Mireles Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2018 to Sep 2026
- Last 24 months
- 18 permits filed
65 permits since 2000: 50 completed, 7 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 233 30th St | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line.Details
replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |
| Apr 8, 2024 | Completed final sign-off Mar 2025 | 700 12th Av | replace damage wood in 2 landing of emergency stairs, not to exceed 50% repair or replacement.Details
replace damage wood in 2 landing of emergency stairs, not to exceed 50% repair or replacement. | $5,000 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 58 Havelock St | revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval.Details
revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval. | |
| May 12, 2023 | Completed final sign-off Jun 2023 | 3714 Fillmore St | repair emergency stairs less than 50% on the side of buildingDetails
repair emergency stairs less than 50% on the side of building | $12,000 |
| Oct 6, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | removel of front stair finishes existing and proposed brick inkind replacement. no structural.Details
removel of front stair finishes existing and proposed brick inkind replacement. no structural. | $15,000 |
| Sep 7, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg.Details
revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg. | |
| Aug 19, 2022 | Completed final sign-off Sep 2022 | 360 29th Av | repair dryrot wood on emergency stairs less than 50%. not visible from the street.Details
repair dryrot wood on emergency stairs less than 50%. not visible from the street. | $3,000 |
| Mar 4, 2022 | Completed final sign-off Jul 2023 | 2736 44th Av | new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east)Details
new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east) | $100,000 |
| Feb 23, 2022 | Expired or cancelled withdrawn Jun 2022 | 1715 Green St | replace existing wood stair in kind (back of the house)Details
replace existing wood stair in kind (back of the house) | $8,000 |
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 106 Ord St | emergency repair on stairway landing floor and railing. (replace flooring on landing, replace 2 x 2 railing) less than 50% repairDetails
emergency repair on stairway landing floor and railing. (replace flooring on landing, replace 2 x 2 railing) less than 50% repair | $3,000 |
| Feb 3, 2022 | Completed final sign-off May 2022 | 48 Winfield St | replace (e) back stairs in-kind.Details
replace (e) back stairs in-kind. | $5,000 |