Block 0872, lot 001
1912 Market St
- City’s use
- Multi-Family Residential
- Built
- 1931
- Stories
- 6
- Units
- 65
- Rooms
- 65 bathrooms
- Building
- 43,415 sq ft
- Lot
- 6,155 sq ft
- Zoning
- NC3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2024 | In progress filed Apr 2024, not yet issued | 1912 Market St | to comply with abe program. to comply with ansi/bhm a156.19 construct power door operator in lieu of level landing adjoining exterior and interior doors of existing building required to be made accessible to persons with disabilities.Details
to comply with abe program. to comply with ansi/bhm a156.19 construct power door operator in lieu of level landing adjoining exterior and interior doors of existing building required to be made accessible to persons with disabilities. | $20,500 | |
| Apr 5, 2023 | Completed final sign-off Jul 2023 | 1906 Market St | Cookline Construction Inc | e restaurant on gr fl change out equipment. revise front service counterDetails
e restaurant on gr fl change out equipment. revise front service counter | $15,000 |
| Mar 3, 2022 | Expired or cancelled cancelled Jan 2026 | 1900 Market St | S & H Renovations | rev to pa201907176173. change door swing only from outward to inward.Details
rev to pa201907176173. change door swing only from outward to inward. | |
| Jan 26, 2022 | Completed final sign-off Dec 2022 | 1906 Market St | Arrow Sign Company | billboard removal (from rooftop).Details
billboard removal (from rooftop). | $50,000 |
| Sep 28, 2021 | Never finaled filed Sep 2021, never issued | 15 Hermann St | legalize existing apartment unit 01. no work in unit 01.Details
legalize existing apartment unit 01. no work in unit 01. | $65,000 | |
| Dec 21, 2020 | Expired or cancelled cancelled Jan 2026 | 1906 Market St | "kantine" lettering on valance of awningDetails
"kantine" lettering on valance of awning | ||
| Dec 16, 2020 | Expired or cancelled cancelled Jan 2026 | 1906 Market St | 3 manually retractable awnings to be mounted over storefront windows. each awning is 9-10 ft long. distance from ground to bottomof awning not to exceed 7 ft. solid dark matte roler and restaurant name "kantine" printedDetails
3 manually retractable awnings to be mounted over storefront windows. each awning is 9-10 ft long. distance from ground to bottomof awning not to exceed 7 ft. solid dark matte roler and restaurant name "kantine" printed | $4,000 | |
| Jul 29, 2020 | Expired or cancelled cancelled Jan 2026 | 15 Hermann St | S & H Renovations | #205, 306, 503, 507, 510, 602, 607, 610: replacing fixtures, appliances, accessories, and finishes in 8 apartment units. fixtures to be replaced are bathroom toilet & sink, kitchen sink & faucet, light fixtures. bathrooms approx 6'x7' each. kitchens approx 8'x10' each. all work in kind.Details
#205, 306, 503, 507, 510, 602, 607, 610: replacing fixtures, appliances, accessories, and finishes in 8 apartment units. fixtures to be replaced are bathroom toilet & sink, kitchen sink & faucet, light fixtures. bathrooms approx 6'x7' each. kitchens approx 8'x10' each. all work in kind. | $160,000 |
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 15 Hermann St | street spaceDetails
street space | ||
| Feb 12, 2020 | Completed final sign-off Dec 2020 | 15 Hermann St | San Francisco Fire Protection | upgrade fire alarm system. new power supply, low frequency and modules and aes 7707Details
upgrade fire alarm system. new power supply, low frequency and modules and aes 7707 | $63,000 |
| Jan 15, 2020 | Expired or cancelled cancelled Jan 2026 | 15 Hermann St | renovation of (2) apartments - unit 503 on 6th level, unit 602 pm 7th level, new bedrooms, new kitchen cabinets & plumbing fixtures. new washer.dryet & fishwasher, new lighting at (e) j-boxes. no change to mech. no exterior work, fire alarm or sprinkler work, structural calc neededs.Details
renovation of (2) apartments - unit 503 on 6th level, unit 602 pm 7th level, new bedrooms, new kitchen cabinets & plumbing fixtures. new washer.dryet & fishwasher, new lighting at (e) j-boxes. no change to mech. no exterior work, fire alarm or sprinkler work, structural calc neededs. | $135,000 | |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 15 Hermann St | Grizzly Builders Inc. | street spaceDetails
street space | |
| Nov 26, 2019 | Never finaled issued Jan 2020, no final | 15 Hermann St | Grizzly Builders Inc. | renovation of (1) apartment unit 610 on 7th fl. new bedroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no exterior work, fire alarm or sprinkler work. no structural work.Details
renovation of (1) apartment unit 610 on 7th fl. new bedroom, new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no exterior work, fire alarm or sprinkler work. no structural work. | $65,000 |
| Nov 4, 2019 | Completed final sign-off Oct 2025 | 15 Hermann St | San Francisco Fire Protection | replacement insulation of fire alarm system. replace e control unit with new ifp 75 smoke detectors, pull station, new modulesDetails
replacement insulation of fire alarm system. replace e control unit with new ifp 75 smoke detectors, pull station, new modules | $11,500 |
| Oct 29, 2019 | Never finaled issued Oct 2019, no final | 15 Hermann St | street spaceDetails
street space | ||
| Sep 12, 2019 | Never finaled issued Oct 2019, no final | 15 Hermann St | reno of 1 apt, unit 202 on 3rd flr - new kitchen, bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structralDetails
reno of 1 apt, unit 202 on 3rd flr - new kitchen, bedroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structral | $65,000 | |
| Aug 15, 2019 | Expired or cancelled expired Sep 2024 | 15 Hermann St | Grizzly Builders Inc. | remodel units 1, 206, 301, 307 and 403. new kitcehn unit 001; new bedroom in units 301 & 403. new kitchen cabinets & plumbing fixtures. new washers/dryers and dishwashers. new lighting @ (e) j-box locations. no change to mechanical. no exterior to mechanical. no exterior, fire alarm, sprinkler orDetails
remodel units 1, 206, 301, 307 and 403. new kitcehn unit 001; new bedroom in units 301 & 403. new kitchen cabinets & plumbing fixtures. new washers/dryers and dishwashers. new lighting @ (e) j-box locations. no change to mechanical. no exterior to mechanical. no exterior, fire alarm, sprinkler or | $325,000 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 15 Hermann St | street spaceDetails
street space | ||
| Jul 24, 2019 | Completed final sign-off Feb 2020 | 1920 Market St | S & H Renovations | interior renovation of commercial unit 1920 market st. provide "white-box" for future tenant. (n) accessible restroom w/signage, (n) power door operator, (n) ada push plates. (n) existing signage. no structural work. no change to mechanical. no work in units above. project to comply w/nov 201925844Details
interior renovation of commercial unit 1920 market st. provide "white-box" for future tenant. (n) accessible restroom w/signage, (n) power door operator, (n) ada push plates. (n) existing signage. no structural work. no change to mechanical. no work in units above. project to comply w/nov 201925844 | $25,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2022 | 1900 Market St | S & H Renovations | to comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior and interior doors of (e) buildings required to be made accessbile for persons w/ disabilities. automatic doors to comply w/ ansi bhma a156.19Details
to comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior and interior doors of (e) buildings required to be made accessbile for persons w/ disabilities. automatic doors to comply w/ ansi bhma a156.19 | $8,000 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 15 Hermann St | street space onlyDetails
street space only | ||
| Apr 24, 2019 | Completed final sign-off Jan 2020 | 15 Hermann St | Grizzly Builders Inc. | demolition/construction of non-bearing partitions in units 101,105,209,303,305,308,401,406,506,509. alter wall in units 110,411. new kit cab/plumb fix/lgt @ (e) j-box locations. new dishwshrs, w/d except in 105,305,406,506; no change to mech, ext, fire, life safety or struct.Details
demolition/construction of non-bearing partitions in units 101,105,209,303,305,308,401,406,506,509. alter wall in units 110,411. new kit cab/plumb fix/lgt @ (e) j-box locations. new dishwshrs, w/d except in 105,305,406,506; no change to mech, ext, fire, life safety or struct. | $400,000 |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 15 Hermann St | Halyard Inc | exploratory demo at units 101,105,110,209,303,305,308,401,406,411,506,509, for structural evaluation demo not to exceed 50 sq ft @each unit, replace in kind.Details
exploratory demo at units 101,105,110,209,303,305,308,401,406,411,506,509, for structural evaluation demo not to exceed 50 sq ft @each unit, replace in kind. | $10,000 |
| Jun 1, 2018 | Completed final sign-off Jun 2018 | 1906 Market St | International Fire Equip | ul 300 fire system coverage for new kitchen equip. revision to pa# 201805239860Details
ul 300 fire system coverage for new kitchen equip. revision to pa# 201805239860 | $6,000 |
| May 23, 2018 | Completed final sign-off Jun 2018 | 1906 Market St | International Fire Equip | ref# 201702068753; install ul300 fire system. 2 cylindersDetails
ref# 201702068753; install ul300 fire system. 2 cylinders | $6,000 |
| Apr 17, 2018 | Expired or cancelled cancelled Nov 2022 | 15 Hermann St | relocation of electric service, new electrical panelDetails
relocation of electric service, new electrical panel | $40,000 | |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 1906 Market St | street space permitDetails
street space permit | ||
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 1906 Market St | street space/mta metersDetails
street space/mta meters | ||
| Jan 4, 2018 | Never finaled filed Jan 2018, never issued | 1906 Market St | streetspace permitDetails
streetspace permit | ||
| Feb 6, 2017 | Completed final sign-off Jun 2018 | 1906 Market St | Pacific Rim Design + Build | change of use/tenant improvement from laundromat to restaurant. demo of (e) laundromat, install (n) kitchen, dining, accessible restroom, (n) lighting, (n) front door, remove (e) exterior awning, no change to square footageDetails
change of use/tenant improvement from laundromat to restaurant. demo of (e) laundromat, install (n) kitchen, dining, accessible restroom, (n) lighting, (n) front door, remove (e) exterior awning, no change to square footage | $150,000 |
| Jun 13, 2012 | Completed final sign-off Jun 2012 | 1900 Market St | Rayco Development Solutions Inc | remove atm machine to comply with nov# 200790332Details
remove atm machine to comply with nov# 200790332 | $500 |
| Apr 5, 2012 | Completed final sign-off Jun 2012 | 1900 Market St | Universal Sign Company Inc | remove 1st of three existing 6 x 4 panel sign.Details
remove 1st of three existing 6 x 4 panel sign. | $600 |
| Apr 5, 2012 | Completed final sign-off Jun 2012 | 1900 Market St | Universal Sign Company Inc | remove 3rd of three existing 6 x 4 panel sign.Details
remove 3rd of three existing 6 x 4 panel sign. | $600 |
| Apr 5, 2012 | Completed final sign-off Jun 2012 | 1900 Market St | Universal Sign Company Inc | remove 2nd of three existing 6 x 4 panel sign.Details
remove 2nd of three existing 6 x 4 panel sign. | $600 |
| Jan 3, 2012 | Never finaled issued Feb 2012, no final | 15 Hermann St | voluntary removal of 20' x 60' genral advertising sign #6312 (orig 255).Details
voluntary removal of 20' x 60' genral advertising sign #6312 (orig 255). | $1,500 | |
| Nov 9, 2011 | Completed final sign-off Dec 2011 | 1920 Market St | Signs America Inc Dba Sign A Rama | comply with nov #201189092. remove two wall mounted signs & asociated electrical wiring.Details
comply with nov #201189092. remove two wall mounted signs & asociated electrical wiring. | $200 |
| Sep 5, 2007 | Expired or cancelled cancelled Dec 2012 | 1918 Market St | legalize existing atm. nov 200790332Details
legalize existing atm. nov 200790332 | $900 | |
| Aug 28, 2007 | Expired or cancelled cancelled Aug 2022 | 1918 Market St | legalize existing atm machine@ front property line per nov#200790332.Details
legalize existing atm machine@ front property line per nov#200790332. | $900 | |
| Jul 27, 2006 | Never finaled issued Jul 2006, no final | 15 Hermann St | California Constrution Co | reroofingDetails
reroofing | $20,000 |
| Mar 3, 2003 | Never finaled issued Apr 2003, no final | 1900 Market St | replace (e) non-accessible entry doors w/ new storefront door to mitigate n.o.v #200231493Details
replace (e) non-accessible entry doors w/ new storefront door to mitigate n.o.v #200231493 | $3,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grizzly Builders Inc. (4), S & H Renovations (4), Universal Sign Company Inc (3), International Fire Equip (2), San Francisco Fire Protection (2), Arrow Sign Company, California Constrution Co, Cookline Construction Inc, Halyard Inc, Pacific Rim Design + Build, Rayco Development Solutions Inc, Signs America Inc Dba Sign A Rama
- Architects
- Jacob Herczeg (9), Chris Sullivan (3)
- Engineers
- Michael Bennett
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.