Block 1007, lot 017
344 Presidio Ave
- City’s use
- Commercial Retail
- Built
- 1940
- Stories
- 1
- Units
- 1
- Rooms
- 5 bathrooms
- Building
- 3,480 sq ft
- Lot
- 3,492 sq ft
- Zoning
- SACTO
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2023 | Never finaled issued Oct 2023, no final | 344 Presidio Av | to comply with abe program: abe 201901174558. request technical infeasability-plans of street slope provided. change door handle.Details
to comply with abe program: abe 201901174558. request technical infeasability-plans of street slope provided. change door handle. | $800 | |
| Oct 2, 2023 | Never finaled issued Oct 2023, no final | 340 Presidio Av | to comply w/abe program, technical infeasibility, per ordinance 51-16, abe#201901174557. plans of slope & elevations providedDetails
to comply w/abe program, technical infeasibility, per ordinance 51-16, abe#201901174557. plans of slope & elevations provided | ||
| Nov 10, 2022 | Completed final sign-off Aug 2023 | 3296 Sacramento St | Ap- Build Inc | hvac system re-assign. architectural work under pa 2021-1215-4503 & 2022-0512-4170Details
hvac system re-assign. architectural work under pa 2021-1215-4503 & 2022-0512-4170 | $18,000 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 3296 Sacramento St | Ap- Build Inc | addition of staff kitchenette to (e) retail. no change to mechanical, no exterior changes. amend to pa 202112154503 for additional work.Details
addition of staff kitchenette to (e) retail. no change to mechanical, no exterior changes. amend to pa 202112154503 for additional work. | $10,000 |
| Dec 15, 2021 | Completed final sign-off Aug 2022 | 3296 Sacramento St | Ap- Build Inc | interior t.i - new partitions, new lighting, new casework, new sink, new bathroom sink, new finishes.Details
interior t.i - new partitions, new lighting, new casework, new sink, new bathroom sink, new finishes. | $110,000 |
| Feb 12, 2020 | Expired or cancelled cancelled Sep 2025 | 346 Presidio Av | in accordance with accessible building entrance program (ordinance 51-16) request technical infeasibilty install compliant door hardwre, threshold install warning stripe on exterior stair treadsDetails
in accordance with accessible building entrance program (ordinance 51-16) request technical infeasibilty install compliant door hardwre, threshold install warning stripe on exterior stair treads | $200 | |
| Jul 17, 2017 | Completed final sign-off Jul 2017 | 344 Presidio Av | Gray Industries Inc | install hardi plank over inside of 2 parapet wallsDetails
install hardi plank over inside of 2 parapet walls | $18,000 |
| Mar 10, 2016 | Completed final sign-off Apr 2016 | 340 Presidio Av | Zebra Awning Co Inc | fabricate and install 6 new awnings.Details
fabricate and install 6 new awnings. | $4,500 |
| Mar 10, 2016 | Completed final sign-off Apr 2016 | 340 Presidio Av | Zebra Awning Co Inc | non-structural sign painted on fabric.Details
non-structural sign painted on fabric. | $800 |
| Dec 8, 2015 | Never finaled issued Dec 2015, no final | 340 Presidio Av | street spaceDetails
street space | ||
| Nov 18, 2015 | Completed final sign-off Dec 2015 | 3296 Sacramento St | Zebra Awning Co Inc | fabricate & install 3 new fabric awningsDetails
fabricate & install 3 new fabric awnings | $5,200 |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 3296 Sacramento St | street spaceDetails
street space | ||
| Oct 9, 2015 | Completed final sign-off Jan 2016 | 340 Presidio Av | Moroso Construction Inc | electrical upgrade and associated demo, drywall, paintDetails
electrical upgrade and associated demo, drywall, paint | $25,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 3296 Sacramento St | street spaceDetails
street space | ||
| Jun 2, 2015 | Completed final sign-off Nov 2015 | 3296 Sacramento St | Moroso Construction Inc | revision to 2015 0507 5615 - due to sidewalk slope - installation of door operator at entryway.Details
revision to 2015 0507 5615 - due to sidewalk slope - installation of door operator at entryway. | $8,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 3296 Sacramento St | Moroso Construction Inc | ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall.Details
ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall. | $65,000 |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 3296 Sacramento St | Moroso Construction Inc | demo interior finishes. no structural work. soft demo only.Details
demo interior finishes. no structural work. soft demo only. | $4,000 |
| Apr 4, 2014 | Never finaled issued Apr 2014, no final | 344 Presidio Av | painted signage on front facade.Details
painted signage on front facade. | $850 | |
| Mar 20, 2014 | Completed final sign-off Apr 2014 | 344 Presidio Av | Master Roofing Systems Inc. | reroofingDetails
reroofing | $13,000 |
| Jan 28, 2014 | Completed final sign-off May 2014 | 344 Presidio Av | Moroso Construction Inc | tenant improvement. install electrical displays for new lighting, update kitchenette, related drywall and paint.Details
tenant improvement. install electrical displays for new lighting, update kitchenette, related drywall and paint. | $50,000 |
| Mar 27, 2013 | Completed final sign-off Apr 2013 | 3296 Sacramento St | Simplexgrinnell Lp. | as builts record drawings per inspector request. refer to pa# 2012-1026-2913.Details
as builts record drawings per inspector request. refer to pa# 2012-1026-2913. | |
| Oct 26, 2012 | Never finaled issued Oct 2012, no final | 3296 Sacramento St | Simplexgrinnell Lp. | on ground floor - replace existing non-functioning sprinkler monitoring system fire alarm panel & devices, like for like basis. install new pull station at panelDetails
on ground floor - replace existing non-functioning sprinkler monitoring system fire alarm panel & devices, like for like basis. install new pull station at panel | $3,500 |
| Aug 30, 2005 | Completed final sign-off Sep 2005 | 340 Presidio Av | Zebra Awning Co Inc | fabricate & install 2 triangle sheped awnings over joining store front of retail businessDetails
fabricate & install 2 triangle sheped awnings over joining store front of retail business | $2,500 |
| Aug 30, 2005 | Completed final sign-off Sep 2005 | 340 Presidio Av | Zebra Awning Co Inc | erect single faced non-electric projecting existing awningDetails
erect single faced non-electric projecting existing awning | |
| Aug 16, 2001 | Completed final sign-off Feb 2002 | 3296 Sacramento St | Collins Signs, Inc | erect an electric, single faced, wall signDetails
erect an electric, single faced, wall sign |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.