Block 6657, lot 041
233 30th St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 4 bathrooms
- Building
- 2,650 sq ft
- Lot
- 3,301 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Nov 2026 | 233 30th St | Mireles Construction Inc | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.Details
replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |
| May 21, 2026 | In progress issued Jun 2026 | 231 30th St | Mireles Construction Inc | interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.Details
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. | $82,000 |
| Jul 12, 2022 | Never finaled issued Jul 2022, no final | 233 30th St | J E T Windows | remove e wood d-h and replace with marvin wood tilt pacs with oval lowe glass. all meet title 24. all with og lugs, 18 windowsDetails
remove e wood d-h and replace with marvin wood tilt pacs with oval lowe glass. all meet title 24. all with og lugs, 18 windows | $26,000 |
| May 24, 2022 | Completed final sign-off Nov 2022 | 233 30th St | Creekside Pro Construction Inc | adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area.Details
adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area. | $8,000 |
| Apr 14, 2022 | Completed final sign-off Dec 2022 | 233 30th St | Creekside Pro Construction Inc | (1) kitchen and (1) bathroom remodling like to like. add a subpanel of 60 amp. non structuralDetails
(1) kitchen and (1) bathroom remodling like to like. add a subpanel of 60 amp. non structural | $30,000 |
| Feb 15, 2022 | Completed final sign-off Feb 2022 | 231 30th St | administrative permit to document structure as a 3-story w/2-dwelling units. this determiniation is based on a site visit & review of city records that include sanborn maps, water department & dbi documentsDetails
administrative permit to document structure as a 3-story w/2-dwelling units. this determiniation is based on a site visit & review of city records that include sanborn maps, water department & dbi documents | ||
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 231 30th St | street space | ||
| Mar 21, 2016 | Completed final sign-off May 2016 | 231 30th St | Adan Flores General Contractor | to rebuild damaged retaining wall @ front of building. existing railing will be removed & reused in new wall. no work to be performed in other areas.Details
to rebuild damaged retaining wall @ front of building. existing railing will be removed & reused in new wall. no work to be performed in other areas. | $10,000 |
| Dec 18, 2009 | Expired or cancelled cancelled Aug 2021 | 231 30th St | Sears Home Improvemt Prod, | install vinyl siding to the back& right sides of house only not visible from the street no structural changes 1188 sqft.Details
install vinyl siding to the back& right sides of house only not visible from the street no structural changes 1188 sqft. | $13,400 |
| Mar 10, 2003 | Completed final sign-off Mar 2003 | 231 30th St | Standardconstr/Standardroof | reroofingDetails
reroofing | $12,915 |
| Mar 7, 2003 | Expired or cancelled cancelled Nov 2024 | 231 30th St | Standardconstr/Standardroof | reroofing |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Creekside Pro Construction Inc (2), Mireles Construction Inc (2), Standardconstr/Standardroof (2), Adan Flores General Contractor, J E T Windows, Sears Home Improvemt Prod,
- Architects
- Kevin Skiles (2)
- Engineers
- Luis E. Rodriguez, Micheal Chan
- Authorized agents
- Manuel Herrera
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.