Kevin Skiles
- Listed as
- architect, authorized agent-others, designer
- Firm
- Zack/Devito Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2026
49 permits since 2000 (architect on 40 permits, authorized agent-others on 8 permits, designer on 1 permit): 30 completed, 7 in progress, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 233 30th St | Mireles Construction Inc | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.Details
replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 732 Brannan St | Brennan Strong Hold Construction Inc | renovation of interior office space, installation of new steel stair, installation of new non-structural partitions, and installation of new light fixtureDetails
renovation of interior office space, installation of new steel stair, installation of new non-structural partitions, and installation of new light fixture | $985,500 |
| May 21, 2026 | In progress issued Jun 2026 | 231 30th St | Mireles Construction Inc | interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.Details
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. | $82,000 |
| May 7, 2026 | In progress issued Aug 2026 | 732 Brannan St | Brennan Strong Hold Construction Inc | renovation of exterior facade: refruburisment of one storefront door, removal of one store front door, replacement of 2 mandoors with 1 roll-up door and installation of new mandoor.Details
renovation of exterior facade: refruburisment of one storefront door, removal of one store front door, replacement of 2 mandoors with 1 roll-up door and installation of new mandoor. | $42,500 |
| Mar 19, 2026 | In progress filed Mar 2026, not yet issued | 732 Brannan St | Cal C A D E Construction Inc | soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work.Details
soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work. | $11,200 |
| Apr 29, 2025 | Completed final sign-off Jun 2025 | 2750 Scott St | Mireles Construction Inc | replacement of (e) sliding glass door with sliding glass window not street visibleDetails
replacement of (e) sliding glass door with sliding glass window not street visible | $800 |
| Jan 16, 2025 | In progress issued Jan 2025 | 2247 Clement St | Mireles Construction Inc | revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building.Details
revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building. | |
| Oct 6, 2023 | Expired or cancelled withdrawn Aug 2025 | 564 Commercial St | replace 2 (e) doors and 1 window w/ new store front door and windows.Details
replace 2 (e) doors and 1 window w/ new store front door and windows. | $10,000 | |
| Aug 9, 2023 | Completed final sign-off Aug 2023 | 158 08th Av | Zack De Vito Inc | to obtain final inspection for work approved under permit 202103096213. all work is complete.Details
to obtain final inspection for work approved under permit 202103096213. all work is complete. | |
| Aug 2, 2023 | Expired or cancelled expired Aug 2025 | 564 Commercial St | Modern Construction Inc | base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenetteDetails
base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenette | $165,000 |
| Jun 22, 2023 | Completed final sign-off Jul 2024 | 2181 09th Av | Zack De Vito Inc | revision to pa 202205063689. additional interior work: electrical and plumbing fixtures and finishes to upper basement and 1/f. no exterior work.Details
revision to pa 202205063689. additional interior work: electrical and plumbing fixtures and finishes to upper basement and 1/f. no exterior work. | $35,000 |
| May 19, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | Zack De Vito Inc | repplace exisitng single pane alum windows in livingroom, kitchen & bedrooms, operation to match exisitng. u-fact of new windows max 0.30 replace existing open wire panels at balcony railing with glass panels. same size & location.Details
repplace exisitng single pane alum windows in livingroom, kitchen & bedrooms, operation to match exisitng. u-fact of new windows max 0.30 replace existing open wire panels at balcony railing with glass panels. same size & location. | $9,200 |
| May 18, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | Zack De Vito Inc | unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior workDetails
unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior work | $125,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1132 Masonic Av | Mireles Construction Inc | revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes.Details
revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes. | $26,000 |
| Mar 9, 2023 | Expired or cancelled expired Aug 2025 | 564 Commercial St | Modern Construction Inc | soft demo of interior tenant improvements on ground flr of bldg including fixtures, furniture and non-structural partitions, storage mezzanine and stairs to access mezzanine to be removed. no structural work, no exterior work. no work on floors 2 or 3. under ab-017Details
soft demo of interior tenant improvements on ground flr of bldg including fixtures, furniture and non-structural partitions, storage mezzanine and stairs to access mezzanine to be removed. no structural work, no exterior work. no work on floors 2 or 3. under ab-017 | $10,000 |
| Mar 3, 2023 | Expired or cancelled expired Jun 2023 | 732 33rd Av | Mireles Construction Inc | bathroom removal of stall shower addition of 1 toilet and 1 vanityDetails
bathroom removal of stall shower addition of 1 toilet and 1 vanity | $14,000 |
| Dec 27, 2022 | In progress issued Oct 2023 | 1100 Revere Av | to erect a one-story, type 3-b, warehouse.Details
to erect a one-story, type 3-b, warehouse. | $1,250,000 | |
| Dec 27, 2022 | Completed final sign-off Dec 2024 | 1100 Revere Av | demolish one-story type 3-b warehouseDetails
demolish one-story type 3-b warehouse | $32,000 | |
| Dec 9, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | Zack De Vito Inc, Aaron Gordon Construction Inc | new proposed roof deck to existing 3-story building.Details
new proposed roof deck to existing 3-story building. | $15,000 |
| Oct 21, 2022 | Never finaled filed Oct 2022, never issued | 440 Bryant St | change of use from (e) warehouse to office. no work performed under this permit application.Details
change of use from (e) warehouse to office. no work performed under this permit application. | ||
| Aug 8, 2022 | Completed final sign-off Aug 2022 | 730 33rd Av | Handyman Heroes Inc. | install 2 custom wood guardrails at rear of property.Details
install 2 custom wood guardrails at rear of property. | $200 |
| Jul 19, 2022 | Completed final sign-off Mar 2023 | 959 Corbett Av | Handyman Heroes Inc. | hook up washer/ dryer in kind same location no movement to walls- hoa required. replace inkind existing location.Details
hook up washer/ dryer in kind same location no movement to walls- hoa required. replace inkind existing location. | $15,000 |
| Feb 1, 2022 | Completed final sign-off Aug 2023 | 683 28th Av | W J L Construction Inc | garage level excavate rear to allow for 8' ceiling in renovated spaces to create a conditioned office workshop w/powder bath. all added conditioned space w/ in (e) bldg envelope.Details
garage level excavate rear to allow for 8' ceiling in renovated spaces to create a conditioned office workshop w/powder bath. all added conditioned space w/ in (e) bldg envelope. | $75,000 |
| Jan 12, 2022 | Completed final sign-off Nov 2022 | 1606 Vallejo St | Design Line Construction | revision to pa# 202107083935. no load bearing walls are being removed. revision adds renovation of 3 baths. replacement of 3 french doors, 2 windows, fau & addition of mini split.Details
revision to pa# 202107083935. no load bearing walls are being removed. revision adds renovation of 3 baths. replacement of 3 french doors, 2 windows, fau & addition of mini split. | $50,000 |
| Sep 6, 2019 | Completed final sign-off May 2021 | 571 02nd Av | Mireles Construction Inc | renovation of (e) laundry room & construction of addition under (e) deck to create 2 new bedroom. reconstruction of (e) deck on roof of additon.Details
renovation of (e) laundry room & construction of addition under (e) deck to create 2 new bedroom. reconstruction of (e) deck on roof of additon. | $55,000 |
| Apr 19, 2019 | Completed final sign-off Apr 2021 | 651 11th Av | W J L Construction Inc | kitchen renovation and construction of master bath on main level.enclosure of space under sun room, bathroom & laundry renovationDetails
kitchen renovation and construction of master bath on main level.enclosure of space under sun room, bathroom & laundry renovation | $150,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2017 | 55 Dolores St | M H M Construction | interior renovation at unit 3 at 55 dolores st. renovation includes construction of (n) 1/2 bath & renovation of (e) kitchen & bath. (n) dual glazed fiberglass windows to replace (e) windows. (n) high efficacy light installed throughoutDetails
interior renovation at unit 3 at 55 dolores st. renovation includes construction of (n) 1/2 bath & renovation of (e) kitchen & bath. (n) dual glazed fiberglass windows to replace (e) windows. (n) high efficacy light installed throughout | $45,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 800 Lyon St | Kashaneh Construction | interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage.Details
interior renovation of extg unit including expansion into extg storage space. work to include construction of new kitchen and 2.75 bathrooms. no exterior work and no increase to extg bldg sq footage. | $80,000 |
| Feb 25, 2015 | Completed final sign-off Dec 2015 | 322 Fair Oaks St | Icr Builders Inc | renovation of (e) kitchen and bath, construction of new master bath.Details
renovation of (e) kitchen and bath, construction of new master bath. | $45,000 |
| Dec 9, 2014 | Expired or cancelled cancelled Dec 2017 | 322 Fair Oaks St | demolishing of (e) retaining wall and horizontal addition of 417 sf 2-car garage.Details
demolishing of (e) retaining wall and horizontal addition of 417 sf 2-car garage. | $85,000 | |
| Nov 25, 2014 | Completed final sign-off Mar 2017 | 1070 Post St | M H M Construction | interior renovation of 6 units: const of 1(n) 1/2 bath in units 3&5, and 1 (n) full bath in units 2&4, (e) single pane windows to be replaced with (n) dual pane window @ light wells,(n) high efficacy lighting to be installed. some non load bearing walls to be removed; maher n/aDetails
interior renovation of 6 units: const of 1(n) 1/2 bath in units 3&5, and 1 (n) full bath in units 2&4, (e) single pane windows to be replaced with (n) dual pane window @ light wells,(n) high efficacy lighting to be installed. some non load bearing walls to be removed; maher n/a | $185,000 |
| Sep 9, 2014 | Never finaled issued Apr 2015, no final | 2209 Pacific Av | construction of a 323 sf single story non conditioned conservatory. this is a horizontal addition to the (e) structure. n/a for maher ordinance.Details
construction of a 323 sf single story non conditioned conservatory. this is a horizontal addition to the (e) structure. n/a for maher ordinance. | $250,000 | |
| Aug 15, 2014 | Completed final sign-off Mar 2015 | 1630 Union St | James A Keenan | #5- rev. pa#201407100988 elimination of (n) door actoator, addition (e) stair striping (visual warning), interior stair striping @ top & bottom tread and interior handrail returns.Details
#5- rev. pa#201407100988 elimination of (n) door actoator, addition (e) stair striping (visual warning), interior stair striping @ top & bottom tread and interior handrail returns. | $2,800 |
| Aug 13, 2014 | Completed final sign-off Oct 2015 | 324 Fair Oaks St | Icr Builders Inc | interior renovation to include new master bath, renovation of e bath. relocate non load bearing wall. new high efficacy lights. replacement of 3 exterior windows/doorsDetails
interior renovation to include new master bath, renovation of e bath. relocate non load bearing wall. new high efficacy lights. replacement of 3 exterior windows/doors | $40,000 |
| Jul 10, 2014 | Completed final sign-off Mar 2015 | 1630 Union St | James A Keenan | #5- removal of non-load bearing partitions. new paint and carpet. new door hardware. replace 1 exterior door at rear.Details
#5- removal of non-load bearing partitions. new paint and carpet. new door hardware. replace 1 exterior door at rear. | $14,000 |
| Aug 26, 2013 | Completed final sign-off Oct 2014 | 1073 Treat Av | M H M Construction | interior renovation of 3 units of a 4 unit building, work includes 3 kitchens & baths, construct 3 new baths, 1 to each of the units.Details
interior renovation of 3 units of a 4 unit building, work includes 3 kitchens & baths, construct 3 new baths, 1 to each of the units. | $202,751 |
| Aug 22, 2013 | Expired or cancelled withdrawn May 2014 | 132 Presidio Av | interior remodel of (e) 3 unit levels, reconfiguration of bathroom and kitchen alteration. lateral strengthing and framing alteration. updating fixtures, expanding garage, replace windows, new skylights. private elevator under separate permit.Details
interior remodel of (e) 3 unit levels, reconfiguration of bathroom and kitchen alteration. lateral strengthing and framing alteration. updating fixtures, expanding garage, replace windows, new skylights. private elevator under separate permit. | $150,000 | |
| Feb 19, 2013 | Completed final sign-off May 2014 | 257 Sanchez St | Eagle Ridge Construction And Roofing | front facade renovation; window replacement, exterior finish replacement, front aluminum windows are being replaced w/ wood clad double glazed windows, 3 are being enlarged. (e) stucco is being removed and replaced w/ ipe siding & stucco.Details
front facade renovation; window replacement, exterior finish replacement, front aluminum windows are being replaced w/ wood clad double glazed windows, 3 are being enlarged. (e) stucco is being removed and replaced w/ ipe siding & stucco. | $20,000 |
| Dec 20, 2012 | Completed final sign-off Dec 2013 | 2133 Pine St | M H M Construction | renovation to kitchens, baths, removal of 1 wall on each floor level. replace secondary egress ship ladder with code compliant spiral stair. all windows under separate permitDetails
renovation to kitchens, baths, removal of 1 wall on each floor level. replace secondary egress ship ladder with code compliant spiral stair. all windows under separate permit | $155,000 |
| Dec 14, 2012 | Completed final sign-off May 2013 | 1094 Bush St | Malagic Construction | comply with complaint 201278121. repair and replace ceiling in retail ground floor with sheetrock.Details
comply with complaint 201278121. repair and replace ceiling in retail ground floor with sheetrock. | $6,000 |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 370 Ellis St | Eagle Ridge Construction And Roofing | fur out interior of exterior wall as per plan's keynotes 2 for 24 units.Details
fur out interior of exterior wall as per plan's keynotes 2 for 24 units. | $30,000 |
| Nov 14, 2012 | Completed final sign-off Jun 2013 | 1750 Anza St | to comply w/ nov# 200904375. remove unpermitted offices; restore to previous use of storage. remove shower; install powder room w/ sink & vanity.Details
to comply w/ nov# 200904375. remove unpermitted offices; restore to previous use of storage. remove shower; install powder room w/ sink & vanity. | ||
| Nov 8, 2012 | Completed final sign-off Sep 2013 | 132 Presidio Av | M H M Construction | removal of illegal non conforming 1st level unit 136a presidio. convert space back to legal storage use, repair any damage to adjacent finishes.Details
removal of illegal non conforming 1st level unit 136a presidio. convert space back to legal storage use, repair any damage to adjacent finishes. | $5,000 |
| Dec 16, 2011 | Completed final sign-off Nov 2012 | 591 Waller St | as built drawing submital for record. minor revision to foundation and shear walls system to comply with extg field conditions. revision to app#201106299165 and 201109295800. reviewed by fire, no inspection required, documentation of structural work done. no change to life safety.Details
as built drawing submital for record. minor revision to foundation and shear walls system to comply with extg field conditions. revision to app#201106299165 and 201109295800. reviewed by fire, no inspection required, documentation of structural work done. no change to life safety. | ||
| Sep 29, 2011 | Completed final sign-off Nov 2012 | 591 Waller St | revision to 201109164858, structural details for relocation of room dormer from west side of roof to east side. correct wording from remove dormer to relocate dormer.Details
revision to 201109164858, structural details for relocation of room dormer from west side of roof to east side. correct wording from remove dormer to relocate dormer. | ||
| Sep 16, 2011 | Completed final sign-off Nov 2012 | 591 Waller St | correct nov 201152594 for app 201106299165: to document for planning on architectural drawings that at west elevation, existing window to remain, preserve belly band detail, and eliminate new dormer windows from scopeDetails
correct nov 201152594 for app 201106299165: to document for planning on architectural drawings that at west elevation, existing window to remain, preserve belly band detail, and eliminate new dormer windows from scope | ||
| Jan 29, 2007 | Never finaled issued Jan 2007, no final | 514 04th Av | stairs built from existing back deck to backyard.Details
stairs built from existing back deck to backyard. | $800 | |
| Dec 17, 2004 | Completed final sign-off Mar 2006 | 2367 Market St | interior imporvements to restrauant space new ada accessible bathrm,new storefront/booth/furnitureDetails
interior imporvements to restrauant space new ada accessible bathrm,new storefront/booth/furniture | $43,000 | |
| Dec 17, 2004 | Completed final sign-off Apr 2005 | 1610 Evans Av | O'grady Plumbing | extend mezzine add stair. no exterior work.Details
extend mezzine add stair. no exterior work. | $20,000 |