David G. Kallmeyer
- License
- C54247
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C54247 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Gfds Engineers
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Nov 2026
171 permits since 2000 (engineer on 159 permits, architect on 13 permits): 98 completed, 27 in progress, 22 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Van Acker Const Assoc Inc (9), Carroll Construction (6), Clayton Timbrell & Co (5), Moroso Construction Inc (5), Upscale Construction Inc. (4), B M D C Llc (3), Cairn Construction (3), Colindres & Associates (3), Dan Gillies Construction Services Inc (3), San Francisco Commercial Builders Inc (3), Scott & Warner Builders Inc (3), Bradford Construction (2), Cello & Maudru Construction Co Inc (2), D V Rasmussen & Son Inc. (2), Edgewood Builders Inc (2), Jeff King And Company Inc (2), Joseph Ward General Contractor (2), Mueller Nicholls Inc (2), Thompson Suskind L P (2), Trainor Commercial Construction Inc. (2), Two Bricks Design Build (2), Add A Garage Inc., Bbc Construction Inc., Brian Mac Namara Construction, Bryan Michelsen Construction, Centric Building Inc., Christopher Gate Construction Inc, Citywest Construction Inc., Cookline Construction Inc, Distinctive Designs Californias Remodeli, Dowbuilt Inc., E W Lum Construction Co, Excel Site Services Inc, K L Construction, Maven Maintenance Inc, Mcmullen Builders, Nolan Construction Inc, O'neill Construction, Osmun Construction, Plath & Company Inc, Rico's General Construction, S F Garage Company Inc., S L M Development Inc., Saturn Construction Co, Sidney Builders, Inc, Toolbox, Urrutia's Construction, Ventana 76
- Architects
- Benjamin Mcgriff (6), Kenneth Linsteadt (6), Steven Geiszler (6), Eliza Hart (3), John Clarke (3), Stephen Sutro (3), W Jason Alden (3), Aaron Eisenhart (2), Albert Costa (2), Daniel Widlowski (2), Kathleen Bost (2), Marissa Brandon (2), Nick Noyes (2), Paul A Molina (2), Ryan Francis Knock (2), Andrea Cochran, Brian Milford, Cass Smith, Christopher Roach, Clement Soga, Dale J Leda, Douglas Burnham, Emily Huang, Gregory Iboshi 1736 Stockton St, James Howard Westover, John Ike, Keith Plymale, Kenneth A. Linsteadt, Millard Theodore Pratt, Paul Haydu, Robert F. Tranter, Steven Besziler, Steven Geizler, William Duff
- Engineers
- Todd Joseph Frederick (2), Benjamin Lai, James R Gronek, Jason Powers, Joel Lurie, Ken Linsteadt, Shyam Kumar
- Authorized agents
- John Holmberg
- Pmt consultant/expediters
- Paul Molina
- Subcontractors
- Bill Brown, Marr Olsen
Most recent permits
Showing the 100 most recent of 171.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2026 | In progress filed Nov 2026, not yet issued | 3444 Washington St | Van Acker Const Assoc Inc | replacement of (e) doors/wdws and ext'r material in-kind where req'd.excavation for addtional basement sf, enclosure of (e) rear deck to create a new 2-story addition with access to the rear yard,(n) mechanical and electrical systems. various landscape improvements including new planting, terracesDetails
replacement of (e) doors/wdws and ext'r material in-kind where req'd.excavation for addtional basement sf, enclosure of (e) rear deck to create a new 2-story addition with access to the rear yard,(n) mechanical and electrical systems. various landscape improvements including new planting, terraces | $3,000,000 |
| Nov 2, 2026 | In progress filed Nov 2026, not yet issued | 2830 Pacific Av | interior remodel includes limited structural work. includes mep in-kind window replacement in frony, update window openings on sides and rear.Details
interior remodel includes limited structural work. includes mep in-kind window replacement in frony, update window openings on sides and rear. | $1,650,000 | |
| Oct 5, 2026 | In progress issued Oct 2026 | 101 Walnut St | Moroso Construction Inc | revision to pa 202511139490 includes revised t24 minor architectural changes @ 1st level; and minor structural revision to levels 1,2, and 3Details
revision to pa 202511139490 includes revised t24 minor architectural changes @ 1st level; and minor structural revision to levels 1,2, and 3 | |
| Aug 6, 2026 | In progress issued Sep 2026 | 4068 Cesar Chavez St | Distinctive Designs Californias Remodeli | revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof.Details
revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof. | |
| Aug 3, 2026 | In progress issued Aug 2026 | 3756 Jackson St | Clayton Timbrell & Co | to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress.Details
to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress. | $20,603 |
| Jul 27, 2026 | Completed final sign-off Oct 2026 | 838 Divisadero St | Cookline Construction Inc | fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.Details
fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures. | $250,000 |
| Jul 21, 2026 | In progress issued Aug 2026 | 2100 Pacific Av | Van Acker Const Assoc Inc | 10th fl: full interior remodel and reconfiguration of existing residential in high rise. includes non structural interior partitoins with updated finishes.Details
10th fl: full interior remodel and reconfiguration of existing residential in high rise. includes non structural interior partitoins with updated finishes. | $196,000 |
| Jun 11, 2026 | In progress issued Jul 2026 | 2101 Divisadero St | Mueller Nicholls Inc | top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows.Details
top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows. | $293,560 |
| May 15, 2026 | In progress issued Jun 2026 | 101 Walnut St | Add A Garage Inc. | revision to 202511139490. minor floor plan adjustments, revised elevator door configuration, and resulting structural updates.Details
revision to 202511139490. minor floor plan adjustments, revised elevator door configuration, and resulting structural updates. | $12,000 |
| May 12, 2026 | In progress issued Sep 2026 | 21 05th Av | Saturn Construction Co | horizontal addition and renovation of (e) residence. excavate 1/f and replace foundations as required.Details
horizontal addition and renovation of (e) residence. excavate 1/f and replace foundations as required. | $997,681 |
| Apr 27, 2026 | In progress issued Apr 2026 | 2934 Broderick St | Toolbox, K L Construction | 2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement.Details
2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement. | $79,000 |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 3145 Jackson St | revisiom to bpa:201810102850 s1-r1 - revise interior stair layout + elevator size, replace approved laundry with new bedroom/bath, remove approved spa, replace with laundry.Details
revisiom to bpa:201810102850 s1-r1 - revise interior stair layout + elevator size, replace approved laundry with new bedroom/bath, remove approved spa, replace with laundry. | $10,000 | |
| Mar 15, 2026 | In progress issued Sep 2026 | 51 Lopez Av | Carroll Construction | construct new exterior rear yard 2nd and 3rd floor balcony decks.Details
construct new exterior rear yard 2nd and 3rd floor balcony decks. | $35,000 |
| Mar 13, 2026 | Completed final sign-off Jun 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair.Details
basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair. | $127,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 3828 Jackson St | Plath & Company Inc | revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwellDetails
revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwell | $100,000 |
| Feb 11, 2026 | In progress issued Apr 2026 | 4068 Cesar Chavez St | Christopher Gate Construction Inc | remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof.Details
remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof. | $120,000 |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 39 06th Av | Sidney Builders, Inc | voluntary structural strengthening at attic and roof framing. adding window change to the front facade.Details
voluntary structural strengthening at attic and roof framing. adding window change to the front facade. | $25,000 |
| Dec 11, 2025 | In progress issued Apr 2026 | 101 Walnut St | Moroso Construction Inc | interior renovation. 1st flr excavation to expand (e) south wall. structural work (n) retaining walls and (n) 1st flr slab on grade. (n) mech equipment.Details
interior renovation. 1st flr excavation to expand (e) south wall. structural work (n) retaining walls and (n) 1st flr slab on grade. (n) mech equipment. | $900,000 |
| Nov 14, 2025 | In progress issued Jan 2026 | 461 Pacific Av | Two Bricks Design Build | exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/inclineDetails
exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/incline | $204,250 |
| Oct 8, 2025 | In progress issued Oct 2025 | 2799 Broadway | Van Acker Const Assoc Inc | revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprintDetails
revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprint | $48,000 |
| Sep 30, 2025 | In progress issued Nov 2025 | 2600 Green St | Colindres & Associates | revision to permit 202406204927 and 202409090314. relocate previously approved roofdeck. delete previously approved rollamatic retractable skylight and interior spiral stair.Details
revision to permit 202406204927 and 202409090314. relocate previously approved roofdeck. delete previously approved rollamatic retractable skylight and interior spiral stair. | |
| Sep 24, 2025 | In progress issued Sep 2026 | 655 Alvarado St | to document as built foundation & retaining walls,consistent with the scope of work shown under previously approved & issued (later canceled) plans including bpa#201711033047.Details
to document as built foundation & retaining walls,consistent with the scope of work shown under previously approved & issued (later canceled) plans including bpa#201711033047. | ||
| Aug 20, 2025 | In progress issued Oct 2026 | 2500 Pacific Av | Cello & Maudru Construction Co Inc | voluntary structural strenghthening of (e) building foundation, including new hand dug piers and grade beams.Details
voluntary structural strenghthening of (e) building foundation, including new hand dug piers and grade beams. | $100,000 |
| Aug 18, 2025 | In progress issued Jan 2026 | 16 Presidio Tr | Cairn Construction | int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced.Details
int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced. | $2,500,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | revision to 202502281303: modify shear wall layout on lower level and main levelDetails
revision to 202502281303: modify shear wall layout on lower level and main level | |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft.Details
entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft. | $210,000 |
| Jan 27, 2025 | In progress issued Feb 2025 | 3828 Jackson St | interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing.Details
interior modifications including kitchen, bathroom, and basement remodel, exterior modifications to extend lightwell and enlarge window openings at rear elevation and basement level, and replacement of existing skylight. inc. structural, electrical, mechanical, and plumbing. | $480,000 | |
| Dec 27, 2024 | Completed final sign-off Jun 2025 | 2799 Broadway | Van Acker Const Assoc Inc | revision 202411054446- waterproofing repair on (e) property line wall. ioncludes repalcement of (e) wood framed wall (12'wx10'h) with shotcrete and (n) membrance with drainage. ref 202412056269.Details
revision 202411054446- waterproofing repair on (e) property line wall. ioncludes repalcement of (e) wood framed wall (12'wx10'h) with shotcrete and (n) membrance with drainage. ref 202412056269. | |
| Oct 28, 2024 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | rev202102245264-(s1 r1) structural foundation updateDetails
rev202102245264-(s1 r1) structural foundation update | |
| Sep 27, 2024 | In progress issued Feb 2025 | 2600 Green St | Colindres & Associates | revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath.Details
revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath. | $923,500 |
| Aug 20, 2024 | Completed final sign-off Oct 2025 | 3075 Pacific Av | Upscale Construction Inc. | remodel to an (e) 2 story single family dwelling. project consists of an interior remodel of both floor levels, replacment of windows and exterior doors, new rear yard deck and landscaping.no increase of in bldg conditioned area,volume or size.Details
remodel to an (e) 2 story single family dwelling. project consists of an interior remodel of both floor levels, replacment of windows and exterior doors, new rear yard deck and landscaping.no increase of in bldg conditioned area,volume or size. | $200,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 45 Walnut St | Carroll Construction | 1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet toDetails
1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet to | $185,000 |
| Jul 26, 2024 | Completed final sign-off May 2025 | 3091 California St | Urrutia's Construction, S L M Development Inc. | unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned spaceDetails
unit 3-add in unit laundry. (1) bathrrom remodel. add (1) bathroom. (1) kitchen remodel. no new floor area or new conditioned space | $5,000 |
| Jul 18, 2024 | In progress issued Nov 2025 | 461 Pacific Av | Two Bricks Design Build, Bbc Construction Inc. | interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousureDetails
interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousure | $138,000 |
| Jun 26, 2024 | Completed final sign-off May 2025 | 870 Ashbury St | Ventana 76 | main level, recessed cans, remove & replace windows in family room. 2nd fl: redo hall bathroom shower & main bath floor & toilet. reproof deck & add tile. (n) recessed cans in 3 bedrooms. add (n) window to 1 bedroom.(n) hot water heater on 2nd fl. replace windows throughout. no work on 3rd fl.Details
main level, recessed cans, remove & replace windows in family room. 2nd fl: redo hall bathroom shower & main bath floor & toilet. reproof deck & add tile. (n) recessed cans in 3 bedrooms. add (n) window to 1 bedroom.(n) hot water heater on 2nd fl. replace windows throughout. no work on 3rd fl. | $250,000 |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 26 Commonwealth Av | Upscale Construction Inc. | dry rot repair in kitchen and kitchen nook.Details
dry rot repair in kitchen and kitchen nook. | $35,000 |
| Apr 4, 2024 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | ref 202102245264- upgrade to (e) grade beam, voluntary upgrade.Details
ref 202102245264- upgrade to (e) grade beam, voluntary upgrade. | $10,000 |
| Mar 8, 2024 | Expired or cancelled expired Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair.Details
revise pa#'s 202307061612 and 202312192794: to repair east property line windows, replace 3rd floor exterior door, add mechanical well at front yard and replace exterior service stair. | $80,000 |
| Feb 14, 2024 | Completed final sign-off Jun 2024 | 220 Montgomery St | San Francisco Commercial Builders Inc | revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1Details
revision to permit 202312212965. addition of side plate to base plate for detail 5/s4.2. corrected callouts on s2.1 | $1,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2024 | 220 Montgomery St | San Francisco Commercial Builders Inc | repair of corrosion damage to 2 existing steel columns at basement.Details
repair of corrosion damage to 2 existing steel columns at basement. | $10,000 |
| Oct 5, 2023 | In progress issued Dec 2024 | 24 Orben Pl | revision to 202212218915: add 200 sq ft heated space and 53 sq ft unheated to e basement at rear of property below grade. new conc stair at rear yardDetails
revision to 202212218915: add 200 sq ft heated space and 53 sq ft unheated to e basement at rear of property below grade. new conc stair at rear yard | $75,232 | |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 499 Jackson St | Trainor Commercial Construction Inc. | 5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit.Details
5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit. | $500,000 |
| Aug 3, 2023 | In progress issued May 2024 | 51 Lopez Av | Carroll Construction | 1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall.Details
1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall. | $15,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation.Details
rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation. | $400,000 |
| May 31, 2023 | Expired or cancelled cancelled Jan 2026 | 3501 Clay St | Thompson Suskind L P | revision to permit 202108045807. remove foundation work from proposed scope.Details
revision to permit 202108045807. remove foundation work from proposed scope. | |
| Apr 26, 2023 | Expired or cancelled cancelled Jan 2026 | 2509 Broadway | Citywest Construction Inc. | rear yard garden & landscape improvements. new retaining wall & stair; general repairs & upgrade to existing yard; new outdoor cooking fixtures; new fire pits (2); no work on residenceDetails
rear yard garden & landscape improvements. new retaining wall & stair; general repairs & upgrade to existing yard; new outdoor cooking fixtures; new fire pits (2); no work on residence | $187,940 |
| Apr 18, 2023 | Completed final sign-off Oct 2023 | 1138 Union St | B M D C Llc | rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remainDetails
rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remain | |
| Feb 1, 2023 | Completed final sign-off Aug 2024 | 1554 Masonic Av | Rico's General Construction | rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set)Details
rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set) | $10,000 |
| Jan 12, 2023 | Completed final sign-off Nov 2024 | 2628 Broderick St | Scott & Warner Builders Inc | kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace.Details
kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace. | $50,000 |
| Nov 29, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | Edgewood Builders Inc | revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852Details
revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852 | |
| Oct 31, 2022 | Expired or cancelled cancelled Jan 2026 | 231 24th Av | Osmun Construction | new foundation at side alley on 1st fl. new enlarged pantry on 2nd fl. kitchen cabinetry improvements on 2nd fl. no change on 3rd fl.Details
new foundation at side alley on 1st fl. new enlarged pantry on 2nd fl. kitchen cabinetry improvements on 2nd fl. no change on 3rd fl. | $23,273 |
| Oct 14, 2022 | Never finaled issued Mar 2023, no final | 11 Yerba Buena Av | O'neill Construction | remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rearDetails
remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rear | $90,000 |
| Sep 21, 2022 | Never finaled issued Nov 2023, no final | 490 Avila St | Dowbuilt Inc. | interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade.Details
interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade. | $1,500,000 |
| Aug 11, 2022 | Completed final sign-off May 2024 | 2505 Pacific Av | Colindres & Associates | swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower sDetails
swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower s | $100,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement.Details
ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement. | $350,000 |
| Jun 24, 2022 | Completed final sign-off Dec 2023 | 3421 Jackson St | Van Acker Const Assoc Inc | voluntary structural upgrade replacing (e) brink foundations, basement renovation, convert crawl space to (n) laundry room adding 124 sf. no exterior work or changesDetails
voluntary structural upgrade replacing (e) brink foundations, basement renovation, convert crawl space to (n) laundry room adding 124 sf. no exterior work or changes | $200,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2023 | 3466 21st St | Moroso Construction Inc | revision to 202011058337. add new exterior wall and gate at east side yardDetails
revision to 202011058337. add new exterior wall and gate at east side yard | |
| May 25, 2022 | In progress issued Apr 2024 | 3756 Jackson St | Clayton Timbrell & Co | renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes **Details
renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes ** | $1,200,000 |
| May 24, 2022 | Completed final sign-off Dec 2023 | 3421 Jackson St | Van Acker Const Assoc Inc | renovate 2nd floor. enlarge 1 rear yard facing window. replace 1 lightwell window.Details
renovate 2nd floor. enlarge 1 rear yard facing window. replace 1 lightwell window. | $250,000 |
| May 24, 2022 | Completed final sign-off Oct 2023 | 1136 Union St | B M D C Llc | interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142.Details
interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142. | $73,750 |
| May 19, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | Edgewood Builders Inc | revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details.Details
revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details. | $2,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2023 | 3500 Jackson St | Upscale Construction Inc. | rev to pa 201907166022 and 201912129405 to documetn structural rev required during course of construction.Details
rev to pa 201907166022 and 201912129405 to documetn structural rev required during course of construction. | |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 106 Presidio Av | Van Acker Const Assoc Inc | revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect.Details
revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect. | |
| Feb 16, 2022 | Never finaled issued Apr 2022, no final | 25 06th Av | Jeff King And Company Inc | revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1)Details
revise grading, utility, erosion control plans and foundation and 2nd floor framing plans for pa#201906274559 (s1) | |
| Feb 9, 2022 | Never finaled issued May 2023, no final | 51 Lopez Av | Carroll Construction | 1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind.Details
1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind. | $385,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2023 | 2511 Pacific Av | repair of existing permit front stairs & small modification of interior garage space.Details
repair of existing permit front stairs & small modification of interior garage space. | $75,000 | |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 2431 Filbert St | Bryan Michelsen Construction | hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019Details
hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019 | $20,000 |
| Nov 4, 2021 | Expired or cancelled expired Feb 2023 | 565 Belvedere St | D V Rasmussen & Son Inc. | new deck guardrails for an existing roof deck.Details
new deck guardrails for an existing roof deck. | $20,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures.Details
conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures. | $1,100,000 |
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 3838 Clay St | Cairn Construction | replacement of (e) failing retaining wall with new retaining wall.Details
replacement of (e) failing retaining wall with new retaining wall. | $35,000 |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 3501 Clay St | Thompson Suskind L P | interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area.Details
interior remodel, no exterior work. g/f: kitchen remodel and appliance relocations, wall between kitchen and living to be removed to make 1 combined family room area. | $112,500 |
| Jun 10, 2021 | Completed final sign-off Oct 2022 | 115 Jordan Av | Carroll Construction | remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/fDetails
remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/f | $42,000 |
| Jun 2, 2021 | Expired or cancelled cancelled Jan 2026 | 17 Landers St | seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level.Details
seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level. | $5,000 | |
| Apr 21, 2021 | Completed final sign-off Aug 2022 | 106 Presidio Av | Mcmullen Builders | to construct new 500 sq.ft roof deck. accessed by unit 106 onlyDetails
to construct new 500 sq.ft roof deck. accessed by unit 106 only | $85,000 |
| Apr 5, 2021 | Expired or cancelled withdrawn Jul 2021 | 200 Green St | Maven Maintenance Inc | addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris.Details
addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris. | $16,000 |
| Mar 24, 2021 | Never finaled issued Sep 2022, no final | 2825 Broadway | Brian Mac Namara Construction, Excel Site Services Inc | extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line.Details
extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line. | $50,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | create nook in (e) retaining wall for utility maters.Details
create nook in (e) retaining wall for utility maters. | $4,000 |
| Feb 24, 2021 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedrDetails
basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedr | $600,000 |
| Feb 12, 2021 | Never finaled issued May 2021, no final | 2221 Baker St | Clayton Timbrell & Co | limited interior remodel and structural work within existing building.Details
limited interior remodel and structural work within existing building. | $50,000 |
| Nov 20, 2020 | Completed final sign-off Jun 2022 | 3450 21st St | Moroso Construction Inc | underpin property line wall due to foundation work at 3466 21st street - pa 202011058337. approx 28 lf of underpinning.Details
underpin property line wall due to foundation work at 3466 21st street - pa 202011058337. approx 28 lf of underpinning. | |
| Nov 13, 2020 | Completed final sign-off Mar 2021 | 469 Vernon St | repair to rear foundation, including shoring and replacement of footings and concreteDetails
repair to rear foundation, including shoring and replacement of footings and concrete | $35,000 | |
| Nov 5, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design.Details
revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design. | $25,000 |
| Oct 14, 2020 | Completed final sign-off Dec 2021 | 1900 Pierce St | Jeff King And Company Inc | renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade.Details
renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade. | $600,000 |
| Sep 27, 2020 | Completed final sign-off Feb 2023 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | demo of (e) pedestriant gate and construction of a new pedestrian gate.Details
demo of (e) pedestriant gate and construction of a new pedestrian gate. | $10,000 |
| Sep 17, 2020 | Completed final sign-off Jun 2023 | 2108 Washington St | Mueller Nicholls Inc | replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exteriorDetails
replace (e) wood/steel windows/doors w/steel windows/doors. garage level: infaill of area below (e) bay window tower at north facade to increase coditionied floor area. remodel interior spaces to spa area w/bathroom, sauna, hot tub, cold plumbe. structural includes reconfiguration of rear exterior | $700,000 |
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 2324 Pacific Av | Upscale Construction Inc. | revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements.Details
revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements. | $1,000,000 |
| Aug 17, 2020 | Completed final sign-off Oct 2021 | 1658 48th Av | S F Garage Company Inc. | foundation repair and replacement in-kind.Details
foundation repair and replacement in-kind. | $10,000 |
| Jun 9, 2020 | Completed final sign-off Jun 2022 | 3746 Jackson St | revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system.Details
revision to pa 2019.0820.9378. to level off a ceiling in a room that faces a light well, to lower the floor on the ground floor by one riser, to replace areas of the foundation, various structural strengthening, and a new mechanical system. | $15,000 | |
| Mar 5, 2020 | Expired or cancelled withdrawn Oct 2020 | 71 Water St | E W Lum Construction Co | revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams.Details
revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams. | |
| Mar 3, 2020 | Completed final sign-off Jun 2020 | 2845 Union St | volunary seismic improvement - addition of connectors to existing interior posts & existing concrete spread footings, addition of concrete rat slab in existing crawl space/basement w.sub-slab drainage. enlarge access opening, stair repair.Details
volunary seismic improvement - addition of connectors to existing interior posts & existing concrete spread footings, addition of concrete rat slab in existing crawl space/basement w.sub-slab drainage. enlarge access opening, stair repair. | $50,000 | |
| Jan 31, 2020 | Expired or cancelled expired Feb 2023 | 565 Belvedere St | D V Rasmussen & Son Inc. | revision to pa 2018-0919-0766 minor foundation revision.Details
revision to pa 2018-0919-0766 minor foundation revision. | $100 |
| Jan 28, 2020 | Completed final sign-off Jun 2020 | 1402 Kearny St | B M D C Llc | voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed wallsDetails
voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed walls | $10,000 |
| Jan 14, 2020 | Completed final sign-off Oct 2022 | 115 Jordan Av | Carroll Construction | voluntary structural upgrade and to extend existing basement.Details
voluntary structural upgrade and to extend existing basement. | $30,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 2526 Broadway | Joseph Ward General Contractor | revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.Details
revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles. | $7,000 |
| Nov 27, 2019 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail.Details
to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail. | $30,000 |
| Nov 20, 2019 | Completed final sign-off Jan 2022 | 3838 Clay St | Cairn Construction, Nolan Construction Inc | to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade.Details
to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade. | $800,000 |
| Oct 30, 2019 | Completed final sign-off May 2020 | 56 Presidio Av | Centric Building Inc. | replace area of foundation at front tradesman entranceDetails
replace area of foundation at front tradesman entrance | $7,000 |
| Aug 26, 2019 | Completed final sign-off Aug 2020 | 395 Ewing Tr | revision to original pa #201906244193. adding framing plans at skylights & framing at new wall opening between kitchen and dining room.Details
revision to original pa #201906244193. adding framing plans at skylights & framing at new wall opening between kitchen and dining room. | ||
| Aug 1, 2019 | Completed final sign-off Feb 2021 | 2526 Broadway | Joseph Ward General Contractor | renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.Details
renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights. | $40,000 |
| Jul 24, 2019 | Completed final sign-off Oct 2020 | 147 Laidley St | Van Acker Const Assoc Inc | framing upgrade at (e) skylight opening. (n) framing to replace (e) insufficient roof framing members.Details
framing upgrade at (e) skylight opening. (n) framing to replace (e) insufficient roof framing members. | $2,500 |