Dv Gomez Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Apr 2025 to Apr 2026
- Last 24 months
- 6 permits filed
6 permits since 2000: 3 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2026 | In progress issued Apr 2026 | 2059 Mission St | struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces.Details
struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces. | $50,000 |
| Dec 12, 2025 | Completed final sign-off Sep 2026 | 2061 Mission St | replace 196 windows not visible from the street with new vinyl single hung windows. replace in existing openings. u<=0.30Details
replace 196 windows not visible from the street with new vinyl single hung windows. replace in existing openings. u<=0.30 | $50,000 |
| Oct 1, 2025 | Completed final sign-off Nov 2025 | 520 Shrader St | to comply w/ complaint #202542471 items #2, 3, 4, 5, 6: replace plumbing for bathtub and toilet supply line with new upper line. replace bathtub and surround. replace (2) windows w/ new vinyl windows in unit 6 and common area (not street visible). replace water heater. u-factor<0.3,rshgc<0.23.Details
to comply w/ complaint #202542471 items #2, 3, 4, 5, 6: replace plumbing for bathtub and toilet supply line with new upper line. replace bathtub and surround. replace (2) windows w/ new vinyl windows in unit 6 and common area (not street visible). replace water heater. u-factor<0.3,rshgc<0.23. | $5,000 |
| Sep 30, 2025 | In progress issued Feb 2026 | 2061 Mission St | remodel of 34 private bathrooms and 23 private kitchens in kind replace 34 water heaters in-unit, replace 34 gas stoves with new duction stoves, replace in-kind new heat in all 34 units 22 heat pumps and 16 wall heaters, new sub panel in all units and 1 new laundry room.Details
remodel of 34 private bathrooms and 23 private kitchens in kind replace 34 water heaters in-unit, replace 34 gas stoves with new duction stoves, replace in-kind new heat in all 34 units 22 heat pumps and 16 wall heaters, new sub panel in all units and 1 new laundry room. | $125,000 |
| May 30, 2025 | Completed final sign-off Aug 2025 | 2684 Bryant St | replace and regrade concrete backyard (approx. 500 sq ft) and add drainage. replace (e) (5) water heaters with electric, replace subpanels with new 80 amp panels, and replace stoves in all (4) units. replace (e) shed in kind. pl wall of shed to be 1 hr rated with 5/8" type x sheet rock each side.Details
replace and regrade concrete backyard (approx. 500 sq ft) and add drainage. replace (e) (5) water heaters with electric, replace subpanels with new 80 amp panels, and replace stoves in all (4) units. replace (e) shed in kind. pl wall of shed to be 1 hr rated with 5/8" type x sheet rock each side. | $40,000 |
| Apr 17, 2025 | In progress issued Sep 2025 | 2061 Mission St | voluntary strengthening to 3 story bldg and basement inlcuding new concrete shearwalls and additional foundation elements. accessibility improvements to 4 commercial spaces. plumbing and electrical work per deferred submittal.Details
voluntary strengthening to 3 story bldg and basement inlcuding new concrete shearwalls and additional foundation elements. accessibility improvements to 4 commercial spaces. plumbing and electrical work per deferred submittal. | $275,000 |