Block 3544, lot 031
19 Landers St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 2
- Units
- 3
- Rooms
- 7 bedrooms, 6 bathrooms
- Building
- 3,514 sq ft
- Lot
- 3,123 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 19 Landers St | (2) bathroom cosmetic remodel: replace fixtures and finishes in kind in existing locations.Details
(2) bathroom cosmetic remodel: replace fixtures and finishes in kind in existing locations. | $30,000 | |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 15 Landers St | Ru Builders Inc | amend to pa202206035569: due to field conditions, add new perimeter foundation to replace (e) perimeter foundation fould to be in very poor condition.Details
amend to pa202206035569: due to field conditions, add new perimeter foundation to replace (e) perimeter foundation fould to be in very poor condition. | $30,000 |
| Jun 3, 2022 | Completed final sign-off Feb 2023 | 15 Landers St | Ru Builders Inc | removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls.Details
removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls. | $150,000 |
| Mar 1, 2022 | Completed final sign-off Apr 2022 | 17 Landers St | Gaxl General Construction Inc | 2nd story: powder room bathroom. new tile, new toilet, new fan, new occupancy sensor, replace vanity light, walking shower, new shower pan, new tile, new shower head and valve.Details
2nd story: powder room bathroom. new tile, new toilet, new fan, new occupancy sensor, replace vanity light, walking shower, new shower pan, new tile, new shower head and valve. | $8,900 |
| Feb 28, 2022 | Completed final sign-off Apr 2022 | 17 Landers St | Gaxl General Construction Inc | 1 bathroom remodel, walkin shower will be a tub all other bathroom appliances will remain in the same location in kind remodel.Details
1 bathroom remodel, walkin shower will be a tub all other bathroom appliances will remain in the same location in kind remodel. | $4,000 |
| Jun 2, 2021 | Expired or cancelled cancelled Jan 2026 | 17 Landers St | seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level.Details
seismic strengthening of an (e) building. new wood shearwalls & steel moment frames at basement level. | $5,000 | |
| Jan 15, 2020 | Completed final sign-off Jan 2020 | 15 Landers St | admin permit to correct address on bpa#201510149583 from 19 landers to 15 landers stDetails
admin permit to correct address on bpa#201510149583 from 19 landers to 15 landers st | ||
| Oct 22, 2018 | Never finaled filed Oct 2018, never issued | 19 Landers St | street spaceDetails
street space | ||
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 19 Landers St | Handy Construction Team Inc | kitchen remodel, including enlarging 2 interior openings, replacement of e gravity heat with new heat pump heating/cooling, installation of thermal insulation and attic vents. windows on a separate permitDetails
kitchen remodel, including enlarging 2 interior openings, replacement of e gravity heat with new heat pump heating/cooling, installation of thermal insulation and attic vents. windows on a separate permit | $60,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 19 Landers St | Handy Construction Team Inc | replace existing single paned wood and metal sash with new dual pane wood sash (10) some visible from street, same openings. max u-factor 0.32.Details
replace existing single paned wood and metal sash with new dual pane wood sash (10) some visible from street, same openings. max u-factor 0.32. | $15,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2016 | 19 Landers St | Excelsior Roofing Company | reroofingDetails
reroofing | $26,380 |
| Jan 22, 2008 | Completed final sign-off May 2008 | 19 Landers St | relocating some non load bearing. convert existing bath & storage into 2 full bathrooms on 3rd floor.Details
relocating some non load bearing. convert existing bath & storage into 2 full bathrooms on 3rd floor. | $17,500 | |
| Dec 21, 2007 | Completed final sign-off Nov 2009 | 15 Landers St | replacement of existing rear staircase with new stair.Details
replacement of existing rear staircase with new stair. | $40,000 | |
| Nov 19, 2004 | Completed final sign-off Dec 2004 | 19 Landers St | Excelsior Roofing Company | reroofingDetails
reroofing | $10,250 |
| Oct 18, 2004 | Completed final sign-off Mar 2005 | 17 Landers St | Daniel Larsen Builders | remodel ex.kitchen & 1 bath,remove/replace cabinets,flooring.no exterior work.except replace 4windowDetails
remodel ex.kitchen & 1 bath,remove/replace cabinets,flooring.no exterior work.except replace 4window | $65,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Excelsior Roofing Company (2), Gaxl General Construction Inc (2), Handy Construction Team Inc (2), Ru Builders Inc (2), Daniel Larsen Builders
- Architects
- Kenneth Martin (2), Jeffrey Graham
- Engineers
- David G. Kallmeyer, Sarah Leong, Sean Condry
- Designers
- Andy Menting
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.