E W Lum Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Apr 2026
- Last 24 months
- 2 permits filed
36 permits since 2000: 28 completed, 1 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2026 | Completed final sign-off Apr 2026 | 71 Water St | to obtain final inspection for work approved under pa# 202010247322, 201701268036, 202010035826.Details
to obtain final inspection for work approved under pa# 202010247322, 201701268036, 202010035826. | |
| Nov 5, 2025 | In progress filed Nov 2025, not yet issued | 433 Lombard St | legalization of unauthorized unit (unit 8- 433a lombard) as state adu. referance work proposed under seperate permit, which is to legalize unit 7 under the legalization program.Details
legalization of unauthorized unit (unit 8- 433a lombard) as state adu. referance work proposed under seperate permit, which is to legalize unit 7 under the legalization program. | $5,000 |
| Apr 22, 2024 | Completed final sign-off Apr 2024 | 2330 Taylor St | rev 201509227720- revise structural plan s2.0 to show hold downs in (n) concrete. no pull test needed.Details
rev 201509227720- revise structural plan s2.0 to show hold downs in (n) concrete. no pull test needed. | |
| Nov 17, 2023 | Completed final sign-off Nov 2024 | 148 18th Av | unit 101: remove and replace kitchn cabinets and counter tops permanetly install lighting to comply with cec-150(k) remodel bathroom remove and replace vanity and plumbing fixtures new tile on floor and shower. in kind remodel.Details
unit 101: remove and replace kitchn cabinets and counter tops permanetly install lighting to comply with cec-150(k) remodel bathroom remove and replace vanity and plumbing fixtures new tile on floor and shower. in kind remodel. | $25,000 |
| Nov 17, 2023 | Completed final sign-off Jul 2024 | 1362 Powell St | remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodelDetails
remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodel | $12,000 |
| Sep 19, 2022 | Completed final sign-off Sep 2023 | 2330 Taylor St | unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet.Details
unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet. | $15,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 785 Broadway | 2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind.Details
2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind. | $15,000 |
| Jun 9, 2021 | Completed final sign-off Sep 2022 | 785 Broadway | 3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan.Details
3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan. | $20,000 |
| Oct 24, 2020 | Expired or cancelled expired Apr 2026 | 71 Water St | revision to pa #2017-0126-8036: revise (e) structural plans to include (e) moment frame, structural and grade beams. remove proposed roof parapets, remove extra fire escape landing at roof. new walls at 1st floor for future adu.Details
revision to pa #2017-0126-8036: revise (e) structural plans to include (e) moment frame, structural and grade beams. remove proposed roof parapets, remove extra fire escape landing at roof. new walls at 1st floor for future adu. | |
| Oct 16, 2020 | Completed final sign-off Sep 2022 | 1362 Powell St | remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with newDetails
remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with new | $8,000 |
| Jul 6, 2020 | Completed final sign-off Oct 2020 | 1362 Powell St | remodel 3/f room #32: under cabinet refridgerator, microwave & cabinets.Details
remodel 3/f room #32: under cabinet refridgerator, microwave & cabinets. | $4,500 |
| May 19, 2020 | Completed final sign-off Jul 2020 | 371 Broadway | room 201. change broken window in lightwellin-kindDetails
room 201. change broken window in lightwellin-kind | $500 |
| Mar 6, 2020 | Completed final sign-off Oct 2020 | 1362 Powell St | remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroomDetails
remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroom | $15,000 |
| Mar 5, 2020 | Expired or cancelled withdrawn Oct 2020 | 71 Water St | revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams.Details
revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams. | |
| Nov 1, 2018 | Completed final sign-off Nov 2019 | 785 Broadway | new countertop & sinks in room 7,14,15, undercounter refregerators. nw outlets in rooms #7,14,15, microwave oven. new subpanels in rooms 7,14,15, add nw sink on 3rd floor hallway patch walls with nw drywall.Details
new countertop & sinks in room 7,14,15, undercounter refregerators. nw outlets in rooms #7,14,15, microwave oven. new subpanels in rooms 7,14,15, add nw sink on 3rd floor hallway patch walls with nw drywall. | $24,000 |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 1362 Powell St | renew existing permit for extension of permit #200305154765Details
renew existing permit for extension of permit #200305154765 | |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 51 Edgardo Pl | remodel existing kitchen and bath. new bath fan. paintingDetails
remodel existing kitchen and bath. new bath fan. painting | $18,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 1362 Powell St | remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher naDetails
remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher na | $20,000 |
| Apr 3, 2018 | Completed final sign-off Oct 2018 | 371 Broadway | remodel community kitchen in kind: 1 stove, new circuits, 1 hood. new floor drain. washer dryer hookup on 2nd floor. add new kitchenette to unit #312 on 4th floor. new 2 buyrner hot plate, hood, counter, sink, faucet, refrigerator and cabinets. minor electrical & plmg.Details
remodel community kitchen in kind: 1 stove, new circuits, 1 hood. new floor drain. washer dryer hookup on 2nd floor. add new kitchenette to unit #312 on 4th floor. new 2 buyrner hot plate, hood, counter, sink, faucet, refrigerator and cabinets. minor electrical & plmg. | $20,000 |
| Apr 3, 2018 | Expired or cancelled cancelled May 2025 | 3065 16th St | deferred submittal mechanical plan for building app#201610130138Details
deferred submittal mechanical plan for building app#201610130138 | $45,000 |
| Feb 14, 2018 | Expired or cancelled cancelled May 2025 | 3065 16th St | revision 201610130138 change to bar layout on basement level (food service drawings)Details
revision 201610130138 change to bar layout on basement level (food service drawings) | |
| Jan 10, 2018 | Completed final sign-off Apr 2026 | 71 Water St | add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a **Details
add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a ** | $100,000 |
| Dec 4, 2017 | Completed final sign-off Apr 2018 | 831 Sacramento St | unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen.Details
unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen. | $15,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | remodel at 3rd floor room 31: add a sink, electric cooktop, cabinets, hood minor electrical and plumbing work. change 2 windows, like for like new drywall. no reduction in the residential guestroom total of 25. n/a for maher.Details
remodel at 3rd floor room 31: add a sink, electric cooktop, cabinets, hood minor electrical and plumbing work. change 2 windows, like for like new drywall. no reduction in the residential guestroom total of 25. n/a for maher. | $6,000 |
| Sep 20, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | #4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinanceDetails
#4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinance | $20,000 |
| Sep 13, 2017 | Completed final sign-off Sep 2018 | 1530 Gough St | remove and replace 179 windows on exterior of building - replace with aluminum clad wood windows double hung. no alteration of 12 original wood windows on bush street facade. no other work.Details
remove and replace 179 windows on exterior of building - replace with aluminum clad wood windows double hung. no alteration of 12 original wood windows on bush street facade. no other work. | $135,000 |
| Jan 26, 2017 | Expired or cancelled expired Apr 2026 | 71 Water St | (e) bldg change of use/occupancy from offices to residential apartments. (n) emergency rescue stair & corridor at patio & first floor.Details
(e) bldg change of use/occupancy from offices to residential apartments. (n) emergency rescue stair & corridor at patio & first floor. | $200,000 |
| Nov 7, 2016 | Completed final sign-off Oct 2017 | 1350 Stockton St | revision to pa #201610251133 - install new plumbing & electricity in existing storage space for new stackable washer & dryers on 2n & 3rd floor. new drywall, isntall ductwork to outside lightwell. new exhaust fan & light.Details
revision to pa #201610251133 - install new plumbing & electricity in existing storage space for new stackable washer & dryers on 2n & 3rd floor. new drywall, isntall ductwork to outside lightwell. new exhaust fan & light. | $4,000 |
| Oct 25, 2016 | Completed final sign-off Oct 2017 | 1350 Stockton St | residential hotel-common shower room: remodel e shower room on 2nd flr- remove & replace 2 shower stalls with same, tile shower base & walls. remodel e shower room on 3rd flr - remove & replace 2 shower stalls with same, tile shower base & walls.Details
residential hotel-common shower room: remodel e shower room on 2nd flr- remove & replace 2 shower stalls with same, tile shower base & walls. remodel e shower room on 3rd flr - remove & replace 2 shower stalls with same, tile shower base & walls. | $20,000 |
| Oct 13, 2016 | Expired or cancelled cancelled May 2025 | 3065 16th St | change of use from b to a2. remodel (e)bar/restaurant,voluntary structural strengthening.add (n)exit passageway for second means of egress.replace & relocate (e)front door.(n)operable storefront glazing.remodel (e)bathrooms.replace (e)stairs to basement.lower bsmt fl by 1 ft.new bar at bsmt.Details
change of use from b to a2. remodel (e)bar/restaurant,voluntary structural strengthening.add (n)exit passageway for second means of egress.replace & relocate (e)front door.(n)operable storefront glazing.remodel (e)bathrooms.replace (e)stairs to basement.lower bsmt fl by 1 ft.new bar at bsmt. | $300,000 |
| Oct 3, 2016 | Completed final sign-off Dec 2016 | 371 Broadway | remodel 3 shower stalls/one on each floor, 2nd flr, 3rd flr, 4th flr. remove and replace tiled walls and shower floors with new tile, new shower pan. install new fans and lights. to comply with h.i.s. n.o.v. #201637321, 2016635311Details
remodel 3 shower stalls/one on each floor, 2nd flr, 3rd flr, 4th flr. remove and replace tiled walls and shower floors with new tile, new shower pan. install new fans and lights. to comply with h.i.s. n.o.v. #201637321, 2016635311 | $10,000 |
| May 3, 2016 | Completed final sign-off Oct 2016 | 1350 Stockton St | remodel existing shower room on 2nd flr, remove & replace 3 shower stalls with same, tile shower base and tile walls,new fans & lights.Details
remodel existing shower room on 2nd flr, remove & replace 3 shower stalls with same, tile shower base and tile walls,new fans & lights. | $10,000 |
| Apr 6, 2016 | Completed final sign-off Mar 2017 | 3065 16th St | remove brick oven in basement. remove chimney from roof down to basement. patch floor per existing frmaing to create firestop. leave existing walls in placeDetails
remove brick oven in basement. remove chimney from roof down to basement. patch floor per existing frmaing to create firestop. leave existing walls in place | $6,500 |
| Apr 1, 2016 | Completed final sign-off Oct 2016 | 1417 Broderick St | replace windows in front of building to be marvin aluminum clad wood interior. replace all others with same operation but vinyl windows located at the side of buildings. (4) on south, (2) on north; u value to be less than .4; replace in kind.Details
replace windows in front of building to be marvin aluminum clad wood interior. replace all others with same operation but vinyl windows located at the side of buildings. (4) on south, (2) on north; u value to be less than .4; replace in kind. | $3,000 |
| Mar 30, 2016 | Completed final sign-off Sep 2016 | 1417 Broderick St | remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation.Details
remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation. | $30,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2024 | 2330 Taylor St | installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |