B M D C Llc
- Based in
- Sausalito
- On San Francisco permits
- Aug 2019 to Sep 2023
- Last 24 months
- 0 permits filed
36 permits since 2000: 28 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2023 | Completed final sign-off Jan 2024 | 1421 Hyde St | voluntary lateral strengthening at 1st floor. shearwalls in transverse direction and anchor bolts in longitutinal direction. lateral strengthening does not qualify for unlimited adus.Details
voluntary lateral strengthening at 1st floor. shearwalls in transverse direction and anchor bolts in longitutinal direction. lateral strengthening does not qualify for unlimited adus. | $60,000 |
| Aug 23, 2023 | Completed final sign-off Nov 2023 | 1421 Hyde St | unit# 3: kitchen and bath remodel in kind - one shower pan. no structural work. no framing modification.Details
unit# 3: kitchen and bath remodel in kind - one shower pan. no structural work. no framing modification. | $20,000 |
| May 18, 2023 | Completed final sign-off Jul 2023 | 1136 Union St | new heat pump & pad on roofDetails
new heat pump & pad on roof | $11,750 |
| Apr 26, 2023 | Completed final sign-off Jul 2023 | 1138 Union St | install eight new vinyl windows to replace faccing windows in lightwell and tradesman alley. same operation and opening size, same size, same location, not visible from street, max u-factor 0.30.Details
install eight new vinyl windows to replace faccing windows in lightwell and tradesman alley. same operation and opening size, same size, same location, not visible from street, max u-factor 0.30. | $1,000 |
| Apr 18, 2023 | Completed final sign-off Oct 2023 | 1138 Union St | rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remainDetails
rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remain | |
| Apr 6, 2023 | Never finaled issued Apr 2023, no final | 1342 Mason St | structural alteration per adu project under 202105100075. structural alteration to 2nd fl framing. notch joiste to increase ceiling height of unit 1342c near gridline a. new landing and concrete steps. new wall footing and load bearing shearwall along grid 4Details
structural alteration per adu project under 202105100075. structural alteration to 2nd fl framing. notch joiste to increase ceiling height of unit 1342c near gridline a. new landing and concrete steps. new wall footing and load bearing shearwall along grid 4 | $15,000 |
| Apr 5, 2023 | Completed final sign-off Apr 2023 | 1142 Union St | unit 1142: to obtain final inspection for work approved under bpa#202112104176. all work is complete.Details
unit 1142: to obtain final inspection for work approved under bpa#202112104176. all work is complete. | |
| Apr 5, 2023 | Completed final sign-off May 2023 | 1342 Mason St | unit# a: new sheetrock and finishes throught one bedroom unit, install 5 new windows in lightwells, same opening size and type.Details
unit# a: new sheetrock and finishes throught one bedroom unit, install 5 new windows in lightwells, same opening size and type. | |
| Jan 17, 2023 | Completed final sign-off May 2023 | 1342 Mason St | unit # a: in kind kitchen and bath remodel.Details
unit # a: in kind kitchen and bath remodel. | $25,000 |
| Sep 26, 2022 | Completed final sign-off Jul 2023 | 1136 Union St | structural revision to bpa#202112104146 & 2022112204732. adjust shear wall locations @ first floor due to field conditions & footings.Details
structural revision to bpa#202112104146 & 2022112204732. adjust shear wall locations @ first floor due to field conditions & footings. | |
| Sep 8, 2022 | Completed final sign-off Dec 2022 | 1332 California St | unit #2: one kitchen remodel in kind, fixtures in same place. new cabinets, counters. one bath remodel in kind, new vanity, bathtub, tile.Details
unit #2: one kitchen remodel in kind, fixtures in same place. new cabinets, counters. one bath remodel in kind, new vanity, bathtub, tile. | $10,000 |
| May 24, 2022 | Completed final sign-off Oct 2023 | 1136 Union St | interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142.Details
interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142. | $73,750 |
| Dec 20, 2021 | Completed final sign-off Jan 2023 | 1136 Union St | kitchen and bath remodel unit# 1136. (n) electrical. (n) plumbing. no exterior work.Details
kitchen and bath remodel unit# 1136. (n) electrical. (n) plumbing. no exterior work. | $45,000 |
| Dec 16, 2021 | Completed final sign-off May 2022 | 2028 Scott St | unit #102: remodel kitchen and bath in kind. no wall layout change. no structural work - no framing modificationDetails
unit #102: remodel kitchen and bath in kind. no wall layout change. no structural work - no framing modification | $30,000 |
| Dec 16, 2021 | Completed final sign-off May 2022 | 2028 Scott St | unit #204: remodel kitchen and bath in kind. no wall layout change. no structural work - no framing modificationDetails
unit #204: remodel kitchen and bath in kind. no wall layout change. no structural work - no framing modification | $30,000 |
| Dec 10, 2021 | Expired or cancelled expired Apr 2023 | 1142 Union St | remodel kitchen & bathoom. new electrical & plumbing. ste 1142Details
remodel kitchen & bathoom. new electrical & plumbing. ste 1142 | $30,000 |
| Dec 1, 2021 | Expired or cancelled cancelled Jun 2022 | 1138 Union St | remodel bath in-kind, new fixtures, same location. tiles, no wall layout changes.Details
remodel bath in-kind, new fixtures, same location. tiles, no wall layout changes. | $10,000 |
| May 10, 2021 | Never finaled issued Mar 2023, no final | 1342 Mason St | addition of one (1) accessory dwelling unit (adu), per state law, to an existing seven (7) unit building; total of 8 units. the proposed adu will be located within existing building envelope at the ground floor.Details
addition of one (1) accessory dwelling unit (adu), per state law, to an existing seven (7) unit building; total of 8 units. the proposed adu will be located within existing building envelope at the ground floor. | $70,000 |
| Apr 26, 2021 | Completed final sign-off Jun 2021 | 1251 Green St | replace (e) non-street facing shower stall windows w/ same size tempered filar glass. one window in 1251 and one window in 1253.Details
replace (e) non-street facing shower stall windows w/ same size tempered filar glass. one window in 1251 and one window in 1253. | $1,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 1925 Pierce St | in kind one kitchen and one bath remodel. no change in walls. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5Details
in kind one kitchen and one bath remodel. no change in walls. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)5 | $25,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2021 | 1253 Green St | in-kind bathroom remodel, replace kitchen cabinets. no layout changes; no wall demo.Details
in-kind bathroom remodel, replace kitchen cabinets. no layout changes; no wall demo. | $25,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2021 | 1251 Green St | in-kind bathroom remodel, replace kitchen cabinets. no layout changes; no wall demo.Details
in-kind bathroom remodel, replace kitchen cabinets. no layout changes; no wall demo. | $25,000 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 2028 Scott St | in kind kitchen and bath remodelDetails
in kind kitchen and bath remodel | $25,000 |
| Jan 13, 2021 | Completed final sign-off May 2021 | 2028 Scott St | unit 201 in kind kitchen and bath remodelDetails
unit 201 in kind kitchen and bath remodel | $38,000 |
| Jan 13, 2021 | Never finaled issued May 2021, no final | 411 Columbus Av | rev to pa201910114322: replace wood framing with new concrete slab in the first floor.Details
rev to pa201910114322: replace wood framing with new concrete slab in the first floor. | |
| Jan 13, 2021 | Completed final sign-off May 2021 | 2028 Scott St | unit 302 in kind kitchen and bath remodelDetails
unit 302 in kind kitchen and bath remodel | $38,000 |
| Jan 11, 2021 | Completed final sign-off May 2021 | 2028 Scott St | unit #103: in kind kitchen and bath remodelDetails
unit #103: in kind kitchen and bath remodel | $20,000 |
| Jan 11, 2021 | Completed final sign-off May 2022 | 2028 Scott St | unit #104: in kind kitchen and bath remodelDetails
unit #104: in kind kitchen and bath remodel | $20,000 |
| Dec 23, 2020 | Expired or cancelled cancelled Jan 2026 | 610 Irving St | to comply with accessible business entrance program per ordinance 51-16. upgrade commercial entrance to ada compliance.Details
to comply with accessible business entrance program per ordinance 51-16. upgrade commercial entrance to ada compliance. | $4,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2021 | 1115 Polk St | new kitchen cabinets and counter si in kind. electrical upgrade in unit unit 38 onlyDetails
new kitchen cabinets and counter si in kind. electrical upgrade in unit unit 38 only | $25,000 |
| Nov 6, 2020 | Completed final sign-off Jun 2021 | 569 Minna St | unit 569a, 2nd flr: remodel/relocate kitchen. add new bathroom and closet. upgrade unit electrical. remove non-structural partition wall between kitchen and living room.Details
unit 569a, 2nd flr: remodel/relocate kitchen. add new bathroom and closet. upgrade unit electrical. remove non-structural partition wall between kitchen and living room. | $25,000 |
| Jun 5, 2020 | Completed final sign-off Aug 2020 | 1434 Stockton St | studio unit, remodel of existing kitchen and bath in kind. use same plumbing vents. new high high efficacy lights throughout.Details
studio unit, remodel of existing kitchen and bath in kind. use same plumbing vents. new high high efficacy lights throughout. | $15,000 |
| Jan 28, 2020 | Completed final sign-off Jun 2020 | 1402 Kearny St | voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed wallsDetails
voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed walls | $10,000 |
| Jan 6, 2020 | Completed final sign-off Mar 2022 | 1251 Green St | per ordinance #43-14, legalize dwelling unit installed without a permit on ground flr; studio unit with a bath and a kitchen.Details
per ordinance #43-14, legalize dwelling unit installed without a permit on ground flr; studio unit with a bath and a kitchen. | $5,000 |
| Oct 11, 2019 | Never finaled issued Jun 2020, no final | 411 Columbus Av | replace new concrete footings and floor on the 1st flDetails
replace new concrete footings and floor on the 1st fl | $40,000 |
| Aug 5, 2019 | Never finaled issued Sep 2019, no final | 411 Columbus Av | remodel (e) restroom on the main level, to convert into a handicap restroom. no exterior work.Details
remodel (e) restroom on the main level, to convert into a handicap restroom. no exterior work. | $30,000 |