43 permits since 2000 (architect on 41 permits, designer on 1 permit, engineer on 1 permit): 30 completed, 3 in progress, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 801 38th Av | True Line Construction | revision to pa # 202602105599: delete new stairs & firewall. replace 2/f entry door w/ double hung window. steps from g/f deck to be 4' wide rather than full deck length stairs.Details
revision to pa # 202602105599: delete new stairs & firewall. replace 2/f entry door w/ double hung window. steps from g/f deck to be 4' wide rather than full deck length stairs. | |
| Feb 10, 2026 | In progress issued Feb 2026 | 801 38th Av | Scott & Warner Builders Inc | deck and stair: to replace a non code compliant stair from the upstairs level down to the back yard with a new code compliant stair. to repair the upper landing. in the lower level to move the entry and build a 5 foot wide landing.Details
deck and stair: to replace a non code compliant stair from the upstairs level down to the back yard with a new code compliant stair. to repair the upper landing. in the lower level to move the entry and build a 5 foot wide landing. | $10,000 |
| Mar 6, 2025 | In progress issued Jun 2025 | 38 Van Buren St | Proano Construction | horizontal addition 4 ft back, 1/2 width of property. kitchen & bath remodelDetails
horizontal addition 4 ft back, 1/2 width of property. kitchen & bath remodel | $80,000 |
| Apr 21, 2023 | Completed final sign-off Oct 2024 | 2628 Broderick St | Scott & Warner Builders Inc | revision to pa 2022-1116-6630 remove a windowDetails
revision to pa 2022-1116-6630 remove a window | $100 |
| Feb 15, 2023 | Completed final sign-off Apr 2023 | 1743 46th Av | Scott & Warner Builders Inc | to build a back yard fence 9'-11" tall.Details
to build a back yard fence 9'-11" tall. | $5,000 |
| Jan 12, 2023 | Completed final sign-off Nov 2024 | 2628 Broderick St | Scott & Warner Builders Inc | kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace.Details
kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace. | $50,000 |
| Oct 20, 2022 | Completed final sign-off Apr 2023 | 1743 46th Av | Scott & Warner Builders Inc | add 2 skylights total 14.5 sf glazingDetails
add 2 skylights total 14.5 sf glazing | $5,000 |
| Oct 5, 2022 | Completed final sign-off Jan 2023 | 130 Precita Av | Scott & Warner Builders Inc | to partition the garage for a parking space. to add storage under stairs & build ramp and platformDetails
to partition the garage for a parking space. to add storage under stairs & build ramp and platform | $5,000 |
| Apr 11, 2022 | Expired or cancelled expired May 2026 | 1226 De Haro St | Andrew Mark Construction Inc | to remove chiimney & remodel kitchen, new windows on front, (3) new one-hour rated property line windows, remodel lower floor, add bedroom w/in (e) foot print.Details
to remove chiimney & remodel kitchen, new windows on front, (3) new one-hour rated property line windows, remodel lower floor, add bedroom w/in (e) foot print. | $50,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2024 | 47 Jordan Av | Di Vine Construction | to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft.Details
to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft. | $20,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | create nook in (e) retaining wall for utility maters.Details
create nook in (e) retaining wall for utility maters. | $4,000 |
| Jun 9, 2020 | Completed final sign-off Jun 2022 | 3746 Jackson St | revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system.Details
revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system. | $15,000 | |
| Jul 22, 2019 | Never finaled filed Jul 2019, never issued | 3420 20th St | Terence Mcmahon Construction | replace rear wash porch & enclose the area below it. remove (e) exterior stairs & replace w/ (n) elevator. replace foundation, widen garage door. garage bay & to widen the 2nd floor bay. ** maher: n/a 3420 20th stDetails
replace rear wash porch & enclose the area below it. remove (e) exterior stairs & replace w/ (n) elevator. replace foundation, widen garage door. garage bay & to widen the 2nd floor bay. ** maher: n/a 3420 20th st | $20,000 |
| Jul 1, 2019 | Completed final sign-off Jan 2022 | 3746 Jackson St | Scott & Warner Builders Inc | replace windows and door in kind. revision to permit #201905201121.Details
replace windows and door in kind. revision to permit #201905201121. | |
| May 20, 2019 | Completed final sign-off Jan 2022 | 3746 Jackson St | Scott & Warner Builders Inc | replacement of windows and doors in-kind. no change to floor plansDetails
replacement of windows and doors in-kind. no change to floor plans | $5,000 |
| Aug 16, 2018 | Completed final sign-off Apr 2021 | 581 Waller St | Vonnegut Thoreau Construction | revision to pa# 201703080948-s2 to revise dormer back to original site permit configuration.Details
revision to pa# 201703080948-s2 to revise dormer back to original site permit configuration. | |
| Jul 10, 2018 | Expired or cancelled withdrawn Jul 2023 | 2174 20th Av | interior alterations to 2 units in a 2 story house. legalizations of 2nd unit under sep permit.Details
interior alterations to 2 units in a 2 story house. legalizations of 2nd unit under sep permit. | $100,000 | |
| Jan 16, 2018 | Completed final sign-off Feb 2019 | 340 Potrero Av | to replace one of the leaves of a double door with 2 windows in a single retail space. **n/a for maher**Details
to replace one of the leaves of a double door with 2 windows in a single retail space. **n/a for maher** | $200 | |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 2174 20th Av | Bernardini Construction | to comply w/nov #201789761, remove roof structure over front stairs. maher naDetails
to comply w/nov #201789761, remove roof structure over front stairs. maher na | $100 |
| Sep 19, 2017 | Never finaled issued Sep 2017, no final | 340 Potrero Av | Bernardini Construction | revision to 201708084163 to remove track lighting to change floor type to wood, add spec for filling penetrations in the rated slab.Details
revision to 201708084163 to remove track lighting to change floor type to wood, add spec for filling penetrations in the rated slab. | |
| Sep 19, 2017 | Completed final sign-off May 2018 | 340 Potrero Av | change of use from retail to an office space for an architect office. for administrative purpose only. tenant improvement conducted under bpa# 2017-0808-4163.Details
change of use from retail to an office space for an architect office. for administrative purpose only. tenant improvement conducted under bpa# 2017-0808-4163. | ||
| Sep 19, 2017 | Completed final sign-off Sep 2025 | 2174 20th Av | Zeus Construction Corp. | to legalize an existing illegal second unit per ordinance 43-14. to comply with nov #201791662. install new rear spiral stairs.Details
to legalize an existing illegal second unit per ordinance 43-14. to comply with nov #201791662. install new rear spiral stairs. | |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 340 Potrero Av | Bernardini Construction | tenant improvement for retail space #1, to include wiring and adding a sink. maher na.Details
tenant improvement for retail space #1, to include wiring and adding a sink. maher na. | $5,000 |
| Mar 8, 2017 | Completed final sign-off Apr 2021 | 581 Waller St | Vonnegut Thoreau Construction | a new dormer, set back 12'6" from front. repair facade, new windows, new front stair, new siding. 80 sq. 1 story addition horizontal. new deckDetails
a new dormer, set back 12'6" from front. repair facade, new windows, new front stair, new siding. 80 sq. 1 story addition horizontal. new deck | $100,000 |
| Nov 10, 2016 | Completed final sign-off Mar 2019 | 331 Vicente St | S F Garage Company Inc. | rooms down. to add a bedroom bathroom & deck to the existing garage space to replace rear windows w/sliding door in-kind.Details
rooms down. to add a bedroom bathroom & deck to the existing garage space to replace rear windows w/sliding door in-kind. | $20,000 |
| Mar 30, 2016 | Completed final sign-off Nov 2016 | 71 Parnassus Av | revision to pa 2016-0316-2136 and 2016-0115-7168, reflect inspector comments regarding reframed walls & doors for replacement wall in rear. to delete window, and reconfigure master closet and attic.Details
revision to pa 2016-0316-2136 and 2016-0115-7168, reflect inspector comments regarding reframed walls & doors for replacement wall in rear. to delete window, and reconfigure master closet and attic. | $2,000 | |
| Jan 15, 2016 | Completed final sign-off Nov 2016 | 71 Parnassus Av | interior remodel only: project includes remaining walls on grnd flr, adding a half bath, remodeling the kitchen,upstairs bathrm remodel & adding a 2nd upstairs bath. also includes new lighting, flooring & painting throughout.Details
interior remodel only: project includes remaining walls on grnd flr, adding a half bath, remodeling the kitchen,upstairs bathrm remodel & adding a 2nd upstairs bath. also includes new lighting, flooring & painting throughout. | $95,000 | |
| Jun 2, 2015 | Completed final sign-off Nov 2015 | 3296 Sacramento St | Moroso Construction Inc | revision to 2015 0507 5615 - due to sidewalk slope - installation of door operator at entryway.Details
revision to 2015 0507 5615 - due to sidewalk slope - installation of door operator at entryway. | $8,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 3296 Sacramento St | Moroso Construction Inc | ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall.Details
ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall. | $65,000 |
| Apr 8, 2015 | Expired or cancelled cancelled Jan 2026 | 973 Market St | for dph review only, addndum to pa#201412113535. n/a ordinance #155-13Details
for dph review only, addndum to pa#201412113535. n/a ordinance #155-13 | ||
| Dec 11, 2014 | Never finaled issued Mar 2015, no final | 973 Market St | Melo Willard Tabudlo Dba Dreamt Design | to create a barbershop with retail space. build an accessible restroomDetails
to create a barbershop with retail space. build an accessible restroom | $10,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2016 | 227 27th St | Altman & Co General Contractors | to remove a rear portion of (e) 2-story house. to add new 2-story addition with kitchen & master suite & new deck over living space.Details
to remove a rear portion of (e) 2-story house. to add new 2-story addition with kitchen & master suite & new deck over living space. | $150,000 |
| Apr 24, 2014 | Expired or cancelled withdrawn Nov 2014 | 414 Brannan St | ground floor t.i. - to relcoate a stair on an (e) mezzanine, to replace (e) shower with an ada accessible shower, to add lighting, to build non-bearing partitions. compliance with ordinance #155-13 not requiredDetails
ground floor t.i. - to relcoate a stair on an (e) mezzanine, to replace (e) shower with an ada accessible shower, to add lighting, to build non-bearing partitions. compliance with ordinance #155-13 not required | $30,000 | |
| Apr 16, 2014 | Expired or cancelled cancelled Jan 2026 | 3235 Gough St | to build a 481 sf roof deck.Details
to build a 481 sf roof deck. | $20,000 | |
| Dec 18, 2013 | Completed final sign-off Jul 2014 | 1880 Jackson St | Paul Ryan Associates | unit #603 - to remodel the kitchen & 3 bathrooms, replacing fixtures + finishes in kind, to add lighting. a new opening between kitchen and dining room wall. compliance with ordinance 155-13 not requiredDetails
unit #603 - to remodel the kitchen & 3 bathrooms, replacing fixtures + finishes in kind, to add lighting. a new opening between kitchen and dining room wall. compliance with ordinance 155-13 not required | $30,000 |
| Sep 10, 2010 | Completed final sign-off Dec 2011 | 179 Carl St | rear addition & kitchen remodel. new deck & new stairs in rear. bath remodel. new powder room.Details
rear addition & kitchen remodel. new deck & new stairs in rear. bath remodel. new powder room. | $100,000 | |
| May 21, 2010 | Completed final sign-off Jun 2010 | 40 Ringold St | revision to pa# 2009.02.02.1253. add non structural wall in basementDetails
revision to pa# 2009.02.02.1253. add non structural wall in basement | $1,500 | |
| Nov 24, 2009 | Completed final sign-off Jun 2010 | 62 Forest Side Av | Dahlgren Design And Build Inc | remodel and relocate kitchen, add half bath room on first/main floor. remove structure wall. legalize storage room and full bath room at ground floorDetails
remodel and relocate kitchen, add half bath room on first/main floor. remove structure wall. legalize storage room and full bath room at ground floor | $30,000 |
| Sep 21, 2009 | Completed final sign-off Nov 2009 | 1266 08th Av | Merchant Construction | comply w/ physical inspection report #cc5607 - update electrical & plumbing violations, to legalize a bathroom on the 4th floor of a second unit in a 2 unit bldg.Details
comply w/ physical inspection report #cc5607 - update electrical & plumbing violations, to legalize a bathroom on the 4th floor of a second unit in a 2 unit bldg. | $7,500 |
| May 5, 2009 | Completed final sign-off Jun 2010 | 40 Ringold St | to replace an existing loft storage space above the garage, ref. pa #200902021253 per plan.Details
to replace an existing loft storage space above the garage, ref. pa #200902021253 per plan. | $5,000 | |
| Feb 2, 2009 | Completed final sign-off Jun 2010 | 40 Ringold St | to comply w/n.o.v. #200881640 to repair damage to (e) roof & framing by fire, add guardrails to (e) decks & repair sheetrock, replace windows (22) & install 3 new skylights (flat) remodel bathrooms, upgrade 1 to an ada bathroom & upgrade handrails.Details
to comply w/n.o.v. #200881640 to repair damage to (e) roof & framing by fire, add guardrails to (e) decks & repair sheetrock, replace windows (22) & install 3 new skylights (flat) remodel bathrooms, upgrade 1 to an ada bathroom & upgrade handrails. | $80,000 | |
| Dec 18, 2007 | Never finaled issued Dec 2007, no final | 262 29th Av | underpinning of foundation along portion of south wall in response to south neighbor's excavation project.Details
underpinning of foundation along portion of south wall in response to south neighbor's excavation project. | $5,000 | |
| Aug 17, 2007 | Completed final sign-off Nov 2008 | 266 29th Av | horizontal addition to expand garage, 12'-0" from existing garage wall. this will allow 2 car parking in the garage. we are enclosing the area under an existing deck. a light well will be added to the front of the building and new window.Details