Back to bathroom remodel contractors
Mireles Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2018 to Sep 2026
- Last 24 months
- 18 permits filed
65 permits since 2000: 50 completed, 7 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 16 completed, 5 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued Jun 2026 | 231 30th St | interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.Details
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. | $82,000 |
| Apr 6, 2026 | Completed final sign-off Jul 2026 | 4119 Irving St | bathroom remodel in-kind: replace toilet, tiles, sinks, faucets.Details
bathroom remodel in-kind: replace toilet, tiles, sinks, faucets. | $20,000 |
| Jan 21, 2026 | In progress issued Jan 2026 | 2262 Filbert St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Sep 10, 2025 | Completed final sign-off Mar 2026 | 347 San Benito Wy | bathroom remodel in kind. approx 48 sq ft.Details
bathroom remodel in kind. approx 48 sq ft. | $22,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 726 33rd Av | revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroomDetails
revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroom | |
| Jul 8, 2025 | Completed final sign-off Apr 2026 | 700 12th Av | unit #4: remodel one (e) bathroom in kind. no moving walls. fixtures to remain in the same location. approx. 48 sq ft.Details
unit #4: remodel one (e) bathroom in kind. no moving walls. fixtures to remain in the same location. approx. 48 sq ft. | $9,500 |
| Jun 13, 2025 | Completed final sign-off Dec 2025 | 726 33rd Av | remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sqDetails
remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sq | $15,000 |
| May 21, 2025 | Completed final sign-off Jul 2025 | 3714 Fillmore St | remodel bathroom in kind. no layout changes. no removal of wallsDetails
remodel bathroom in kind. no layout changes. no removal of walls | $26,000 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 36 Palm Av | remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft.Details
remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft. | $29,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 2247 Clement St | revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building.Details
revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building. | |
| Dec 9, 2024 | Completed final sign-off Jun 2025 | 82 Stanford Heights Av | conversion of (e) storage/workshop into music room with 1/2 bath below the garageDetails
conversion of (e) storage/workshop into music room with 1/2 bath below the garage | $25,000 |
| Oct 2, 2024 | In progress issued Oct 2024 | 2247 Clement St | remodel kitchen and bathroom no layout changesDetails
remodel kitchen and bathroom no layout changes | $39,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2024 | 82 Stanford Heights Av | replace bath-tub, wall tiles, floor tiles not lay-out changes at existing bath room.Details
replace bath-tub, wall tiles, floor tiles not lay-out changes at existing bath room. | $18,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 581 14th Av | unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal.Details
unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal. | $35,000 |
| Jan 10, 2024 | Completed final sign-off May 2024 | 581 14th Av | unit#2: remodel one kitchen and one bathroom no lay-out changesDetails
unit#2: remodel one kitchen and one bathroom no lay-out changes | $35,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1132 Masonic Av | revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes.Details
revision to bpa#202303032979, bathroom remodel: relocate bath tub, add toilet, replace tile, replace shower valve. layout changes. | $26,000 |
| Mar 3, 2023 | Expired or cancelled expired Jun 2023 | 732 33rd Av | bathroom removal of stall shower addition of 1 toilet and 1 vanityDetails
bathroom removal of stall shower addition of 1 toilet and 1 vanity | $14,000 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 1132 Masonic Av | bathroom remodel- replace bath- tub replace tile replace shower valves, eplace existing door, install new sink. replace in kind.Details
bathroom remodel- replace bath- tub replace tile replace shower valves, eplace existing door, install new sink. replace in kind. | $26,000 |
| Jun 8, 2022 | Completed final sign-off Aug 2022 | 1715 Green St | bathroom remodel, replace bathtub, toilet, tile, vanity.Details
bathroom remodel, replace bathtub, toilet, tile, vanity. | $15,000 |
| Mar 4, 2022 | Completed final sign-off Jul 2023 | 2736 44th Av | new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east)Details
new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east) | $100,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2022 | 2854 Bush St | bathroom remodel, replace tile, bath tub, shower valve floor tile, toilet, vanity. no lay out changes.Details
bathroom remodel, replace tile, bath tub, shower valve floor tile, toilet, vanity. no lay out changes. | $12,000 |
| Jul 29, 2020 | Completed final sign-off Dec 2020 | 2736 44th Av | remodel kitchen & bathroom, no lay-out changesDetails
remodel kitchen & bathroom, no lay-out changes | $25,000 |
| Mar 12, 2020 | Completed final sign-off Jun 2020 | 620 Lake St | unit #2: replace tile, toilet, vanity, pocket door on garage level bathroom, new sheet rock and paint no lay-out changes. all work/replacement in kindDetails
unit #2: replace tile, toilet, vanity, pocket door on garage level bathroom, new sheet rock and paint no lay-out changes. all work/replacement in kind | $12,000 |
| Jan 15, 2020 | Completed final sign-off May 2020 | 725 Detroit St | (2) bathroom remodel on 2nd fl. same layout, replace bath-tub, toilet and vanity 0n (1) bathroom, replace toliet and vanity on (1) bathroom, replace tile on (2) bathroom, not lay-out changesDetails
(2) bathroom remodel on 2nd fl. same layout, replace bath-tub, toilet and vanity 0n (1) bathroom, replace toliet and vanity on (1) bathroom, replace tile on (2) bathroom, not lay-out changes | $12,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 571 02nd Av | replace shower wall tiles and bathroom floor tiles. keep same layout. no change in lower level bathroom.Details
replace shower wall tiles and bathroom floor tiles. keep same layout. no change in lower level bathroom. | $4,000 |