Block 3533, lot 042
138 Clinton Park
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 4
- Units
- 8
- Rooms
- 8 bedrooms, 8 bathrooms
- Building
- 6,068 sq ft
- Lot
- 2,186 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2023 | Completed final sign-off Mar 2023 | 138 Clinton Pk | M Rivera Construction Inc. | replace door jam, repair damaged (front) exterior door per complaint # 202301372 item #3Details
replace door jam, repair damaged (front) exterior door per complaint # 202301372 item #3 | $2,800 |
| Nov 18, 2021 | Completed final sign-off Mar 2022 | 138 Clinton Pk | Magnum Construction Group Inc | install fire alarm for fire sprinkler monitoring system. (1) pull, (1) smoke, temper & flow. adding 16 lf sounder & 5 horn/strobes. adu pa #201711164199Details
install fire alarm for fire sprinkler monitoring system. (1) pull, (1) smoke, temper & flow. adding 16 lf sounder & 5 horn/strobes. adu pa #201711164199 | $5,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2022 | 138 Clinton Pk | Magnum Construction Group Inc | install new fire sprinkler systemper nfpa 13. ground floor only included 2" underground fire service. total = 29 heads.Details
install new fire sprinkler systemper nfpa 13. ground floor only included 2" underground fire service. total = 29 heads. | $18,000 |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 138 Clinton Pk | street spaceDetails
street space | ||
| Nov 16, 2017 | Completed final sign-off Mar 2022 | 138 Clinton Pk | Green City Construction Inc | add two adu units on ground floor per ordinance 162-16, (2) one-bedroom units; (1) kitchen & (1) bath for each unit.Details
add two adu units on ground floor per ordinance 162-16, (2) one-bedroom units; (1) kitchen & (1) bath for each unit. | $275,000 |
| Nov 7, 2017 | Completed final sign-off Mar 2022 | 140 Clinton Pk | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $150,000 | |
| May 27, 2014 | Completed final sign-off Jun 2014 | 138 Clinton Pk | Skylor Construction Dba Skycore Constr | drywall replacement to comply with nov# 201453561, item 4 & 8. 2'x6' 2'x5' 2'x2' 2'x2'Details
drywall replacement to comply with nov# 201453561, item 4 & 8. 2'x6' 2'x5' 2'x2' 2'x2' | $350 |
| Mar 4, 2013 | Never finaled issued Mar 2013, no final | 138 Clinton Pk | Architectural Fenestration & Restoration | retrofit 7 windows with new vinyl framed units in same type and kind on non street elevations, 3 @ kitchen, 2 @ bath, 1 @ sink, & 1 @ bedroom. no new openings, all to be single hung windows to comply with complaint #201384721 item #3, u factor 0.40 max.Details
retrofit 7 windows with new vinyl framed units in same type and kind on non street elevations, 3 @ kitchen, 2 @ bath, 1 @ sink, & 1 @ bedroom. no new openings, all to be single hung windows to comply with complaint #201384721 item #3, u factor 0.40 max. | $3,980 |
| Feb 7, 2013 | Completed final sign-off Mar 2013 | 138 Clinton Pk | Har Bro Of No. California | to comply with nov # 201384721 , items # 1,2,3 & 4Details
to comply with nov # 201384721 , items # 1,2,3 & 4 | $3,500 |
| Apr 8, 2011 | Never finaled issued Apr 2011, no final | 138 Clinton Pk | street space & sidewalkDetails
street space & sidewalk | ||
| Oct 26, 2007 | Completed final sign-off Nov 2007 | 140 Clinton Pk | Rivera Construction | bolt mudsill 50 bolts.Details
bolt mudsill 50 bolts. | $1,200 |
| Mar 8, 2005 | Expired or cancelled expired Aug 2007 | 140 Clinton Pk | Young's Roofing, Inc. | reroofingDetails
reroofing | $4,800 |
| Feb 11, 2004 | Completed final sign-off Mar 2004 | 138 Clinton Pk | The Garza Company | unit #b.complete cabinet wk,counter tops,kitchen sink,faucets,vanity light fixtures,gfci outlets.Details
unit #b.complete cabinet wk,counter tops,kitchen sink,faucets,vanity light fixtures,gfci outlets. | $12,000 |
| Sep 26, 2001 | Completed final sign-off Nov 2001 | 138 Clinton Pk | Tadgh Patrick Mc Sweeney | remove stucco and repair dryrot to front of buildingDetails
remove stucco and repair dryrot to front of building | $16,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Magnum Construction Group Inc (2), Architectural Fenestration & Restoration, Green City Construction Inc, Har Bro Of No. California, M Rivera Construction Inc., Rivera Construction, Skylor Construction Dba Skycore Constr, Tadgh Patrick Mc Sweeney, The Garza Company, Young's Roofing, Inc.
- Architects
- John Hood
- Engineers
- Daniel Barringer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.