Jason Pisano
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Hom-Pisano Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Aug 2026
121 permits since 2000 (engineer on 119 permits, authorized agent-others on 2 permits, architect on 1 permit): 66 completed, 22 in progress, 12 never finaled, 21 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 882 Sutter St | relocate opening wall. relocate kitchen prep equipment to (e) storage space. relocate (e) single occupant restroom in back of house space. no exterior work.Details
relocate opening wall. relocate kitchen prep equipment to (e) storage space. relocate (e) single occupant restroom in back of house space. no exterior work. | $147,900 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 537 Stevenson St | Cookline Construction Inc | revision to pa 202508082687 (ref 202604169569) structural changes only to 2nd fl diaphragm connections @ collector to brick wallsDetails
revision to pa 202508082687 (ref 202604169569) structural changes only to 2nd fl diaphragm connections @ collector to brick walls | $1,500 |
| Aug 6, 2026 | In progress issued Aug 2026 | 3252 19th St | Velox Construction Inc/Velox Des & Const | new window on side of building (new opening)Details
new window on side of building (new opening) | $3,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 1117 Hampshire St | residence remodel and addition, including partial demo at the rear and ground level excavation to increase floor to ceiling height.Details
residence remodel and addition, including partial demo at the rear and ground level excavation to increase floor to ceiling height. | $190,000 | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 2445 Ocean Av | construction of a new 4story type v-b mixed use commercial / residential building with elevator & roof terrace.Details
construction of a new 4story type v-b mixed use commercial / residential building with elevator & roof terrace. | $1,947,000 | |
| May 27, 2026 | In progress issued Jun 2026 | 399 10th Av | Rcp Construction Llc | at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant.Details
at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant. | $190,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 537 Stevenson St | Cookline Construction Inc | revision 202508082687. remove sistering of joists and install beam , post, footing to strengten ground floor. revise collector and elevator detailDetails
revision 202508082687. remove sistering of joists and install beam , post, footing to strengten ground floor. revise collector and elevator detail | $5,000 |
| Mar 17, 2026 | In progress issued Jun 2026 | 4388 23rd St | Faultline Construction Inc | new fenestration and exterior cladding on an existing 2 bed, 2 bath residence. minor site work within property including new planting strip and replacement of (e) exterior stairDetails
new fenestration and exterior cladding on an existing 2 bed, 2 bath residence. minor site work within property including new planting strip and replacement of (e) exterior stair | $35,000 |
| Mar 12, 2026 | Completed final sign-off Aug 2026 | 2394 Folsom St | Hl81 Construction Inc. | revision to pa #202506027710 to add new detail for steel column to be supported by existing footing add special inspection item. bolts installed in existing concrete.Details
revision to pa #202506027710 to add new detail for steel column to be supported by existing footing add special inspection item. bolts installed in existing concrete. | |
| Feb 19, 2026 | In progress issued Aug 2026 | 354 Arlington St | Cardea Bldg Dba Dimension Design Group | work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights.Details
work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights. | $40,000 |
| Nov 18, 2025 | In progress issued Nov 2025 | 600 Ortega St | Barron Construction Inc. | revision to bpa# 2023.0427.6609- retain (e) shared concrete footing at east and west property lines and sister new footing/ install haunched piers (ref 2025.0613.8686)Details
revision to bpa# 2023.0427.6609- retain (e) shared concrete footing at east and west property lines and sister new footing/ install haunched piers (ref 2025.0613.8686) | |
| Sep 22, 2025 | In progress issued Aug 2026 | 54 Sussex St | Mrcc | new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovationsDetails
new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovations | $750,000 |
| Sep 15, 2025 | In progress issued Dec 2025 | 1550 Diamond St | Roly Construction | revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights.Details
revision to pa #202501108136. relocate kitchen, change primary bath & half bath layout at 3rd floor. add one new fire rated window. window replacement at east, south and west facades. replace quardrail in kind at east facing roof deck. 2 new skylights. | $78,000 |
| Sep 9, 2025 | In progress issued Apr 2026 | 2001 48th Av | Clarity Construction Group | add roof deck and enclosed 3rd story room to (e) 2-story home. add 2 horizontal extensions that are not subject to 3.11 notification.Details
add roof deck and enclosed 3rd story room to (e) 2-story home. add 2 horizontal extensions that are not subject to 3.11 notification. | $600,000 |
| Aug 8, 2025 | In progress issued Mar 2026 | 537 Stevenson St | Cookline Construction Inc | prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen.Details
prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen. | $700,000 |
| Jul 17, 2025 | Completed final sign-off Oct 2026 | 55 Clipper St | Clayton Timbrell & Co | landscape retaining wall replacement at rear yard. shared scope with pa# 202509266200.Details
landscape retaining wall replacement at rear yard. shared scope with pa# 202509266200. | $6,250 |
| Jun 3, 2025 | In progress issued May 2026 | 498 Beach St | Level Land Builders Inc. | tenant improvement of a 5,102sf food truck renovation, full restaurant use located at northeast corner of jones & beach in fisherman's wharf. project will provide 5 food truck stalls with designated entry points for each truck.Details
tenant improvement of a 5,102sf food truck renovation, full restaurant use located at northeast corner of jones & beach in fisherman's wharf. project will provide 5 food truck stalls with designated entry points for each truck. | $250,000 |
| Jun 2, 2025 | Completed final sign-off Aug 2026 | 2394 Folsom St | Hl81 Construction Inc. | new stairs from mezzananine to first floor.Details
new stairs from mezzananine to first floor. | $6,000 |
| May 14, 2025 | Expired or cancelled expired Oct 2026 | 508 Cole St | Gorman Construction | replace "in-kind" non-conforming exterior stairs at front facade.Details
replace "in-kind" non-conforming exterior stairs at front facade. | $20,000 |
| May 2, 2025 | Completed final sign-off Aug 2026 | 1623 Noe St | revision to pa #2024-0913-0713 & 2025-0418-4746 new conditined fl area at (e) first fl (unit 1625) two new bathrooms, one bedroom and one office.Details
revision to pa #2024-0913-0713 & 2025-0418-4746 new conditined fl area at (e) first fl (unit 1625) two new bathrooms, one bedroom and one office. | $40,000 | |
| Apr 18, 2025 | Completed final sign-off Aug 2026 | 1623 Noe St | revision to pa 202409130713 new foundations, new skylight, new infill (window); exterior wall @ new kitchenDetails
revision to pa 202409130713 new foundations, new skylight, new infill (window); exterior wall @ new kitchen | $25,000 | |
| Feb 4, 2025 | Expired or cancelled withdrawn May 2025 | 600 Ortega St | alter site: add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height.this is a revision to building permit application no. 202304276609 and planning record no. 2023-003074prj.Details
alter site: add an elevator penthouse, service roof deck, and exterior spiral staircase. the elevator penthouse will be approximately 12 feet in height.this is a revision to building permit application no. 202304276609 and planning record no. 2023-003074prj. | $1,000 | |
| Jan 9, 2025 | Completed final sign-off May 2026 | 499 Alabama St | Beam Construction Enterprises Inc | reroute roof water to 10k gal above ground cistern anchored to new reinforced concrete pad in (e) parking lot. extend rainwater piping from interior of theater bldg to upper floor windows,along face buiding to suport posts along fence and then over to cistern.construction of bioretention plantersDetails
reroute roof water to 10k gal above ground cistern anchored to new reinforced concrete pad in (e) parking lot. extend rainwater piping from interior of theater bldg to upper floor windows,along face buiding to suport posts along fence and then over to cistern.construction of bioretention planters | $380,000 |
| Dec 18, 2024 | Expired or cancelled expired Aug 2026 | 21 Vicksburg St | Aurora Builders | remove post between kitchen and sunporch. replace (3) exterior doors & (7) windows at the rear (not visible from street). new tankless water heater. new central split heat pumpDetails
remove post between kitchen and sunporch. replace (3) exterior doors & (7) windows at the rear (not visible from street). new tankless water heater. new central split heat pump | $85,000 |
| Jul 30, 2024 | In progress filed Jul 2024, not yet issued | 253 States St | revision to pa# 202305047077: relocate kitchen, add bathroom, revised foundation. (ref pa# 202305047077)Details
revision to pa# 202305047077: relocate kitchen, add bathroom, revised foundation. (ref pa# 202305047077) | ||
| Jul 30, 2024 | In progress issued Aug 2025 | 3968 Sacramento St | Futurecorp Development And Construction | 3970 sacramento- (n) deck at rear 3968 sacramento- remove ext stairs to rear yard. for both units: remodel kitchens & bath. add (n) bath. relocate laundry. replace in kind sunrooms at northeast corner. remove bearing wall btwn living & dining room. (n) windows & sliding doors at rear yard elevationDetails
3970 sacramento- (n) deck at rear 3968 sacramento- remove ext stairs to rear yard. for both units: remodel kitchens & bath. add (n) bath. relocate laundry. replace in kind sunrooms at northeast corner. remove bearing wall btwn living & dining room. (n) windows & sliding doors at rear yard elevation | $190,000 |
| Jul 11, 2024 | Completed final sign-off Mar 2025 | 3271 Jackson St | D K G Construction Inc | revision pa 202406245135 addding new tile cladding to existing concrete steps and landings. 2 (n) comc planters to replace (e) birck planters. new garage doorDetails
revision pa 202406245135 addding new tile cladding to existing concrete steps and landings. 2 (n) comc planters to replace (e) birck planters. new garage door | |
| Jul 3, 2024 | In progress issued Dec 2025 | 725 Sanchez St | Cej Construction Llc | to erect a 3-story over 1 basement, type v-b, single family residence. within delores heights special use district restrictionsDetails
to erect a 3-story over 1 basement, type v-b, single family residence. within delores heights special use district restrictions | $750,000 |
| Jun 24, 2024 | Completed final sign-off Mar 2025 | 3271 Jackson St | D K G Construction Inc | add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam.Details
add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam. | $25,000 |
| Apr 24, 2024 | Completed final sign-off Mar 2025 | 93 Buena Vista Tr | Restoration Workshop Ltd | reference to application 2022-0113-5988 s1. to repair existing substandard framing exposed during work under permit application 5988. work include miscellaneous structural revision to stair, exterior wall and roof framingsDetails
reference to application 2022-0113-5988 s1. to repair existing substandard framing exposed during work under permit application 5988. work include miscellaneous structural revision to stair, exterior wall and roof framings | $45,000 |
| Apr 4, 2024 | Completed final sign-off Nov 2024 | 471 22nd Av | Fair Trade Builders Inc | remodel of extg 1st floor garage level. convert extg storage space into 2 new bedrooms, 1 new bathroom, and laundry. partial foundation replacement. complete demolition (32%) on bpa 202402125690.Details
remodel of extg 1st floor garage level. convert extg storage space into 2 new bedrooms, 1 new bathroom, and laundry. partial foundation replacement. complete demolition (32%) on bpa 202402125690. | $200,000 |
| Mar 27, 2024 | In progress filed Mar 2024, not yet issued | 3153 Pacific Av | chip and level extg basement slab on grade. replace extg wood floor in basement. add wall for new closet. partial structural strengthening inc. new shear walls. new posts and new footings. sheath wall with exposed framing in plywood or gyp. board, see plans.Details
chip and level extg basement slab on grade. replace extg wood floor in basement. add wall for new closet. partial structural strengthening inc. new shear walls. new posts and new footings. sheath wall with exposed framing in plywood or gyp. board, see plans. | ||
| Mar 20, 2024 | Expired or cancelled cancelled Aug 2026 | 1590 Pacific Av | Doherty Restoration, Inc. | re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area.Details
re-establishment of liquor store use for legacy business "the jug shop" per planning commission motion # 201818. tenant improvement including sales area, tasting-bar, office and dishwashing area. | $240,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2025 | 1517 08th Av | Prime Construction & Renovation Inc. | remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior workDetails
remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior work | $100,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 805 Clayton St | Hive Builds Inc. | revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br.Details
revision to pa #202103307550. remove bath at basement and modify 1/2 bath to full at 1st fl. minor configuration change to stairs to basement. remove original basement level retaining wall. lower grade beam at basement line "e" and underpin constructed footings at perimeter walls of lower level br. | |
| Nov 29, 2023 | In progress issued May 2026 | 1877 Broadway | interior remodel including fourth floor expansion within existing building footprint. new work not visible from public right of way.Details
interior remodel including fourth floor expansion within existing building footprint. new work not visible from public right of way. | $350,000 | |
| Oct 6, 2023 | Never finaled issued Oct 2023, no final | 1104 Treat Av | Jimenez Construction Sf Inc | revision to pa# 202109178616, change to foundation scope, existing footings @ "a" to remain.Details
revision to pa# 202109178616, change to foundation scope, existing footings @ "a" to remain. | |
| Aug 8, 2023 | Expired or cancelled withdrawn Sep 2026 | 467 Filbert St | revision to 2102307031402. replace approved 42" guardrail with 72" glass guardrail @ e roofdeckDetails
revision to 2102307031402. replace approved 42" guardrail with 72" glass guardrail @ e roofdeck | ||
| Jul 6, 2023 | Never finaled filed Jul 2023, never issued | 2935 Fillmore St | response to complaint# 2022-0693enf.existing 4th fl unit to be legalized under rh-3 dwelling density allowances.roof deck/52 sf)to be added to 4th fl unit.permit application split under 2022-012509prjDetails
response to complaint# 2022-0693enf.existing 4th fl unit to be legalized under rh-3 dwelling density allowances.roof deck/52 sf)to be added to 4th fl unit.permit application split under 2022-012509prj | $150,000 | |
| Jul 3, 2023 | Completed final sign-off Apr 2024 | 467 Filbert St | replace (e) 36" glass guard rail w/42" glass @ (e) roof deckDetails
replace (e) 36" glass guard rail w/42" glass @ (e) roof deck | $15,000 | |
| May 15, 2023 | Expired or cancelled cancelled May 2024 | 1931 Lyon St | replace brick entry stair w/new code compliant (rise/run/fire rated); concrete stair w/porcelain treads& cedar siding (to match existing) & 1 solid fire rated guardrail (per dbi pre app) & 1 metal railing (painted); upgrade water service w/puc. see structural. relocate gas meterDetails
replace brick entry stair w/new code compliant (rise/run/fire rated); concrete stair w/porcelain treads& cedar siding (to match existing) & 1 solid fire rated guardrail (per dbi pre app) & 1 metal railing (painted); upgrade water service w/puc. see structural. relocate gas meter | $15,000 | |
| May 4, 2023 | Completed final sign-off Feb 2025 | 3252 19th St | Velox Construction Inc/Velox Des & Const | revision to permit 201808167612. change in closet layout and ramps. change of use not in scope of work.Details
revision to permit 201808167612. change in closet layout and ramps. change of use not in scope of work. | |
| Mar 28, 2023 | Completed final sign-off Mar 2024 | 386 Hill St | Barker-O'donoghue Master Bldrs | replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances.Details
replace kitchen w/new kitchen in e location, remodel laundry rm, replace side window w/new fixed window, not visible from street, remodel 3rd flr to include 3 bedrooms & 2 bathrooms. new lighting & electrical, new plumbing, fixtures & appliances. | $136,110 |
| Mar 9, 2023 | Never finaled filed Mar 2023, never issued | 2935 Fillmore St | response to complaint #2022-00693enf.add adu per ordinance 162-16 at existing garden level unit ,in conjuction with bpa#202303093352,under 2022-01509prj.Details
response to complaint #2022-00693enf.add adu per ordinance 162-16 at existing garden level unit ,in conjuction with bpa#202303093352,under 2022-01509prj. | $150,000 | |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 4439 24th St | removations & infill addition per 2.a.b #4; remodel the e sun rm, kitchen, bathrooms & bedrooms. new lighting & sun tunnels in area of n work. infill the e west lightwell per 2.a.b #4, exception 5a. add a n dormer to rear roof. n doors & windows on rear facade.Details
removations & infill addition per 2.a.b #4; remodel the e sun rm, kitchen, bathrooms & bedrooms. new lighting & sun tunnels in area of n work. infill the e west lightwell per 2.a.b #4, exception 5a. add a n dormer to rear roof. n doors & windows on rear facade. | $75,000 | |
| Dec 9, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | Zack De Vito Inc, Aaron Gordon Construction Inc | new proposed roof deck to existing 3-story building.Details
new proposed roof deck to existing 3-story building. | $15,000 |
| Nov 28, 2022 | Never finaled issued Jul 2023, no final | 111 Congdon St | Rivera Builders | interior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear.Details
interior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear. | $20,000 |
| Nov 21, 2022 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | Mcguinness Mccann Group | revision to 202210144350. structural framing changes to reflect + address field conditions. roof ridge kicked down to center bearing wall.Details
revision to 202210144350. structural framing changes to reflect + address field conditions. roof ridge kicked down to center bearing wall. | |
| Nov 16, 2022 | Completed final sign-off Oct 2023 | 1243 12th Av | Sage Construction Services | 2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage roomDetails
2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage room | $95,000 |
| Nov 4, 2022 | In progress issued Feb 2025 | 354 Molimo Dr | 1/f new conditioned space including new stairs, 1 bathroom, & new deck. 2/f horizontal addition (lightwell infill), kitchen remodel & new powder room. 3/f bathroom remodel w/ new skylight. result in 2 bedrooms, 2.5 bathroom, family room, & office on 1/f. no changes to street facade.Details
1/f new conditioned space including new stairs, 1 bathroom, & new deck. 2/f horizontal addition (lightwell infill), kitchen remodel & new powder room. 3/f bathroom remodel w/ new skylight. result in 2 bedrooms, 2.5 bathroom, family room, & office on 1/f. no changes to street facade. | $350,000 | |
| Oct 27, 2022 | Completed final sign-off Mar 2026 | 418 Liberty St | Aaron Gordon Construction Inc | renovation and addition to single family residence. building additions and renovations are on first floor and the basement below. stairs modified to provide access to additions and rear yard.Details
renovation and addition to single family residence. building additions and renovations are on first floor and the basement below. stairs modified to provide access to additions and rear yard. | $160,000 |
| Oct 14, 2022 | Completed final sign-off Sep 2026 | 3021 Market St | Rescom Realty And Development Llc | alteration to crawl space foundation plan and move door (at rear) at crawl space level revision to pa# 202205164289.Details
alteration to crawl space foundation plan and move door (at rear) at crawl space level revision to pa# 202205164289. | |
| Sep 21, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | Zack De Vito Inc, Aaron Gordon Construction Inc | renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade.Details
renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade. | $375,000 |
| Sep 9, 2022 | In progress issued Apr 2025 | 20 Hill St | D K G Construction Inc | 2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness.Details
2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness. | $300,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 411 Teresita Bl | Mcguinness Mccann Group | new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage,Details
new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage, | $40,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2024 | 1717 Broderick St | 0303 Construction Inc. | addition of residential elevator at south exterior alley.Details
addition of residential elevator at south exterior alley. | $90,000 |
| May 16, 2022 | Completed final sign-off Feb 2025 | 300 Surrey St | exterior facade work including: altering a bay projection, improvements to the entry and steps leading from the street to the entry, and improvement to an existing deck on top of the garage.Details
exterior facade work including: altering a bay projection, improvements to the entry and steps leading from the street to the entry, and improvement to an existing deck on top of the garage. | $50,000 | |
| May 2, 2022 | Expired or cancelled withdrawn Mar 2025 | 226 Rutledge St | Mcguinness Mccann Group, S Mc Cann Construction Inc | replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundryDetails
replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundry | $300,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 264 16th Av | Alder Construction | old rotting deck to be removed. new deck to be constructed, same dimensions as old.Details
old rotting deck to be removed. new deck to be constructed, same dimensions as old. | $50,000 |
| Mar 31, 2022 | Never finaled filed Mar 2022, never issued | 1047 Diamond St | renovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain.Details
renovation of (e) 2 story 2 units multi-family building. remodel upper (1047) unit from 3bed/1bath to 3-bed/2.5-bath. create private usable open space at roof deck. unit to have a private entry at clipper st. exterior bldg dimensions and heights to remain. | $200,000 | |
| Mar 31, 2022 | Never finaled filed Mar 2022, never issued | 1045 Diamond St | renovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged.Details
renovation of (e) 2 story 2 units multi-family building. remodel lower (1045) unit from 1bed/1bath to 2-bed/2-bath. unit to have private entrance. eliminate common entry and circulation. reduce garage space from 2-car to 1-car. bldg exterior dimensions and heights unchanged. | $300,000 | |
| Mar 24, 2022 | Completed final sign-off Oct 2023 | 2609 Diamond St | R & D Construction Co Inc | revision to permit 201801098136. revise basement floor layout - office/media room. revise 2nd floor layout - bathroom/living.Details
revision to permit 201801098136. revise basement floor layout - office/media room. revise 2nd floor layout - bathroom/living. | |
| Mar 10, 2022 | Completed final sign-off Oct 2022 | 1474 Newcomb Av | Reliable Construction Inc | infill under extg sunroom in rear yard. add 2 bedrooms, office, bathroom, family room, kitchenette at ground floor. add bath at upper floor. no expansion of bldg envelope or work visible from street. ref pa#202111122306Details
infill under extg sunroom in rear yard. add 2 bedrooms, office, bathroom, family room, kitchenette at ground floor. add bath at upper floor. no expansion of bldg envelope or work visible from street. ref pa#202111122306 | $100,000 |
| Mar 9, 2022 | Completed final sign-off Aug 2024 | 620 Myra Wy | Arroyo Realty & Development Llc | revision to pa# 202102195044. structural drawings for new interior wall configuration.Details
revision to pa# 202102195044. structural drawings for new interior wall configuration. | |
| Mar 9, 2022 | Completed final sign-off Feb 2024 | 849 Sanchez St | Barker-O'donoghue Master Bldrs | add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac.Details
add (n) roof deck, cable guard rail, roof access hatch, & interior stair. replace roofing. remodel (e) kitchen & bathrooms. remove & replace 2nd fl terrace flooring in-kind. new lighting in areas of new work. new whole house fan & ducted ac. | $138,552 |
| Mar 3, 2022 | Completed final sign-off Jun 2023 | 2182 48th Av | Tosick Remodels | removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade.Details
removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade. | $95,000 |
| Nov 24, 2021 | Completed final sign-off Nov 2022 | 59 Mirabel Av | Spryscapes Const Inc. | in-kind replacement of (e) damanged wood stairs and decks due to dry-rot.Details
in-kind replacement of (e) damanged wood stairs and decks due to dry-rot. | $15,000 |
| Oct 21, 2021 | Never finaled issued Aug 2023, no final | 2303 Filbert St | Andrew Mark Construction Inc | new 221 sq foot greenhouse and mezzaine at (e) roof deck, (n) roof deck, (n) pneumatic elevator from ground floor up to (e) roof deckDetails
new 221 sq foot greenhouse and mezzaine at (e) roof deck, (n) roof deck, (n) pneumatic elevator from ground floor up to (e) roof deck | $60,000 |
| Sep 17, 2021 | Completed final sign-off Jan 2022 | 145 Saint Elmo Wy | Sf Town Builders Inc | landscape retaining structural wall.Details
landscape retaining structural wall. | $5,000 |
| Aug 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2266 Bay St | new 474 sq. ft. roof deck permit.Details
new 474 sq. ft. roof deck permit. | $100,000 | |
| Aug 16, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | Rod Heisler Construction | revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov.Details
revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov. | |
| Jun 1, 2021 | Completed final sign-off Apr 2025 | 2872 Pine St | D K G Construction Inc | (n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel.Details
(n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel. | $200,000 |
| May 21, 2021 | Completed final sign-off Feb 2022 | 146 Gambier St | Mela Construction Co | new wood deck <10' above grade with cable rail & metal panel guardrails, planters, new swing door with sidelight.Details
new wood deck <10' above grade with cable rail & metal panel guardrails, planters, new swing door with sidelight. | $15,000 |
| Feb 19, 2021 | Completed final sign-off Aug 2024 | 620 Myra Wy | Arroyo Realty & Development Llc | renovation of level 2 kitchen & bathroom & level 1 bathroom. all exteiror windows to be replce in-kind with an additional skylight at roof & windows at rear. no other work.Details
renovation of level 2 kitchen & bathroom & level 1 bathroom. all exteiror windows to be replce in-kind with an additional skylight at roof & windows at rear. no other work. | $60,000 |
| Feb 12, 2021 | Expired or cancelled expired Dec 2025 | 1660 Page St | Harmony Design & Development Inc | rebuild extg exterior stair of rear of extg structural with new code compliant guard rail.Details
rebuild extg exterior stair of rear of extg structural with new code compliant guard rail. | $15,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2023 | 3542 Scott St | Zack De Vito Inc | interior renovations to a residential unit. existing bathroom remodel. (n) master bathroom, (n) walk-in closet, (n) linen closets.Details
interior renovations to a residential unit. existing bathroom remodel. (n) master bathroom, (n) walk-in closet, (n) linen closets. | $30,000 |
| Aug 21, 2020 | Completed final sign-off Aug 2021 | 2170 Bryant St | Northern Sun Associates | new operator taking over (e) restaurant. work to include remodeled kitchen and prep areas; remodel ada bathrooms, new mep (hvac, electrical/lighting and plumbing) work. restaurant will change from b to a-2 occupancyDetails
new operator taking over (e) restaurant. work to include remodeled kitchen and prep areas; remodel ada bathrooms, new mep (hvac, electrical/lighting and plumbing) work. restaurant will change from b to a-2 occupancy | $340,000 |
| Apr 18, 2019 | Completed final sign-off May 2024 | 805 Clayton St | Hive Builds Inc. | revision to pa 2016-1020-0738 - eliminate basement level; eliminate car lift; eliminate 60 min rated skylight @ side passage; modify layout of unit 807, 1st floor; modify rear exit stair layoutDetails
revision to pa 2016-1020-0738 - eliminate basement level; eliminate car lift; eliminate 60 min rated skylight @ side passage; modify layout of unit 807, 1st floor; modify rear exit stair layout | |
| Apr 1, 2019 | Completed final sign-off Feb 2021 | 725 44th Av | Fox Brothers Construction Inc, Associated Trucking Inc | horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading.Details
horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading. | $300,000 |
| Mar 18, 2019 | Completed final sign-off Mar 2020 | 428 Lyon St | M J C Construction | interior reno of all 3 levels plus abatement of nov 201896283 - provide smoke and carbon monoxide detctors, provide fire extinguishers type 2a 10bc & provide self closing devices & primary locking device @ exterior doors. comply with nov 201896283 items 3, 4 and 5Details
interior reno of all 3 levels plus abatement of nov 201896283 - provide smoke and carbon monoxide detctors, provide fire extinguishers type 2a 10bc & provide self closing devices & primary locking device @ exterior doors. comply with nov 201896283 items 3, 4 and 5 | $400,000 |
| Jun 26, 2018 | Completed final sign-off Mar 2021 | 3550 22nd St | San Francisco Design Build | change of use from commercial to residential on the ground floor. per unit legalization ord# 43-14.Details
change of use from commercial to residential on the ground floor. per unit legalization ord# 43-14. | |
| Nov 8, 2017 | Completed final sign-off May 2018 | 3930 Washington St | Citidev Inc. | cut underside of stair back at extg angled wall. n/a for maherDetails
cut underside of stair back at extg angled wall. n/a for maher | $5,000 |
| Oct 19, 2017 | Completed final sign-off Oct 2022 | 880 Waller St | Terence Mcmahon Construction | rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired.Details
rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired. | $60,000 |
| Aug 17, 2017 | Completed final sign-off Aug 2018 | 454 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | soft story retrofit pser sfebc chapter 4d, 2016 cebc appendix a-4, new type shear walls, steel column retrofit inside garage at 6 location and steel column retrofit at front of building at 2 location.Details
soft story retrofit pser sfebc chapter 4d, 2016 cebc appendix a-4, new type shear walls, steel column retrofit inside garage at 6 location and steel column retrofit at front of building at 2 location. | $40,000 |
| Aug 17, 2017 | Expired or cancelled cancelled Oct 2024 | 668 Guerrero St | Citidev Inc. | demolition of a 1-story warehouse.Details
demolition of a 1-story warehouse. | $25,000 |
| Feb 8, 2017 | Completed final sign-off Feb 2019 | 1436 Jefferson St | revision to app#201604074202: new foundation grade beam at grid line 2. modification of wall footings along g.l. a+c at rear of bldg. modification of steel tube col. size. n/a for maher.Details
revision to app#201604074202: new foundation grade beam at grid line 2. modification of wall footings along g.l. a+c at rear of bldg. modification of steel tube col. size. n/a for maher. | ||
| Sep 16, 2016 | Completed final sign-off May 2017 | 1775 Green St | Kl Construction Group | revision to app#201603162173 to reframe ceiling.Details
revision to app#201603162173 to reframe ceiling. | $2,000 |
| May 18, 2016 | Completed final sign-off Oct 2016 | 262 15th Av | Snyder Construction | revision to pa# 201512144918. revision to concrete foundation, new posts at (e) beam.Details
revision to pa# 201512144918. revision to concrete foundation, new posts at (e) beam. | |
| Mar 18, 2016 | Expired or cancelled cancelled Oct 2024 | 668 Guerrero St | Citidev Inc. | to erect 4 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
to erect 4 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $1,900,000 |
| Dec 14, 2015 | Completed final sign-off Oct 2016 | 262 15th Av | Snyder Construction | renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar.Details
renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar. | $50,000 |
| Oct 2, 2015 | Never finaled issued Sep 2016, no final | 844 Duncan St | Green City Construction Inc | vertical addition to (e) bldg including bathroom. renovation & seismic retrofit to (e) structure & addition of 1-level with 1,000 sf of living space.Details
vertical addition to (e) bldg including bathroom. renovation & seismic retrofit to (e) structure & addition of 1-level with 1,000 sf of living space. | $575,000 |
| Jul 16, 2015 | Completed final sign-off Jul 2017 | 4376 24th St | Pegasus Builders | structural revision to g/f level to pa#201301168071Details
structural revision to g/f level to pa#201301168071 | |
| Mar 27, 2015 | Completed final sign-off Nov 2015 | 1731 Larkin St | Citidev Inc. | revision to app#2013-0215-0320: reconfiguration of structural elements.Details
revision to app#2013-0215-0320: reconfiguration of structural elements. | |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 50 Ulloa St | Tremin Corp/Bay West Builders | move entrace from 2nd fl west side to 1st fl west side. convert 340 sf of garage to habitable space. move kitchen, new nd fl bath. new french doors, 3 at 1st fl rear. new 296 sf deck in rearDetails
move entrace from 2nd fl west side to 1st fl west side. convert 340 sf of garage to habitable space. move kitchen, new nd fl bath. new french doors, 3 at 1st fl rear. new 296 sf deck in rear | $180,000 |
| Oct 9, 2014 | Completed final sign-off Apr 2016 | 1049 Church St | Citidev Inc. | revision to 201305096527:increase height of short retaining wall to garage remodel. stairs adjusted accordingly + new stairs on grade @ south side and revised roof sheathingDetails
revision to 201305096527:increase height of short retaining wall to garage remodel. stairs adjusted accordingly + new stairs on grade @ south side and revised roof sheathing | $5,000 |
| Sep 11, 2014 | Completed final sign-off Nov 2017 | 140 Ellis St | C B 2 Builders Incorporated | new aluminum storefront system to replace existing. new steel/glass canopy above lobby entrance. sprinklers under separate permit for canopy. n/a for maher ordinance155-13.Details
new aluminum storefront system to replace existing. new steel/glass canopy above lobby entrance. sprinklers under separate permit for canopy. n/a for maher ordinance155-13. | $128,000 |
| May 28, 2014 | Expired or cancelled cancelled Aug 2022 | 330 Bocana St | new roof deck, new interior stairs to roof w/ stairs penthouse, modify roof line at attic.Details
new roof deck, new interior stairs to roof w/ stairs penthouse, modify roof line at attic. | $40,000 | |
| Apr 3, 2014 | Expired or cancelled cancelled Jan 2020 | 2419 Lombard St | C B W Construction Inc. | erect 4-story, type 5, 1 basement, 11 units condo with commercial building.Details
erect 4-story, type 5, 1 basement, 11 units condo with commercial building. | $2,950,000 |
| Feb 10, 2014 | Never finaled issued Feb 2014, no final | 446 16th Av | C & N Construction | revision to app#201201182458. revision include revised lighting plan, 2 new skylights, reconfiguration of bathrooms and minor adjustments to windows at rear elevation.Details
revision to app#201201182458. revision include revised lighting plan, 2 new skylights, reconfiguration of bathrooms and minor adjustments to windows at rear elevation. | $30,000 |
| Sep 26, 2013 | Expired or cancelled cancelled Jan 2016 | 2044 Jefferson St | in-fill balcony @2nd floor, 52 sq. ft. of (n) habitable space, in-fill lightwell @ 1/f, 11 sq. ft. of (n) habit. space, enlarge roof deck at 4/f level and new windscreens, new exterior stairs from 4/f, deck to unoccupied roofDetails
in-fill balcony @2nd floor, 52 sq. ft. of (n) habitable space, in-fill lightwell @ 1/f, 11 sq. ft. of (n) habit. space, enlarge roof deck at 4/f level and new windscreens, new exterior stairs from 4/f, deck to unoccupied roof | $25,000 |