Back to bathroom remodel contractors
E W Lum Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Apr 2026
- Last 24 months
- 2 permits filed
36 permits since 2000: 28 completed, 1 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off Nov 2024 | 148 18th Av | unit 101: remove and replace kitchn cabinets and counter tops permanetly install lighting to comply with cec-150(k) remodel bathroom remove and replace vanity and plumbing fixtures new tile on floor and shower. in kind remodel.Details
unit 101: remove and replace kitchn cabinets and counter tops permanetly install lighting to comply with cec-150(k) remodel bathroom remove and replace vanity and plumbing fixtures new tile on floor and shower. in kind remodel. | $25,000 |
| Nov 17, 2023 | Completed final sign-off Jul 2024 | 1362 Powell St | remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodelDetails
remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodel | $12,000 |
| Sep 19, 2022 | Completed final sign-off Sep 2023 | 2330 Taylor St | unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet.Details
unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet. | $15,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 785 Broadway | 2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind.Details
2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind. | $15,000 |
| Jun 9, 2021 | Completed final sign-off Sep 2022 | 785 Broadway | 3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan.Details
3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan. | $20,000 |
| Oct 16, 2020 | Completed final sign-off Sep 2022 | 1362 Powell St | remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with newDetails
remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with new | $8,000 |
| Mar 6, 2020 | Completed final sign-off Oct 2020 | 1362 Powell St | remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroomDetails
remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroom | $15,000 |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 51 Edgardo Pl | remodel existing kitchen and bath. new bath fan. paintingDetails
remodel existing kitchen and bath. new bath fan. painting | $18,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 1362 Powell St | remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher naDetails
remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher na | $20,000 |
| Dec 4, 2017 | Completed final sign-off Apr 2018 | 831 Sacramento St | unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen.Details
unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen. | $15,000 |
| Sep 20, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | #4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinanceDetails
#4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinance | $20,000 |
| Oct 13, 2016 | Expired or cancelled cancelled May 2025 | 3065 16th St | change of use from b to a2. remodel (e)bar/restaurant,voluntary structural strengthening.add (n)exit passageway for second means of egress.replace & relocate (e)front door.(n)operable storefront glazing.remodel (e)bathrooms.replace (e)stairs to basement.lower bsmt fl by 1 ft.new bar at bsmt.Details
change of use from b to a2. remodel (e)bar/restaurant,voluntary structural strengthening.add (n)exit passageway for second means of egress.replace & relocate (e)front door.(n)operable storefront glazing.remodel (e)bathrooms.replace (e)stairs to basement.lower bsmt fl by 1 ft.new bar at bsmt. | $300,000 |
| Mar 30, 2016 | Completed final sign-off Sep 2016 | 1417 Broderick St | remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation.Details
remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation. | $30,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2024 | 2330 Taylor St | installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |