Block 0275, lot 006
980 Bush St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 5
- Units
- 73
- Rooms
- 44 bedrooms, 83 bathrooms
- Building
- 48,740 sq ft
- Lot
- 12,169 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
55 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2024 | Completed final sign-off Oct 2025 | 980 Bush St | Halyard Inc | upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas. | $5,000 |
| Jan 26, 2023 | Never finaled issued Jan 2023, no final | 980 Bush St | Bkr Services Inc Dba Bkr Construction Se | apt 210: remodel (e) 1 kitchen & 1 bathroom. no new walls, no windows.Details
apt 210: remodel (e) 1 kitchen & 1 bathroom. no new walls, no windows. | $35,000 |
| Jan 23, 2023 | Never finaled issued Jan 2023, no final | 980 Bush St | Bkr Services Inc Dba Bkr Construction Se | apt 214: remodel (e) 1 kitchen & 1 bathroom. no new walls, no windows.Details
apt 214: remodel (e) 1 kitchen & 1 bathroom. no new walls, no windows. | $35,000 |
| Dec 2, 2020 | Never finaled filed Dec 2020, never issued | 980 Bush St | adding two units, on basement level & one unit on first level per ordinance 162-16. convert existing basement and partial first level into new dwelling units within (e) envelope. new bedrooms, new bathrooms, new dishwashers, new washer/dryers. new windows facing the street.Details
adding two units, on basement level & one unit on first level per ordinance 162-16. convert existing basement and partial first level into new dwelling units within (e) envelope. new bedrooms, new bathrooms, new dishwashers, new washer/dryers. new windows facing the street. | $150,000 | |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 980 Bush St | street space | ||
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 980 Bush St | street spaceDetails
street space | ||
| Mar 4, 2020 | Completed final sign-off Sep 2020 | 980 Bush St | Halyard Inc | unit 204, 2nd fl - new bedroom, remodel kitchen & bathrooms. new lighting at (e) boxes. no change to mech. no additional plumbing fixtures. no exterior work. no fire alarm or sprinkler work. no structuralDetails
unit 204, 2nd fl - new bedroom, remodel kitchen & bathrooms. new lighting at (e) boxes. no change to mech. no additional plumbing fixtures. no exterior work. no fire alarm or sprinkler work. no structural | $65,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 980 Bush St | street spaceDetails
street space | ||
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 980 Bush St | Halyard Inc | renovation of 5 apartments: unit 111 and 116 on 1st floor, unit 203 on 2nd floor, unit 406 and 412 on 4th fl. new bedrooms, nw kitchen cabinets, nw lighting at extg j-box. no additional plmg fixtures. no fire alarm or sprinkler work. no exterior or structural work. n/a for maher.Details
renovation of 5 apartments: unit 111 and 116 on 1st floor, unit 203 on 2nd floor, unit 406 and 412 on 4th fl. new bedrooms, nw kitchen cabinets, nw lighting at extg j-box. no additional plmg fixtures. no fire alarm or sprinkler work. no exterior or structural work. n/a for maher. | $300,000 |
| Sep 4, 2019 | Expired or cancelled cancelled Nov 2019 | 980 Bush St | Halyard Inc | remodel kitchen & bathroom @ 5 units.111-116 on 1/f kitchen 50 sq ft. (n) counter, cabinets and plumbing fixture in kind. bathroom 45 sq ft. (n) tile, vanity & fixture in kind. no change to mech, no exterior work, no fire alarm/sprinker work no structural.Details
remodel kitchen & bathroom @ 5 units.111-116 on 1/f kitchen 50 sq ft. (n) counter, cabinets and plumbing fixture in kind. bathroom 45 sq ft. (n) tile, vanity & fixture in kind. no change to mech, no exterior work, no fire alarm/sprinker work no structural. | $50,000 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 980 Bush St | street spaceDetails
street space | ||
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 980 Bush St | Halyard Inc | renovation of units: 102,200,209,311,510: remodel kitchens & bathrooms. new bedrm in 200,311,510. new lighting @ (e) j boxes, no change to mech. no addl plmbg fixtures. no ext work. no fa or sprinklers or struct workDetails
renovation of units: 102,200,209,311,510: remodel kitchens & bathrooms. new bedrm in 200,311,510. new lighting @ (e) j boxes, no change to mech. no addl plmbg fixtures. no ext work. no fa or sprinklers or struct work | $300,000 |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 980 Bush St | Halyard Inc | exploratory demo at units 102,116,200,.209.311.510, for structural evaluation demo not to exceed 50 sq ft @each unit, repalce in kind, not a permanent demo project will not violate ch41 of hte sf admin codeDetails
exploratory demo at units 102,116,200,.209.311.510, for structural evaluation demo not to exceed 50 sq ft @each unit, repalce in kind, not a permanent demo project will not violate ch41 of hte sf admin code | $5,000 |
| Mar 30, 2018 | Expired or cancelled withdrawn Jun 2019 | 998 Bush St | renovation of unit 200 - including new bedroom, new bath, new laundry. renovated kitchen and bath, new lighting no exterior workDetails
renovation of unit 200 - including new bedroom, new bath, new laundry. renovated kitchen and bath, new lighting no exterior work | $40,000 | |
| Mar 30, 2018 | Expired or cancelled cancelled Jan 2026 | 998 Bush St | renovation of unit 512 - including new bedroom, new laundry. renovated kitchen and bath, new lighting no exterior workDetails
renovation of unit 512 - including new bedroom, new laundry. renovated kitchen and bath, new lighting no exterior work | $30,000 | |
| Mar 9, 2018 | Completed final sign-off Jul 2018 | 980 Bush St | Hon's Construction Inc. | renovation of unit 512 including new bedroom, new laundry, renovate kitchen and bath, new lighting. no exterior changes. n/a for maherDetails
renovation of unit 512 including new bedroom, new laundry, renovate kitchen and bath, new lighting. no exterior changes. n/a for maher | $40,000 |
| Jan 10, 2018 | Never finaled issued Jan 2018, no final | 980 Bush St | street space permitDetails
street space permit | ||
| Dec 20, 2017 | Never finaled filed Dec 2017, never issued | 980 Bush St | Hon's Construction Inc. | add partition wall in lobby to create temp storage space. to comply with nov 201700179.Details
add partition wall in lobby to create temp storage space. to comply with nov 201700179. | $500 |
| Nov 6, 2017 | Completed final sign-off Apr 2018 | 980 Bush St | Hon's Construction Inc. | renovation unit 514 5th fl includes new bedroom, new bath, new laundry, renovated kitche, bath, lighting, revised heating, no exterior changesDetails
renovation unit 514 5th fl includes new bedroom, new bath, new laundry, renovated kitche, bath, lighting, revised heating, no exterior changes | $45,000 |
| Aug 28, 2017 | Expired or cancelled cancelled Jul 2023 | 980 Bush St | fire alarm system upgrade per sffc section 1103.7.6Details
fire alarm system upgrade per sffc section 1103.7.6 | $5,000 | |
| Aug 8, 2017 | Completed final sign-off Mar 2018 | 980 Bush St | Hon's Construction Inc. | renovation of unit #504 on the 5th fl. include adding a new bedroom, new bath, new laundry, renovate kitchen, new lighting. no exterior work. maher naDetails
renovation of unit #504 on the 5th fl. include adding a new bedroom, new bath, new laundry, renovate kitchen, new lighting. no exterior work. maher na | $30,000 |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 980 Bush St | street space permitDetails
street space permit | ||
| Jun 14, 2017 | Completed final sign-off Jan 2018 | 980 Bush St | Hon's Construction Inc. | renovation of apt 201 2nd fl including new bedroom, new laundry, ren0ovated kitchen and bath, new lighting, revised heating, no exterior changes. sprinklers under separate permitDetails
renovation of apt 201 2nd fl including new bedroom, new laundry, ren0ovated kitchen and bath, new lighting, revised heating, no exterior changes. sprinklers under separate permit | $30,000 |
| Jun 7, 2017 | Completed final sign-off Feb 2018 | 980 Bush St | Hon's Construction Inc. | unit #206, 2nd floor: renovate including new bedroom, new laundry. renovate kitchen and bath, new lighting. no exterior changes. n/a maher ordinanceDetails
unit #206, 2nd floor: renovate including new bedroom, new laundry. renovate kitchen and bath, new lighting. no exterior changes. n/a maher ordinance | $30,000 |
| May 4, 2017 | Never finaled issued Jun 2017, no final | 980 Bush St | Hon's Construction Inc. | unit #502: reconfiguration including new bedroom new laundry, renovate kitchen & bath, new lighting and renovated heating. no exterio work or changes maher naDetails
unit #502: reconfiguration including new bedroom new laundry, renovate kitchen & bath, new lighting and renovated heating. no exterio work or changes maher na | $30,000 |
| Apr 17, 2017 | Completed final sign-off Feb 2018 | 980 Bush St | Hon's Construction Inc. | #304, #404- to comply nov#201773921, renovation of apt. 304 & 404 on 2/f & 3/f, add new bedroom and laundry, renovate kitchen and bath, new lighting. n/a ordinance #155-13Details
#304, #404- to comply nov#201773921, renovation of apt. 304 & 404 on 2/f & 3/f, add new bedroom and laundry, renovate kitchen and bath, new lighting. n/a ordinance #155-13 | $80,000 |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 980 Bush St | Hon's Construction Inc. | #307: revision to app#201610241035. revision to #307 on 3rd floor. relocate kitchen and bath. maher naDetails
#307: revision to app#201610241035. revision to #307 on 3rd floor. relocate kitchen and bath. maher na | $5,000 |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 980 Bush St | Make Ready Maintenance Inc | unit 116 - 10 sqft lobby ceiling repair; outside unit; and approx. 96 sqft ceiling reapir in unit from plumbing leak 2/f unit.Details
unit 116 - 10 sqft lobby ceiling repair; outside unit; and approx. 96 sqft ceiling reapir in unit from plumbing leak 2/f unit. | $600 |
| Jan 26, 2017 | Never finaled issued Mar 2017, no final | 980 Bush St | Hon's Construction Inc. | renovation of units 300, 401 and 414 including addition of bedrooms, renovation of kitchens & baths, relocation of partitions. installation of new laundry closets, lighting revisions and heating. no exterior changes. life safety deferred.Details
renovation of units 300, 401 and 414 including addition of bedrooms, renovation of kitchens & baths, relocation of partitions. installation of new laundry closets, lighting revisions and heating. no exterior changes. life safety deferred. | $75,000 |
| Jan 26, 2017 | Never finaled issued Mar 2017, no final | 980 Bush St | Hon's Construction Inc. | renovation of units 205, 305 and 505 including addition of bedrooms, renovation of kitchens & baths, relocation of partitions. installation of new laundry closets, lighting revisions and heating. no exterior changes. life safety deferred. fire alarm/sprinkler deferred.Details
renovation of units 205, 305 and 505 including addition of bedrooms, renovation of kitchens & baths, relocation of partitions. installation of new laundry closets, lighting revisions and heating. no exterior changes. life safety deferred. fire alarm/sprinkler deferred. | $75,000 |
| Oct 24, 2016 | Never finaled issued Feb 2017, no final | 980 Bush St | Hon's Construction Inc. | renovation of apt 307 including remodel to kitchen and bath, new partitions, new laundry closet, new lights. no exterior work.Details
renovation of apt 307 including remodel to kitchen and bath, new partitions, new laundry closet, new lights. no exterior work. | $30,000 |
| Sep 14, 2016 | Never finaled issued Oct 2016, no final | 980 Bush St | S & H Renovations | 2/f #208 & 3/f #400- addition of one bedroom, renovation of kitchen, bathroom, relocation of partitions, install new laundry closet, lighting revisions and revision of (e) heating. unit 208 on 2nd floor and 400 is on 3rd story. maher naDetails
2/f #208 & 3/f #400- addition of one bedroom, renovation of kitchen, bathroom, relocation of partitions, install new laundry closet, lighting revisions and revision of (e) heating. unit 208 on 2nd floor and 400 is on 3rd story. maher na | $50,000 |
| Dec 14, 2012 | Never finaled issued Dec 2012, no final | 980 Bush St | street space permitDetails
street space permit | ||
| Feb 26, 2010 | Completed final sign-off Jul 2010 | 980 Bush St | Make Ready Maintenance Inc | change kitchen cabinets, countertop like for like, plumbing, electrical fixtures upgrade. change vanity, toilet & surround. new lighting per cec 150k, no change to exhaust system. no structural workDetails
change kitchen cabinets, countertop like for like, plumbing, electrical fixtures upgrade. change vanity, toilet & surround. new lighting per cec 150k, no change to exhaust system. no structural work | $9,500 |
| Aug 14, 2007 | Completed final sign-off Sep 2007 | 980 Bush St | F B E And Sons General Const | apt 408 -complete bathroom & kitchen remodel. no structural work, no lighting. replace bathroom window glass to temper glass just replace window 0.67 u-factor min.Details
apt 408 -complete bathroom & kitchen remodel. no structural work, no lighting. replace bathroom window glass to temper glass just replace window 0.67 u-factor min. | $10,000 |
| May 24, 2005 | Completed final sign-off Sep 2005 | 980 Bush St | On-Site Maintenance | remove non structural partition wall between kitchen and living roomDetails
remove non structural partition wall between kitchen and living room | $500 |
| Apr 28, 2005 | Never finaled issued Apr 2005, no final | 980 Bush St | street space permitDetails
street space permit | ||
| Mar 1, 2005 | Completed final sign-off Nov 2005 | 980 Bush St | On-Site Maintenance | replace old kchn cabinets with new cabnts/new tile in bthrm/shower valve replace bth sinkDetails
replace old kchn cabinets with new cabnts/new tile in bthrm/shower valve replace bth sink | $12,000 |
| May 17, 2002 | Expired or cancelled cancelled May 2002 | 980 Bush St | fire damage repair in kindDetails
fire damage repair in kind | $75,000 | |
| Mar 27, 2002 | Completed final sign-off May 2002 | 980 Bush St | J L Constrution Co. | fix cracked corner and stucco at courtyard 8x12 ,brick veneer repair 2x12,not visible from street -Details
fix cracked corner and stucco at courtyard 8x12 ,brick veneer repair 2x12,not visible from street - | $1,500 |
| Feb 6, 2001 | Expired or cancelled expired Aug 2001 | 980 Bush St | On-Site Maintenance | kitchen remodel new tile, sink, lino & cabinets.Details
kitchen remodel new tile, sink, lino & cabinets. | $7,000 |
| Oct 31, 2000 | Expired or cancelled expired Apr 2001 | 980 Bush St | 101 Roofing | reroofingDetails
reroofing | $20,000 |
| Aug 30, 2000 | Expired or cancelled expired Dec 2000 | 980 Bush St | rev to 2000/07/15/5230-attic access to units 506, 07,08,09-sheetrock hallways-maintain fire-rated asDetails
rev to 2000/07/15/5230-attic access to units 506, 07,08,09-sheetrock hallways-maintain fire-rated as | $1,000 | |
| Jul 15, 2000 | Expired or cancelled expired Jan 2001 | 980 Bush St | revise to app #200006072041 plans to provide fire stop in kitchen provide walls remove & new wallsDetails
revise to app #200006072041 plans to provide fire stop in kitchen provide walls remove & new walls | $8,000 | |
| Jul 15, 2000 | Expired or cancelled expired Nov 2000 | 980 Bush St | revise to app #2000282981 200003144312 200004106822 provide attic access & fire stops in demising wlDetails
revise to app #2000282981 200003144312 200004106822 provide attic access & fire stops in demising wl | $3,500 | |
| Jun 7, 2000 | Expired or cancelled expired Oct 2000 | 980 Bush St | On-Site Maintenance | revision to app #2000005059201Details
revision to app #2000005059201 | |
| May 5, 2000 | Expired or cancelled expired Sep 2000 | 980 Bush St | On-Site Maintenance | remodel bathroom & kitchen, upgrade elec,plumbing, new cabinetsDetails
remodel bathroom & kitchen, upgrade elec,plumbing, new cabinets | $4,000 |
| Apr 27, 2000 | Completed final sign-off Oct 2015 | 980 Bush St | Ac And Company | revision to application 9923475, replace as needed wire brush,delete all other items 1 thru 4Details
revision to application 9923475, replace as needed wire brush,delete all other items 1 thru 4 | $8,000 |
| Apr 10, 2000 | Expired or cancelled expired Oct 2000 | 980 Bush St | On-Site Maintenance | revision to 500/502/503/addition to 506/507/508/509/511/all new vaulsted ceilingDetails
revision to 500/502/503/addition to 506/507/508/509/511/all new vaulsted ceiling | $10,000 |
| Apr 7, 2000 | Expired or cancelled expired Apr 2001 | 980 Bush St | On-Site Maintenance | remodel kitchen & bathrooms in 506, 507,508,509 new cabinets tile-lino & appliances\Details
remodel kitchen & bathrooms in 506, 507,508,509 new cabinets tile-lino & appliances\ | $28,000 |
| Mar 22, 2000 | Expired or cancelled expired Sep 2000 | 980 Bush St | On-Site Maintenance | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | |
| Mar 14, 2000 | Expired or cancelled expired Sep 2000 | 980 Bush St | On-Site Maintenance | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | |
| Feb 29, 2000 | Expired or cancelled expired Aug 2000 | 980 Bush St | On-Site Maintenance | remodel kitchen & bathroom upgrade electrical & plumbing to codeDetails
remodel kitchen & bathroom upgrade electrical & plumbing to code | $20,000 |
| Feb 28, 2000 | Expired or cancelled expired Feb 2001 | 980 Bush St | remodel bathroom & kitchen-upgrade electrical to code & plumbing, new cabinets, tileDetails
remodel bathroom & kitchen-upgrade electrical to code & plumbing, new cabinets, tile | $35,000 | |
| Jan 31, 2000 | Expired or cancelled expired Feb 2001 | 980 Bush St | work to create three units w/vaulted ceiling by entrance doorDetails
work to create three units w/vaulted ceiling by entrance door | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hon's Construction Inc. (12), On-Site Maintenance (10), Halyard Inc (6), Bkr Services Inc Dba Bkr Construction Se (2), Make Ready Maintenance Inc (2), 101 Roofing, Ac And Company, F B E And Sons General Const, J L Constrution Co., S & H Renovations
- Architects
- Chris Sullivan (11), Jacob Herczeg (3)
- Engineers
- Bernard Huang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.