Paul Molina
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Molina & Timmins Architect
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Sep 2026
65 permits since 2000 (architect on 55 permits, authorized agent-others on 11 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 31 completed, 16 in progress, 5 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 254 08th Av | create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab.Details
create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab. | $35,000 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 4370 Cesar Chavez St | D3 Construction | revisiom to permit 202607144991. reduce proposed rear yard fence height from 10' to 8'.Details
revisiom to permit 202607144991. reduce proposed rear yard fence height from 10' to 8'. | |
| Sep 4, 2026 | In progress issued Sep 2026 | 155 Lower Tr | Fahan Construction Inc | revision to pa#202604089079. widening of the hallway on the 1st fl. revision to footing in basement/crawl space. bathroom + closet modifications in guest bedroom level.Details
revision to pa#202604089079. widening of the hallway on the 1st fl. revision to footing in basement/crawl space. bathroom + closet modifications in guest bedroom level. | $20,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1127 Hampshire St | D3 Construction | excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard.Details
excavate existing 1st fl add 2 new bedrooms and 2 new baths, new stair to existing upper fl. new sitting room, new bake storage and mech room. 2nd fl add new deck,new stair down to rear yard. | $450,000 |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 607 06th Av | D3 Construction | addressing complaint#202657441. remodel of (e) powder room. replace in kind (e) wood deck + stairs to back yard. (n) 7' tall fence on 3 sides of rear yard. (n) glass railing @ front deck + stair.Details
addressing complaint#202657441. remodel of (e) powder room. replace in kind (e) wood deck + stairs to back yard. (n) 7' tall fence on 3 sides of rear yard. (n) glass railing @ front deck + stair. | $65,000 |
| Aug 9, 2026 | In progress filed Aug 2026, not yet issued | 2061 Mission St | priority:13-01: legalize unit 35 through the state adu round table process. reconfiguration of units 19,33 & 34Details
priority:13-01: legalize unit 35 through the state adu round table process. reconfiguration of units 19,33 & 34 | $200,000 | |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 2911 16th St | D & H Construction | ed 13-01. 100% affortable housing via mohcd. convert 3 (e) guest rooms into 3 adus.Details
ed 13-01. 100% affortable housing via mohcd. convert 3 (e) guest rooms into 3 adus. | $20,000 |
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 163 Alhambra St | revision of permit#202502079869. addition of one new bathroom and offic, plans for the remodel the existing kitchen and bathroom which was part of the permit mentioned above.Details
revision of permit#202502079869. addition of one new bathroom and offic, plans for the remodel the existing kitchen and bathroom which was part of the permit mentioned above. | $50,000 | |
| Jul 14, 2026 | In progress issued Aug 2026 | 4370 Cesar Chavez St | D3 Construction | reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sectionsDetails
reference to complaint 202654497: rear yard fence tall than 6' regrading of back yard per allowed 30" and 36" vertical sections | $20,000 |
| Jun 11, 2026 | In progress issued Jul 2026 | 607 06th Av | D3 Construction | replace exisitng painted wood siding @ front facade w/new smooth trowelled stucco.Details
replace exisitng painted wood siding @ front facade w/new smooth trowelled stucco. | $10,000 |
| May 6, 2026 | In progress filed May 2026, not yet issued | 104 Presidio Av | restoration of (e) interior spaces to 7 apartments to match (e) addresses registered to parcel & last approved plans #201406168513. this permit addresses complaint #202650611.Details
restoration of (e) interior spaces to 7 apartments to match (e) addresses registered to parcel & last approved plans #201406168513. this permit addresses complaint #202650611. | $200,000 | |
| May 1, 2026 | In progress filed May 2026, not yet issued | 2901 16th St | voluntary structural strenghtening on the commercial ground floor w/ 2 moment frames. replace (e) sidewalk floor w/ 2 moment frames. replace (e) sidewalk over (e) basement w/ new concrete slab. disable access upgrades compliance per d.a checklist.Details
voluntary structural strenghtening on the commercial ground floor w/ 2 moment frames. replace (e) sidewalk floor w/ 2 moment frames. replace (e) sidewalk over (e) basement w/ new concrete slab. disable access upgrades compliance per d.a checklist. | $180,000 | |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 1736 Gough St | Grizzly Builders Inc. | bathroom remodel on third floor.Details
bathroom remodel on third floor. | $50,000 |
| Apr 8, 2026 | In progress issued Jun 2026 | 155 Lower Tr | Fahan Construction Inc | add new bathroom at bsmt level, remove (2) (e) garage doors and add one new garage door. add pocket doors at (e) living rm, new furnace to replace (e). replace 4 exit doors + 1 window in kind. (e) living room to become bedroom 3.Details
add new bathroom at bsmt level, remove (2) (e) garage doors and add one new garage door. add pocket doors at (e) living rm, new furnace to replace (e). replace 4 exit doors + 1 window in kind. (e) living room to become bedroom 3. | $150,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 2059 Mission St | Dv Gomez Construction Inc | struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces.Details
struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces. | $50,000 |
| Mar 26, 2026 | In progress filed Mar 2026, not yet issued | 2911 16th St | cosmetic upgrades to all residential units. creation of 5 accessibility units and 2 communication units. new heat pump water heaters, new electric sub-panels in all units.Details
cosmetic upgrades to all residential units. creation of 5 accessibility units and 2 communication units. new heat pump water heaters, new electric sub-panels in all units. | $500,000 | |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 1101 Green St | Grizzly Builders Inc. | unit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical.Details
unit 1702: kitchen & bathroom remodel: including new fixtures and cabinets, appliances, lighting & electrical. | $50,000 |
| Dec 12, 2025 | Expired or cancelled withdrawn Jun 2026 | 2061 Mission St | change guest rooms 34 & 35 to studios. modify units 19+33. all units replace (e) kitchen cabinets, bathroom remodel in kind. heating upgrades + new water heaters + 3 new laundry rooms.Details
change guest rooms 34 & 35 to studios. modify units 19+33. all units replace (e) kitchen cabinets, bathroom remodel in kind. heating upgrades + new water heaters + 3 new laundry rooms. | $150,000 | |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 1101 Green St | Grizzly Builders Inc. | unit 1402. remodel to existing kitchen new appliances, cabinets and counters. (n) outlets, new eelctrical sub panel.Details
unit 1402. remodel to existing kitchen new appliances, cabinets and counters. (n) outlets, new eelctrical sub panel. | $30,000 |
| Aug 15, 2025 | Completed final sign-off Jul 2026 | 231 Greenwich St | Dan Gillies Construction Services Inc | unit b- remodel (e) kitchen. remove non load bearing wall and post. reinforce (e) wood beam with channels. (n) shear wall and bolt down of north wall to foundationDetails
unit b- remodel (e) kitchen. remove non load bearing wall and post. reinforce (e) wood beam with channels. (n) shear wall and bolt down of north wall to foundation | $30,000 |
| Apr 17, 2025 | In progress issued Sep 2025 | 2061 Mission St | Dv Gomez Construction Inc | voluntary strengthening to 3 story bldg and basement inlcuding new concrete shearwalls and additional foundation elements. accessibility improvements to 4 commercial spaces. plumbing and electrical work per deferred submittal.Details
voluntary strengthening to 3 story bldg and basement inlcuding new concrete shearwalls and additional foundation elements. accessibility improvements to 4 commercial spaces. plumbing and electrical work per deferred submittal. | $275,000 |
| Jul 8, 2024 | Completed final sign-off Feb 2026 | 58 Valley St | D3 Construction | horizontal expansion of the existing 1/f towards the rear yard by 381 sq.ft. demo existing enclosed porch.Details
horizontal expansion of the existing 1/f towards the rear yard by 381 sq.ft. demo existing enclosed porch. | $150,000 |
| May 16, 2024 | Completed final sign-off Dec 2024 | 3655 Clay St | Belvedere Builders | rev 202103227016- rev title 24 report. removal of approved ductless mini split unitDetails
rev 202103227016- rev title 24 report. removal of approved ductless mini split unit | |
| Apr 30, 2024 | Completed final sign-off Sep 2024 | 2862 Bush St | Redoak Construction | revision to pa#202003137090. 1)change stair at deck to garden from switch back to spiral. 2)nw a/c condenser unit on roof. 3)nw hvac unit on roof. 4)2 nw sewage + rain water ejectors(sumpumps) on ground fl. 5)nw tankless water heater. 6)nw sink in primary bathrm. 7)washer/dryer nw location.Details
revision to pa#202003137090. 1)change stair at deck to garden from switch back to spiral. 2)nw a/c condenser unit on roof. 3)nw hvac unit on roof. 4)2 nw sewage + rain water ejectors(sumpumps) on ground fl. 5)nw tankless water heater. 6)nw sink in primary bathrm. 7)washer/dryer nw location. | |
| Dec 26, 2023 | Completed final sign-off Aug 2026 | 219 Spruce St | Nova Designs Builds Inc | replace (e) wood windows w/ (n) double pane wood & glass doors at front facade. replace primary bedroom windows in-kind. remodel (e) kitchen, family, dining, & powder rm. replace (e) windows & sliding door at rear. (n) hydronic floor heating on all lvls. remodel (e) 4 baths & 2 powder rooms. replaceDetails
replace (e) wood windows w/ (n) double pane wood & glass doors at front facade. replace primary bedroom windows in-kind. remodel (e) kitchen, family, dining, & powder rm. replace (e) windows & sliding door at rear. (n) hydronic floor heating on all lvls. remodel (e) 4 baths & 2 powder rooms. replace | $300,000 |
| Nov 23, 2022 | Never finaled filed Nov 2022, never issued | 104 Presidio Av | Van Acker Const Assoc Inc | new roof deck. 1045 sqft on west side of the property.Details
new roof deck. 1045 sqft on west side of the property. | $400,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2023 | 1250 Ellis St | Mora Custom Builder Construction | 2nd flr unit 8: soundproof sheetrock on ceiling and long shared wall in bedroom 3. remodel kitchen & bathroom in-kind. electrical lighting, adjust the plumbing for bath, change all the doors, change the carpet, reframe closet, paint unit. must comply with sffc 1103.7.6.1. fire alarm under sep permitDetails
2nd flr unit 8: soundproof sheetrock on ceiling and long shared wall in bedroom 3. remodel kitchen & bathroom in-kind. electrical lighting, adjust the plumbing for bath, change all the doors, change the carpet, reframe closet, paint unit. must comply with sffc 1103.7.6.1. fire alarm under sep permit | $150,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 106 Presidio Av | Van Acker Const Assoc Inc | revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect.Details
revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect. | |
| Nov 3, 2021 | Completed final sign-off Sep 2022 | 2353 Pacific Av | Cy Lo Builder | revision to permit #202106222940. infill one story,89 sq ft at existing elevator lobbyDetails
revision to permit #202106222940. infill one story,89 sq ft at existing elevator lobby | $10,000 |
| Aug 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2266 Bay St | new 474 sq. ft. roof deck permit.Details
new 474 sq. ft. roof deck permit. | $100,000 | |
| Jul 23, 2021 | Completed final sign-off Oct 2022 | 2351 Pacific Av | Cy Lo Builder | bathroom remodel in-kind, comply w/150.0(k)3Details
bathroom remodel in-kind, comply w/150.0(k)3 | $35,000 |
| Jun 22, 2021 | Completed final sign-off Sep 2022 | 2353 Pacific Av | 4/f: new elevator, bathroom remodel. new electrical and plumbing work. new hatch skylight.Details
4/f: new elevator, bathroom remodel. new electrical and plumbing work. new hatch skylight. | $400,000 | |
| May 28, 2021 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | Joel Mark, Dan Gillies Construction Services Inc | basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door systemDetails
basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door system | $325,000 |
| Mar 22, 2021 | Completed final sign-off Dec 2024 | 3655 Clay St | Dan Gillies Construction Services Inc, Belvedere Builders | this project seeks a variance to do a one story horizontal addition in the rear yard of 143 sq. ft. the addition will create a ground floor bedroom.Details
this project seeks a variance to do a one story horizontal addition in the rear yard of 143 sq. ft. the addition will create a ground floor bedroom. | $100,000 |
| Feb 24, 2021 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedrDetails
basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedr | $600,000 |
| Feb 16, 2021 | Completed final sign-off Sep 2021 | 237 29th Av | Niz Construction | rev to pa202009305536: remove post @ kitchen , add new post & beam & footing (ssd).new exterior windows, wood frame low-e.Details
rev to pa202009305536: remove post @ kitchen , add new post & beam & footing (ssd).new exterior windows, wood frame low-e. | $10,000 |
| Feb 12, 2021 | Never finaled issued Mar 2022, no final | 229 Upper Tr | Cole's Construction | remove demissing wall at rear 3rd fl down center of bldg. add interior stair from 3rd fl to 2nd fl for (n) master bedroom & (n) bathroom at 2nd fl behind garage.Details
remove demissing wall at rear 3rd fl down center of bldg. add interior stair from 3rd fl to 2nd fl for (n) master bedroom & (n) bathroom at 2nd fl behind garage. | $100,000 |
| Oct 24, 2020 | Expired or cancelled expired Apr 2026 | 71 Water St | E W Lum Construction Co | revision to pa #2017-0126-8036: revise (e) structural plans to include (e) moment frame, structural and grade beams. remove proposed roof parapets, remove extra fire escape landing at roof. new walls at 1st floor for future adu.Details
revision to pa #2017-0126-8036: revise (e) structural plans to include (e) moment frame, structural and grade beams. remove proposed roof parapets, remove extra fire escape landing at roof. new walls at 1st floor for future adu. | |
| Sep 30, 2020 | Completed final sign-off Aug 2021 | 237 29th Av | Niz Construction | interior remodel of kitchen, dining room, laundry room, new powder room, stair to basement.Details
interior remodel of kitchen, dining room, laundry room, new powder room, stair to basement. | $75,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2024 | 2862 Bush St | Redoak Construction | excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above.Details
excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above. | $800,000 |
| Mar 2, 2020 | Expired or cancelled cancelled Nov 2024 | 231 24th Av | new 4th floor vertical addition, new front roof deck, new bedroom, new bathroom on 4th floor, new sprinklers to 4th floor & new bedroom. sprinklers under separate permit. ** maher: n/a **Details
new 4th floor vertical addition, new front roof deck, new bedroom, new bathroom on 4th floor, new sprinklers to 4th floor & new bedroom. sprinklers under separate permit. ** maher: n/a ** | $480,000 | |
| Sep 24, 2019 | Completed final sign-off May 2022 | 30 Valley St | revision to app #201802020209-s1. eliminate sprinkler system @ rear yard, (1) accessory dwelling unit from scope of work, unit not required to install sprinkler.Details
revision to app #201802020209-s1. eliminate sprinkler system @ rear yard, (1) accessory dwelling unit from scope of work, unit not required to install sprinkler. | ||
| Jul 2, 2019 | Never finaled issued Dec 2021, no final | 2269 Francisco St | Mw General Contracting | (n) deck on the roof of 3rd flr. roof deck include a new steel pergola, 1hr 6' tall wall, fire pit, bbq grill, new sink outdoor cabinets and a 1hr roof stair penthouse.**maher n/a**Details
(n) deck on the roof of 3rd flr. roof deck include a new steel pergola, 1hr 6' tall wall, fire pit, bbq grill, new sink outdoor cabinets and a 1hr roof stair penthouse.**maher n/a** | $150,000 |
| Jun 19, 2019 | Expired or cancelled cancelled Jan 2026 | 99 22nd Av | Five Lakers General Contractors Inc | revision to pa 201903226006. window size reduction in kitchen, add (n) fixed window in pantry, remove transom window in master bathroom and add (n) casement window in master bathroom.Details
revision to pa 201903226006. window size reduction in kitchen, add (n) fixed window in pantry, remove transom window in master bathroom and add (n) casement window in master bathroom. | $15,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2020 | 99 22nd Av | Five Lakers General Contractors Inc, Joel Mark | electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closetDetails
electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closet | $300,000 |
| Jan 10, 2018 | Completed final sign-off Apr 2026 | 71 Water St | E W Lum Construction Co | add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a **Details
add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a ** | $100,000 |
| Jan 26, 2017 | Expired or cancelled expired Apr 2026 | 71 Water St | E W Lum Construction Co | (e) bldg change of use/occupancy from offices to residential apartments. (n) emergency rescue stair & corridor at patio & first floor.Details
(e) bldg change of use/occupancy from offices to residential apartments. (n) emergency rescue stair & corridor at patio & first floor. | $200,000 |
| May 25, 2016 | Completed final sign-off Nov 2016 | 1875 Geary Bl | S4s Construction Inc | tenant improvement to existing limited restaurant fast food take out to limited restaurant non franchised bakery. add gender specific ada restrooms.Details
tenant improvement to existing limited restaurant fast food take out to limited restaurant non franchised bakery. add gender specific ada restrooms. | $50,000 |
| Apr 29, 2015 | Completed final sign-off Nov 2015 | 135 Belgrave Av | Farallon General Contractors Inc. | revision to 2013 12 12 4044; add egress stairs to satify means of egress. remove sprinkler requirment.Details
revision to 2013 12 12 4044; add egress stairs to satify means of egress. remove sprinkler requirment. | $20,000 |
| Dec 11, 2013 | Completed final sign-off Dec 2013 | 3560 21st St | unit #2 - converting an (e) bedroom to a new storage space. to comply w/ nov#201395241.Details
unit #2 - converting an (e) bedroom to a new storage space. to comply w/ nov#201395241. | ||
| Jul 18, 2013 | Completed final sign-off Jun 2015 | 281 Avila St | Lau Construction Llc, Cairn Construction | 1/f:new foundation at new family room,remove(e)wood columns at garage&replace w/steel beams;new interior stair betwn 1st&2/fl near kitchen.2/f:remodel(e)kitchen&eating area.3/f:horiz addition towards rear of 287 sq ft.remodel(e)2 bathrms&bedrms,new laundry.new sprinklers on entire house.Details
1/f:new foundation at new family room,remove(e)wood columns at garage&replace w/steel beams;new interior stair betwn 1st&2/fl near kitchen.2/f:remodel(e)kitchen&eating area.3/f:horiz addition towards rear of 287 sq ft.remodel(e)2 bathrms&bedrms,new laundry.new sprinklers on entire house. | $320,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2014 | 753 Alabama St | use change from light industrial f-1 to retail, restaurant. installing: (1) ada bathroom, (1) bathroom, (1) commercial kitchen, (1) bar w/ada counter.Details
use change from light industrial f-1 to retail, restaurant. installing: (1) ada bathroom, (1) bathroom, (1) commercial kitchen, (1) bar w/ada counter. | $50,000 | |
| Mar 26, 2013 | Completed final sign-off Feb 2014 | 11 Commonwealth Av | Farallon General Contractors Inc. | horiz expansion(75 sq.ft @ sw corner for stair connect 1/fl&bsmt,within(e)foot print of915 sq ft at bsmt level. new closet volume (expansion) at frt hs 8 sq.ft.remodel(e)bsmt to create new multi purpose rm.complete(e)bathrm roughed in plumbing at bsmt level.new elec in bsmt&stair shaft.Details
horiz expansion(75 sq.ft @ sw corner for stair connect 1/fl&bsmt,within(e)foot print of915 sq ft at bsmt level. new closet volume (expansion) at frt hs 8 sq.ft.remodel(e)bsmt to create new multi purpose rm.complete(e)bathrm roughed in plumbing at bsmt level.new elec in bsmt&stair shaft. | $100,000 |
| Mar 12, 2013 | Completed final sign-off Jan 2014 | 11 Commonwealth Av | Farallon General Contractors Inc. | kitchen expansion on 1st floor, infill area of kitchen expansion -remove stair from 1/f to basement, new powder rm, new family room, basement foundation & partial footings, new mud room in (e) garage, demo conc pad on back yard. add new wood deck 6" above grade in south east corner of property,Details
kitchen expansion on 1st floor, infill area of kitchen expansion -remove stair from 1/f to basement, new powder rm, new family room, basement foundation & partial footings, new mud room in (e) garage, demo conc pad on back yard. add new wood deck 6" above grade in south east corner of property, | $400,000 |
| Apr 16, 2012 | Expired or cancelled expired Aug 2017 | 610 Page St | Maclaird Construction | addition to 2009-07-09-2316. increase size of basement & add on to 1st & 2nd floors. tower & stair access from 2nd fl to new roof deck & solar/turbine installations. also deck on top of 1st floor addition.Details
addition to 2009-07-09-2316. increase size of basement & add on to 1st & 2nd floors. tower & stair access from 2nd fl to new roof deck & solar/turbine installations. also deck on top of 1st floor addition. | $150,000 |
| Jan 6, 2012 | Completed final sign-off Mar 2013 | 3416 19th St | change of use from club lodge to full service restaurant. occup a3 to a2.Details
change of use from club lodge to full service restaurant. occup a3 to a2. | $20,000 | |
| Sep 23, 2009 | Completed final sign-off Jan 2010 | 3431 19th St | S4s Construction Inc | voluntary seismic upgrade @ ground floor & replac efooting demolition of existing framing sheetrock & slab.Details
voluntary seismic upgrade @ ground floor & replac efooting demolition of existing framing sheetrock & slab. | $35,000 |
| Apr 13, 2009 | Completed final sign-off Mar 2010 | 911 Central Av | Preservation Trust Builder | add new bathroom, move laundry closet.Details
add new bathroom, move laundry closet. | $25,000 |
| Oct 28, 2008 | Expired or cancelled expired Apr 2012 | 1725 Hyde St | remodeling of 7 extg units: updating electrical, plmg, bathrooms and kitchens. partial redesign of all units. install new wood sash wndw at front facade & new vinyl sash wndws at sides and real facades.Details
remodeling of 7 extg units: updating electrical, plmg, bathrooms and kitchens. partial redesign of all units. install new wood sash wndw at front facade & new vinyl sash wndws at sides and real facades. | $100,000 | |
| Oct 6, 2008 | Expired or cancelled cancelled Jan 2020 | 1725 Hyde St | addition of a 472 sf wood roof deck to rear of building. interior remodel to be filed under separate permit.Details
addition of a 472 sf wood roof deck to rear of building. interior remodel to be filed under separate permit. | $35,000 | |
| Jul 24, 2008 | Completed final sign-off Dec 2008 | 220 Randall St | remodel master bathroom & 2nd bathroom on 3rd floor. new recessed lighting @ livingroom & master bedroom, retrofit (e) window frames w/new vinyl double pane windows on 2nd & 3rd floor.remodel powder room, relocate partition wall @2/f, (n) guardrail @2/f, misc. finishes, new doors, replace doors.Details
remodel master bathroom & 2nd bathroom on 3rd floor. new recessed lighting @ livingroom & master bedroom, retrofit (e) window frames w/new vinyl double pane windows on 2nd & 3rd floor.remodel powder room, relocate partition wall @2/f, (n) guardrail @2/f, misc. finishes, new doors, replace doors. | $75,000 | |
| Nov 20, 2007 | Expired or cancelled withdrawn May 2008 | 2475 Vallejo St | to merge an existing two family dwelling into a single family house. associated work includes interior remodel.Details
to merge an existing two family dwelling into a single family house. associated work includes interior remodel. | $400,000 | |
| Nov 15, 2007 | Never finaled issued Nov 2007, no final | 574 Belvedere St | removal of two sklights in the kitchen,alternate location of skylights,alternate window locations,new dectorative appliance.revision to 2006 0425 9831Details
removal of two sklights in the kitchen,alternate location of skylights,alternate window locations,new dectorative appliance.revision to 2006 0425 9831 | $2,000 | |
| Dec 21, 2006 | Expired or cancelled withdrawn Jul 2009 | 1353 Bush St | modify work in progress under renewal 2006-06-07-3404. sprinkler permit to be design build under separate permitDetails
modify work in progress under renewal 2006-06-07-3404. sprinkler permit to be design build under separate permit | $500,000 | |
| May 9, 2005 | Never finaled issued Jan 2006, no final | 3635 20th St | replacement of exist windows and install of new windows per plans. no other work under this application.Details
replacement of exist windows and install of new windows per plans. no other work under this application. | $4,000 |