Block 3607, lot 020
3466 21st St
- City’s use
- Single Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 6,862 sq ft
- Lot
- 6,041 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2024 | Completed final sign-off Jun 2024 | 3466 21st St | American Solar Corporation | rev pa202203109743: addition of 6 battery only ac disconnects. rev due to utiity changes to ess interconnection requiresment with formaces us to install an additional handled disconnect per battery. all changes delta 12 01/17/2024.Details
rev pa202203109743: addition of 6 battery only ac disconnects. rev due to utiity changes to ess interconnection requiresment with formaces us to install an additional handled disconnect per battery. all changes delta 12 01/17/2024. | $11,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2023 | 3466 21st St | Moroso Construction Inc | revision to 202011058337. add new exterior wall and gate at east side yardDetails
revision to 202011058337. add new exterior wall and gate at east side yard | |
| Mar 10, 2022 | Completed final sign-off Oct 2022 | 3466 21st St | American Solar Corporation | installation of (6) tesla powerll 2.0. s/n: 3012170-xx-7 (84kwh total). requires building permit for battery ess. addition to (e) approved e/p e202107214515 for a solar pv system (plan 3572r-1). this cost is for batteries only, fees have been paid for solar permit. ref 202109249152.Details
installation of (6) tesla powerll 2.0. s/n: 3012170-xx-7 (84kwh total). requires building permit for battery ess. addition to (e) approved e/p e202107214515 for a solar pv system (plan 3572r-1). this cost is for batteries only, fees have been paid for solar permit. ref 202109249152. | $36,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2022 | 3466 21st St | Redwood City Alarms Inc | install (1) fire alarm system for dedicated heat detection, sprinkler supervisory & duct detection. ref#2021-0924-9152Details
install (1) fire alarm system for dedicated heat detection, sprinkler supervisory & duct detection. ref#2021-0924-9152 | $20,000 |
| Sep 24, 2021 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision to 202011058337. provide 2 closets for electrical storage system. ess batteries will be submitted under separate permitDetails
revision to 202011058337. provide 2 closets for electrical storage system. ess batteries will be submitted under separate permit | |
| Aug 27, 2021 | Completed final sign-off Oct 2022 | 3466 21st St | Control Fire Inc. | as-builts: fire sprinkler system: head locations and underground routing changed. adding coverage to tesla battery rooms at eh11. add 15 heads for a new system total of 119 heads. sprinkler monitoring/solar/battery storage under sep permits. ref 202012090667, 202002134346 and 201809119773.Details
as-builts: fire sprinkler system: head locations and underground routing changed. adding coverage to tesla battery rooms at eh11. add 15 heads for a new system total of 119 heads. sprinkler monitoring/solar/battery storage under sep permits. ref 202012090667, 202002134346 and 201809119773. | |
| Dec 9, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Control Fire Inc. | underground revisions. changes clouded & "delta 3" on plan.Details
underground revisions. changes clouded & "delta 3" on plan. | $78,400 |
| Nov 5, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design.Details
revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design. | $25,000 |
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 3466 21st St | street spaceDetails
street space | ||
| Feb 26, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision to pa# 2018-0911-9773 s4. remove rear stair off terrace. add bay volume to 2nd flr on terrace. lower west side yard grade . modify entry stair. window and door changes. **to comply w/ maher ord# 155-13, route to dph**Details
revision to pa# 2018-0911-9773 s4. remove rear stair off terrace. add bay volume to 2nd flr on terrace. lower west side yard grade . modify entry stair. window and door changes. **to comply w/ maher ord# 155-13, route to dph** | $33,500 |
| Feb 13, 2020 | Completed final sign-off Oct 2022 | 3466 21st St | Control Fire Inc. | installation of overhead fire protection spriknler ysstme including 4in u/g water fire service. ref pa201809119773.Details
installation of overhead fire protection spriknler ysstme including 4in u/g water fire service. ref pa201809119773. | $56,215 |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 3466 21st St | street spaceDetails
street space | ||
| Oct 17, 2019 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | rev to pa# 201809119773 to include civil sheets and an updated shoring planDetails
rev to pa# 201809119773 to include civil sheets and an updated shoring plan | |
| Sep 11, 2018 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | renovate (e) house, excavate for a fully below-grade basement, reduce size of (e) 1976 rear addition, modify (e) windows and doors. **comply w/ maher, route to dph**Details
renovate (e) house, excavate for a fully below-grade basement, reduce size of (e) 1976 rear addition, modify (e) windows and doors. **comply w/ maher, route to dph** | $3,600,000 |
| Jul 17, 2013 | Completed final sign-off Oct 2013 | 3466 21st St | Phollies Inc | remodel existing kitchen, remove walls & install new steel beams per plan, upgrade plumbing, electrical to current code, new cabinets & appliances.Details
remodel existing kitchen, remove walls & install new steel beams per plan, upgrade plumbing, electrical to current code, new cabinets & appliances. | $60,000 |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 3466 21st St | street space permitDetails
street space permit | ||
| Jan 11, 2008 | Never finaled issued Jan 2008, no final | 3466 21st St | street spaceDetails
street space | ||
| Feb 6, 2004 | Completed final sign-off Mar 2005 | 3466 21st St | relocate laundry room, new powder room, bar area on basement, no structural changes. all work to nonDetails
relocate laundry room, new powder room, bar area on basement, no structural changes. all work to non | $50,000 | |
| Jul 21, 2003 | Completed final sign-off Nov 2003 | 3466 21st St | rnew expired permits 200002081319 & 200004036227 & 200208053153Details
rnew expired permits 200002081319 & 200004036227 & 200208053153 | ||
| Jul 21, 2003 | Completed final sign-off Nov 2003 | 3466 21st St | rework two existing bathrooms, see drawings enclosedDetails
rework two existing bathrooms, see drawings enclosed | $20,000 | |
| Jul 21, 2003 | Completed final sign-off Nov 2003 | 3466 21st St | renew app 200208053150Details
renew app 200208053150 | $5,000 | |
| Aug 5, 2002 | Expired or cancelled expired Dec 2002 | 3466 21st St | renew app#200004036227Details
renew app#200004036227 | ||
| Aug 5, 2002 | Completed final sign-off Nov 2003 | 3466 21st St | revision to app #200004036227/modifiy bthrm new owners specificationDetails
revision to app #200004036227/modifiy bthrm new owners specification | $20,000 | |
| Apr 3, 2000 | Expired or cancelled expired Apr 2001 | 3466 21st St | kitchen & bath remodelDetails
kitchen & bath remodel | $200,000 | |
| Feb 8, 2000 | Expired or cancelled expired Feb 2001 | 3466 21st St | Baywol************Not Valid Cont Lic**** | remodel kitchen and bathroomDetails
remodel kitchen and bathroom |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.