Back to kitchen remodel contractors
E W Lum Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Apr 2026
- Last 24 months
- 2 permits filed
36 permits since 2000: 28 completed, 1 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2022 | Completed final sign-off Sep 2023 | 2330 Taylor St | unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet.Details
unit d: remodel existing kitchen. remove and replace existing cabinets and counter top. new appliances, new electrical subpanel and new circuits for kitchen , add new fan in bathroom and new electrical gfci outlet. | $15,000 |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 51 Edgardo Pl | remodel existing kitchen and bath. new bath fan. paintingDetails
remodel existing kitchen and bath. new bath fan. painting | $18,000 |
| Apr 3, 2018 | Completed final sign-off Oct 2018 | 371 Broadway | remodel community kitchen in kind: 1 stove, new circuits, 1 hood. new floor drain. washer dryer hookup on 2nd floor. add new kitchenette to unit #312 on 4th floor. new 2 buyrner hot plate, hood, counter, sink, faucet, refrigerator and cabinets. minor electrical & plmg.Details
remodel community kitchen in kind: 1 stove, new circuits, 1 hood. new floor drain. washer dryer hookup on 2nd floor. add new kitchenette to unit #312 on 4th floor. new 2 buyrner hot plate, hood, counter, sink, faucet, refrigerator and cabinets. minor electrical & plmg. | $20,000 |
| Dec 4, 2017 | Completed final sign-off Apr 2018 | 831 Sacramento St | unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen.Details
unit #48 kitchen& bath remodel no change in wall and openeing layout, remodel (e) kitchen in kind. remove and replace kitchen cabinets in kind. new countertop, new appliances, remodel one (e) bathroom. remove and replace (e) wall & floor tiles. replace bath fan. new electrical wiring in kitchen. | $15,000 |
| Sep 20, 2017 | Completed final sign-off Mar 2018 | 1362 Powell St | #4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinanceDetails
#4,7,9,12- comply w/nov #201787851, remodel 4 rooms, room #4 - new bathroom; room #7, #9 & #12 - new kitchenette. n/a maher ordinance | $20,000 |
| Mar 30, 2016 | Completed final sign-off Sep 2016 | 1417 Broderick St | remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation.Details
remodel kitchen & bathroom, new electrical work. install new drywall throughout, new insulation. | $30,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2024 | 2330 Taylor St | installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of 2 new units @ ground floor. for a total of 9 units. unit# 8 & unit# 9 to each have 1 bed, 1 bath, 1 kitchen. ** maher: compliance with ordinance no# 155-13 not required ** | $75,000 |