4. maher n/a.Details
mandatory soft story retrofit per san francisco ordinance per sfbc chapter 34b. engineering criteria 2012 iebc appendix a-4. maher n/a. | $30,000 |
| Jun 1, 2015 | Completed final sign-off Feb 2016 | 835 Pine St | B-Side Inc. | unit #1: grnd flr: remodel kitchen and addition of new dishwasher. addition of new washer/dryer. maher naDetails
unit #1: grnd flr: remodel kitchen and addition of new dishwasher. addition of new washer/dryer. maher na | $30,000 |
| Aug 9, 2011 | Never finaled issued Aug 2011, no final | 835 Pine St | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 11, 2007 | Never finaled issued Jun 2007, no final | 835 Pine St | S J Gogol Construction | under termite report# 8917-06, item# 1c, 1e, 2b, 4a, 5b, 5f.Details
under termite report# 8917-06, item# 1c, 1e, 2b, 4a, 5b, 5f. | $6,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (6), Boss Construction Inc. (2), Brighter Bay Builders Inc (2), Har Bro Of No. California (2), Redlog Flooring Services Corp (2), Au Electric Corporation/Aec Alarms, Casman Construction Inc, Cook Construction, Dan Gillies Construction Services Inc, Kong's Plumbing & Construction Co., S J Gogol Construction, Wickman Development And Construction
- Engineers
- Jefferson Chen (2), Joe Win Kon (2)
- Authorized agent-otherss
- Joe Win Kon