Mireles Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2018 to Sep 2026
- Last 24 months
- 18 permits filed
65 permits since 2000: 50 completed, 7 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 233 30th St | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.Details
replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |
| Sep 14, 2026 | In progress issued Sep 2026 | 1615 Greenwich St | recommencement and completion of work approved under pa# 200107194073.Details
recommencement and completion of work approved under pa# 200107194073. | $500 |
| May 21, 2026 | In progress issued Jun 2026 | 231 30th St | interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.Details
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. | $82,000 |
| May 21, 2026 | Completed final sign-off May 2026 | 1132 Masonic Av | to obtain final inspection for work approved under pa# 202303284529 & 202303032979. all work is complete.Details
to obtain final inspection for work approved under pa# 202303284529 & 202303032979. all work is complete. | |
| May 19, 2026 | Completed final sign-off Sep 2026 | 721 Bay St | to obtain final inspection for work approved under pa# 202108055834, 202109299512. all work is complete.Details
to obtain final inspection for work approved under pa# 202108055834, 202109299512. all work is complete. | $25,000 |
| Apr 6, 2026 | Completed final sign-off Jul 2026 | 4119 Irving St | bathroom remodel in-kind: replace toilet, tiles, sinks, faucets.Details
bathroom remodel in-kind: replace toilet, tiles, sinks, faucets. | $20,000 |
| Jan 21, 2026 | In progress issued Jan 2026 | 2262 Filbert St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Sep 10, 2025 | Completed final sign-off Mar 2026 | 347 San Benito Wy | bathroom remodel in kind. approx 48 sq ft.Details
bathroom remodel in kind. approx 48 sq ft. | $22,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 700 12th Av | unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances.Details
unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances. | $15,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 726 33rd Av | revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroomDetails
revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroom | |
| Jul 8, 2025 | Completed final sign-off Apr 2026 | 700 12th Av | unit #4: remodel one (e) bathroom in kind. no moving walls. fixtures to remain in the same location. approx. 48 sq ft.Details
unit #4: remodel one (e) bathroom in kind. no moving walls. fixtures to remain in the same location. approx. 48 sq ft. | $9,500 |
| Jun 13, 2025 | Completed final sign-off Dec 2025 | 726 33rd Av | remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sqDetails
remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sq | $15,000 |
| May 21, 2025 | Completed final sign-off Jul 2025 | 3714 Fillmore St | remodel bathroom in kind. no layout changes. no removal of wallsDetails
remodel bathroom in kind. no layout changes. no removal of walls | $26,000 |
| Apr 29, 2025 | Completed final sign-off Jun 2025 | 2750 Scott St | replacement of (e) sliding glass door with sliding glass window not street visibleDetails
replacement of (e) sliding glass door with sliding glass window not street visible | $800 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 36 Palm Av | remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft.Details
remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft. | $29,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 2247 Clement St | revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building.Details
revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building. | |
| Dec 9, 2024 | Completed final sign-off Jun 2025 | 82 Stanford Heights Av | conversion of (e) storage/workshop into music room with 1/2 bath below the garageDetails
conversion of (e) storage/workshop into music room with 1/2 bath below the garage | $25,000 |
| Dec 6, 2024 | Completed final sign-off Dec 2024 | 1889 16th Av | install dryer vent duct in garage area.Details
install dryer vent duct in garage area. | $1,200 |
| Oct 2, 2024 | In progress issued Oct 2024 | 2247 Clement St | remodel kitchen and bathroom no layout changesDetails
remodel kitchen and bathroom no layout changes | $39,000 |
| Sep 13, 2024 | Completed final sign-off Oct 2024 | 278 Randall St | replace subfloor plywood in kind damage by water leak in the lower unit - about 300 sf. in kindDetails
replace subfloor plywood in kind damage by water leak in the lower unit - about 300 sf. in kind | $19,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2024 | 1545 Greenwich St | open wall in storage room to renew electricity and plumbing to install 2 washers and 2 dryers. storage room is located in garage area. patch back in kind.Details
open wall in storage room to renew electricity and plumbing to install 2 washers and 2 dryers. storage room is located in garage area. patch back in kind. | $12,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2024 | 82 Stanford Heights Av | replace bath-tub, wall tiles, floor tiles not lay-out changes at existing bath room.Details
replace bath-tub, wall tiles, floor tiles not lay-out changes at existing bath room. | $18,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 1539 Greenwich St | open wall on store room to run electricity and plumbing to install 2 w&d located at garage areaDetails
open wall on store room to run electricity and plumbing to install 2 w&d located at garage area | $12,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 581 14th Av | unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal.Details
unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal. | $35,000 |
| Apr 8, 2024 | Completed final sign-off Mar 2025 | 700 12th Av | replace damage wood in 2 landing of emergency stairs, not to exceed 50% repair or replacement.Details
replace damage wood in 2 landing of emergency stairs, not to exceed 50% repair or replacement. | $5,000 |
| Feb 20, 2024 | Completed final sign-off Mar 2024 | 730 33rd Av | build wall in living room to create new officeDetails
build wall in living room to create new office | $9,000 |
| Jan 10, 2024 | Completed final sign-off May 2024 | 581 14th Av | unit#2: remodel one kitchen and one bathroom no lay-out changesDetails
unit#2: remodel one kitchen and one bathroom no lay-out changes | $35,000 |
| Aug 25, 2023 | Completed final sign-off Oct 2023 | 728 33rd Av | construction of new non-load bearing partition.Details
construction of new non-load bearing partition. | $4,000 |
| Jun 22, 2023 | Completed final sign-off Jul 2023 | 2736 44th Av | revision to pa# 202203049243, to remove skylight from scope of workDetails
revision to pa# 202203049243, to remove skylight from scope of work | |
| Jun 12, 2023 | Completed final sign-off Aug 2023 | 58 Havelock St | rev to pa202009011968: only change of rear guardrail type.Details
rev to pa202009011968: only change of rear guardrail type. | |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 58 Havelock St | revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval.Details
revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval. | |
| May 12, 2023 | Completed final sign-off Jun 2023 | 3714 Fillmore St | repair emergency stairs less than 50% on the side of buildingDetails
repair emergency stairs less than 50% on the side of building | $12,000 |
| May 8, 2023 | Completed final sign-off Jan 2024 | 2147 Mason St | remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with newDetails
remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with new | $4,300 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1132 Masonic Av | revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes.Details
revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes. | $26,000 |
| Mar 20, 2023 | Completed final sign-off Jun 2023 | 730 33rd Av | administration permit to correct address from 732 33rd av to 730 33rd av (same building) ref to 202303032982Details
administration permit to correct address from 732 33rd av to 730 33rd av (same building) ref to 202303032982 | |
| Mar 3, 2023 | Expired or cancelled expired Jun 2023 | 732 33rd Av | bathroom removal of stall shower addition of 1 toilet and 1 vanityDetails
bathroom removal of stall shower addition of 1 toilet and 1 vanity | $14,000 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 1132 Masonic Av | bathroom remodel- replace bath- tub replace tile replace shower valves, eplace existing door, install new sink. replace in kind.Details
bathroom remodel- replace bath- tub replace tile replace shower valves, eplace existing door, install new sink. replace in kind. | $26,000 |
| Mar 2, 2023 | Completed final sign-off Jun 2023 | 209 Stillings Av | remove siding on the back wall of the house, install new hardi-plank siding.Details
remove siding on the back wall of the house, install new hardi-plank siding. | $10,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 200 Brannan St | #108: replace kithen cabinets, run 220 w for new stove, add recess light on kitchen, install new hardwood floor. non structural.Details
#108: replace kithen cabinets, run 220 w for new stove, add recess light on kitchen, install new hardwood floor. non structural. | $21,000 |
| Oct 28, 2022 | Completed final sign-off Nov 2022 | 1346 16th Av | remove deck flooring and fence in lightwell on southside of bldg. violation #202294262 and bid cts 2022294407Details
remove deck flooring and fence in lightwell on southside of bldg. violation #202294262 and bid cts 2022294407 | $500 |
| Oct 6, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | removel of front stair finishes existing and proposed brick inkind replacement. no structural.Details
removel of front stair finishes existing and proposed brick inkind replacement. no structural. | $15,000 |
| Sep 7, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg.Details
revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg. | |
| Aug 19, 2022 | Completed final sign-off Sep 2022 | 360 29th Av | repair dryrot wood on emergency stairs less than 50%. not visible from the street.Details
repair dryrot wood on emergency stairs less than 50%. not visible from the street. | $3,000 |
| Jun 8, 2022 | Completed final sign-off Aug 2022 | 1715 Green St | bathroom remodel, replace bathtub, toilet, tile, vanity.Details
bathroom remodel, replace bathtub, toilet, tile, vanity. | $15,000 |
| Mar 4, 2022 | Completed final sign-off Jul 2023 | 2736 44th Av | new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east)Details
new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east) | $100,000 |
| Feb 23, 2022 | Expired or cancelled withdrawn Jun 2022 | 1715 Green St | replace existing wood stair in kind (back of the house)Details
replace existing wood stair in kind (back of the house) | $8,000 |
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 106 Ord St | emergency repair on stairway landing floor and railing. (replace flooring on landing, replace 2 x 2 railing) less than 50% repairDetails
emergency repair on stairway landing floor and railing. (replace flooring on landing, replace 2 x 2 railing) less than 50% repair | $3,000 |
| Feb 3, 2022 | Completed final sign-off May 2022 | 48 Winfield St | replace (e) back stairs in-kind.Details
replace (e) back stairs in-kind. | $5,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2022 | 2854 Bush St | bathroom remodel, replace tile, bath tub, shower valve floor tile, toilet, vanity. no lay out changes.Details
bathroom remodel, replace tile, bath tub, shower valve floor tile, toilet, vanity. no lay out changes. | $12,000 |
| Nov 12, 2021 | Completed final sign-off Jan 2022 | 48 Winfield St | remove damaged siding on one side of the building about 300 sf, replace with hardi plank siding.Details
remove damaged siding on one side of the building about 300 sf, replace with hardi plank siding. | $4,500 |
| Nov 12, 2021 | Completed final sign-off Feb 2022 | 6945 Geary Bl | demo damaged stucco wall about 200 sf, install wire and new stucco. all work at side of house.Details
demo damaged stucco wall about 200 sf, install wire and new stucco. all work at side of house. | $6,000 |
| Oct 20, 2021 | Completed final sign-off Mar 2022 | 1715 Green St | remove existing deck above sun-room in order to replace roof membrane and damage wood caused by water penetration, frame back deck in kind.Details
remove existing deck above sun-room in order to replace roof membrane and damage wood caused by water penetration, frame back deck in kind. | $9,000 |
| Oct 20, 2021 | Completed final sign-off Dec 2021 | 1715 Green St | reroofingDetails
reroofing | $7,000 |
| Jul 22, 2021 | Never finaled issued Jul 2021, no final | 241 Nevada St | replace kitchen cabinets, replace countertops, install new ceiling lights, rpelace hardwood floor.Details
replace kitchen cabinets, replace countertops, install new ceiling lights, rpelace hardwood floor. | $10,500 |
| Jun 30, 2021 | Completed final sign-off Oct 2021 | 170 Bridgeview Dr | remove (e) door and jamb, frame new opening in existing wall (3.0' x 6' x 8')Details
remove (e) door and jamb, frame new opening in existing wall (3.0' x 6' x 8') | $4,800 |
| Jun 10, 2021 | Completed final sign-off Feb 2022 | 741 Guerrero St | replace (6) window in the front of the building with marvin wood windowsDetails
replace (6) window in the front of the building with marvin wood windows | $9,100 |
| Oct 22, 2020 | Never finaled issued Oct 2020, no final | 347 San Benito Wy | remodel shower, change tile, relocate shower valve and floor drain. replace shower pan membraneDetails
remodel shower, change tile, relocate shower valve and floor drain. replace shower pan membrane | $11,000 |
| Jul 29, 2020 | Completed final sign-off Dec 2020 | 2736 44th Av | remodel kitchen & bathroom, no lay-out changesDetails
remodel kitchen & bathroom, no lay-out changes | $25,000 |
| Mar 12, 2020 | Completed final sign-off Jun 2020 | 620 Lake St | unit #2: replace tile, toilet, vanity, pocket door on garage level bathroom, new sheet rock and paint no lay-out changes. all work/replacement in kindDetails
unit #2: replace tile, toilet, vanity, pocket door on garage level bathroom, new sheet rock and paint no lay-out changes. all work/replacement in kind | $12,000 |
| Jan 15, 2020 | Completed final sign-off May 2020 | 725 Detroit St | (2) bathroom remodel on 2nd fl. same layout, replace bath-tub, toilet and vanity 0n (1) bathroom, replace toliet and vanity on (1) bathroom, replace tile on (2) bathroom, not lay-out changesDetails
(2) bathroom remodel on 2nd fl. same layout, replace bath-tub, toilet and vanity 0n (1) bathroom, replace toliet and vanity on (1) bathroom, replace tile on (2) bathroom, not lay-out changes | $12,000 |
| Sep 30, 2019 | Completed final sign-off Jun 2022 | 58 Leland Av | commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchenDetails
commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchen | $110,000 |
| Sep 6, 2019 | Completed final sign-off May 2021 | 571 02nd Av | renovation of (e) laundry room & construction of addition under (e) deck to create 2 new bedroom. reconstruction of (e) deck on roof of additon.Details
renovation of (e) laundry room & construction of addition under (e) deck to create 2 new bedroom. reconstruction of (e) deck on roof of additon. | $55,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 571 02nd Av | replace shower wall tiles and bathroom floor tiles. keep same layout. no change in lower level bathroom.Details
replace shower wall tiles and bathroom floor tiles. keep same layout. no change in lower level bathroom. | $4,000 |
| Apr 15, 2019 | Completed final sign-off May 2019 | 748 Baker St | replace damaged wood mouldings on top of the front windows and paint. new mouliding to match existing in material, dimensions and profile.Details
replace damaged wood mouldings on top of the front windows and paint. new mouliding to match existing in material, dimensions and profile. | $3,000 |
| Dec 18, 2018 | Completed final sign-off Feb 2020 | 140 Divisadero St | provide new private roof deck of 65 sq ft over existing unoccupied roof, over bay below existing 4th floor. provide new guard, provide new access door on 4th floor unit to deck.Details
provide new private roof deck of 65 sq ft over existing unoccupied roof, over bay below existing 4th floor. provide new guard, provide new access door on 4th floor unit to deck. | $4,500 |