Block 0160, lot 017
1362 Powell St
- City’s use
- Commercial Hotel
- Built
- 1900
- Stories
- 3
- Units
- 32
- Rooms
- 7 bathrooms
- Building
- 11,325 sq ft
- Lot
- 3,835 sq ft
- Zoning
- CCB
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off Jul 2024 | 1362 Powell St | E W Lum Construction Co | remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodelDetails
remodel (e) bathroom on 2nd fl. add new fan & light, hand dryer and new circuit, retile shower and floors replace (e) plumbing fixtures with new. common use bathroom in kind remodel | $12,000 |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 787 Broadway | Maven Maintenance Inc | change of use from bar to art exhibit / retail. new ada restroom. new chair liftDetails
change of use from bar to art exhibit / retail. new ada restroom. new chair lift | |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 799 Broadway | Maven Maintenance Inc | change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wallDetails
change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wall | |
| Oct 17, 2023 | Expired or cancelled withdrawn Dec 2023 | 799 Broadway | to comply with accessible business entrance program/ordinange 51-16, upgrade (e) bathroom to be ada compliant, (n) interior ada door & push button (n) interior door. abe# 201902145255Details
to comply with accessible business entrance program/ordinange 51-16, upgrade (e) bathroom to be ada compliant, (n) interior ada door & push button (n) interior door. abe# 201902145255 | $20,000 | |
| Oct 17, 2023 | Expired or cancelled withdrawn Dec 2023 | 787 Broadway | to comply with accessible business entrance program/ordinance 51o-16, upgrade (e) bathroom to be ada compliant, (n) interior ada door & push button. abe# 201902145254Details
to comply with accessible business entrance program/ordinance 51o-16, upgrade (e) bathroom to be ada compliant, (n) interior ada door & push button. abe# 201902145254 | $22,000 | |
| Nov 13, 2020 | Never finaled issued Jun 2021, no final | 1362 Powell St | International Fire Inc | like for like fire alarm system upgrade with radio monitoring and low frequency sounders.Details
like for like fire alarm system upgrade with radio monitoring and low frequency sounders. | $15,200 |
| Oct 16, 2020 | Completed final sign-off Sep 2022 | 1362 Powell St | E W Lum Construction Co | remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with newDetails
remodel existing bathroom on 3rd floor. add new fan and light, hand dryer, and new circuit. retile shower and floors. replace existing plumbing fixtures with new | $8,000 |
| Jul 6, 2020 | Completed final sign-off Oct 2020 | 1362 Powell St | E W Lum Construction Co | remodel 3/f room #32: under cabinet refridgerator, microwave & cabinets.Details
remodel 3/f room #32: under cabinet refridgerator, microwave & cabinets. | $4,500 |
| Mar 6, 2020 | Completed final sign-off Oct 2020 | 1362 Powell St | E W Lum Construction Co | remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroomDetails
remodel at 2nd fl. romm #1 (n) undercounter refrigerator, microwave and cabinets, some electrical work, remodel at 3rd fl. bathroom, remodel (e) bathroom | $15,000 |
| Aug 2, 2019 | Never finaled issued Aug 2019, no final | 1350 Powell St | streetspaceDetails
streetspace | ||
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 1362 Powell St | E W Lum Construction Co | renew existing permit for extension of permit #200305154765Details
renew existing permit for extension of permit #200305154765 | |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 1362 Powell St | street spaceDetails
street space | ||
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 1362 Powell St | street spaceDetails
street space | ||
| May 30, 2018 | Never finaled issued May 2018, no final | 1362 Powell St | street spaceDetails
street space | ||
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 1362 Powell St | E W Lum Construction Co | remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher naDetails
remodel at 2nd floor units #10 & #13. unit #10: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. unit #13: (n) refrigerator, sink, and microwave oven, upgrade electrical & plumbing. (n) closet remodel (e) bathroom .maher na | $20,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 1350 Powell St | West Coast Premier Construction Inc | residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a4. soft story for commercial under pa 201804136257Details
residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a4. soft story for commercial under pa 201804136257 | $150,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 1350 Powell St | West Coast Premier Construction Inc | commercial - soft sotry seismic retrofit per sfebc chapter 4d engineering criteria appendix a-4. residential soft story under pa 201804136259Details
commercial - soft sotry seismic retrofit per sfebc chapter 4d engineering criteria appendix a-4. residential soft story under pa 201804136259 | $75,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | E W Lum Construction Co | remodel at 3rd floor room 31: add a sink, electric cooktop, cabinets, hood minor electrical and plumbing work. change 2 windows, like for like new drywall. no reduction in the residential guestroom total of 25. n/a for maher.Details
remodel at 3rd floor room 31: add a sink, electric cooktop, cabinets, hood minor electrical and plumbing work. change 2 windows, like for like new drywall. no reduction in the residential guestroom total of 25. n/a for maher. | $6,000 |
| Sep 20, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | E W Lum Construction Co | #4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinanceDetails
#4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinance | $20,000 |
| Mar 16, 2016 | Never finaled issued Mar 2016, no final | 1362 Powell St | street space and mtaDetails
street space and mta | ||
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 1362 Powell St | street space permitDetails
street space permit | ||
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 1362 Powell St | street spaceDetails
street space | ||
| Aug 31, 2015 | Never finaled issued Aug 2015, no final | 1362 Powell St | street space permitDetails
street space permit | ||
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 1362 Powell St | street space w/mtaDetails
street space w/mta | ||
| Dec 16, 2014 | Never finaled issued Jan 2015, no final | 1362 Powell St | J P F Construction, Marcos Leon Construction,Inc | comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind.Details
comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind. | $25,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 1350 Powell St | to comply with ordinance 029-13 only: installation of grab bars in sro at the following location: 1st & 2nd floors, 4 toilets, 4 showers, 250# (total of 16 bars).Details
to comply with ordinance 029-13 only: installation of grab bars in sro at the following location: 1st & 2nd floors, 4 toilets, 4 showers, 250# (total of 16 bars). | $400 | |
| Nov 3, 2006 | Completed final sign-off Nov 2006 | 787 Broadway | renew pa# 200510075089 for final inspection.Details
renew pa# 200510075089 for final inspection. | ||
| Oct 7, 2005 | Expired or cancelled expired May 2006 | 787 Broadway | occupant ;pad determination for a. 3 for fire assembly use permit.Details
occupant ;pad determination for a. 3 for fire assembly use permit. | ||
| Jun 6, 2005 | Never finaled issued Jun 2005, no final | 1362 Powell St | Metro Security Services | connect new sprinkler flow & valve tamper singals to existing fire alarm system & add central statioDetails
connect new sprinkler flow & valve tamper singals to existing fire alarm system & add central statio | $3,000 |
| Jun 25, 2004 | Never finaled issued Jun 2004, no final | 1350 Powell St | sidewalk repairDetails
sidewalk repair | ||
| May 15, 2003 | Expired or cancelled expired Jul 2018 | 1362 Powell St | Pacific Automatic Sprinkler | install fire sprinklers to protect the res. portion of the bldg on 2nd flr. 3rd flr & atticDetails
install fire sprinklers to protect the res. portion of the bldg on 2nd flr. 3rd flr & attic | $29,500 |
| Oct 29, 2001 | Expired or cancelled expired Feb 2002 | 1350 Powell St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.