Block 0160, lot 018
781 Broadway
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 3
- Units
- 21
- Rooms
- 3 bathrooms
- Building
- 5,066 sq ft
- Lot
- 2,126 sq ft
- Zoning
- CCB
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 785 Broadway | E W Lum Construction Co | 2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind.Details
2nd fl: remodel (e) bathroom. (e) toilet, shower, lavy. new drywall & tile walkin shower. new toilet & lavy. add new fan. 2nd floor bathroom in kind. | $15,000 |
| Jun 9, 2021 | Completed final sign-off Sep 2022 | 785 Broadway | E W Lum Construction Co | 3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan.Details
3/f: remodel (e) bathroom & toilet rooms, add (1) new shower, new drywall & tile work, new lighting & bathroom fan. | $20,000 |
| Dec 2, 2020 | Completed final sign-off May 2021 | 785 Broadway | International Fire Inc | like for like fire alarm upgrade with radio monitoring and low frequency soundersDetails
like for like fire alarm upgrade with radio monitoring and low frequency sounders | $12,000 |
| Nov 1, 2018 | Completed final sign-off Nov 2019 | 785 Broadway | E W Lum Construction Co | new countertop & sinks in room 7,14,15, undercounter refregerators. nw outlets in rooms #7,14,15, microwave oven. new subpanels in rooms 7,14,15, add nw sink on 3rd floor hallway patch walls with nw drywall.Details
new countertop & sinks in room 7,14,15, undercounter refregerators. nw outlets in rooms #7,14,15, microwave oven. new subpanels in rooms 7,14,15, add nw sink on 3rd floor hallway patch walls with nw drywall. | $24,000 |
| Jun 11, 2015 | Never finaled issued Jun 2015, no final | 785 Broadway | Marcos Leon Construction,Inc | reroofingDetails
reroofing | $10,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 781 Broadway | to comply with ordinance 029-13 only: installation of grab bars in sro at the following location: 1st fl 2 toilets & 1 shower; 2nd fl 2 toilets & 1 shower. total of 12 grab bars.Details
to comply with ordinance 029-13 only: installation of grab bars in sro at the following location: 1st fl 2 toilets & 1 shower; 2nd fl 2 toilets & 1 shower. total of 12 grab bars. | $300 | |
| Aug 27, 2010 | Never finaled issued Aug 2010, no final | 785 Broadway | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 6, 2005 | Expired or cancelled expired Aug 2006 | 785 Broadway | Metro Security Services | connect new sprinkler flow & valve stamper singnal to existing fire alarm system.Details
connect new sprinkler flow & valve stamper singnal to existing fire alarm system. | $2,000 |
| Jun 2, 2003 | Expired or cancelled expired May 2006 | 785 Broadway | Pacific Automatic Sprinkler | install a fire sprinkler system to protect the residential portion of the hotal to comply withDetails
install a fire sprinkler system to protect the residential portion of the hotal to comply with | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.