Back to kitchen remodel contractors
Mireles Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2018 to Sep 2026
- Last 24 months
- 18 permits filed
65 permits since 2000: 50 completed, 7 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 7 completed, 4 in progress, 1 never finaled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued Jun 2026 | 231 30th St | interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer.Details
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and dryer. | $82,000 |
| Jan 21, 2026 | In progress issued Jan 2026 | 2262 Filbert St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 700 12th Av | unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances.Details
unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances. | $15,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 2247 Clement St | revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building.Details
revision to bpa#2024-1002-2180: kitchen and bathroom remodel. adding: structural beam in kitchen & correction of building use: 1-sfd and 1- commercial use at front of building. | |
| Oct 2, 2024 | In progress issued Oct 2024 | 2247 Clement St | remodel kitchen and bathroom no layout changesDetails
remodel kitchen and bathroom no layout changes | $39,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 581 14th Av | unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal.Details
unit#12: remodel one kitchen and one bathroom no lay-out changes or wall removal. | $35,000 |
| Jan 10, 2024 | Completed final sign-off May 2024 | 581 14th Av | unit#2: remodel one kitchen and one bathroom no lay-out changesDetails
unit#2: remodel one kitchen and one bathroom no lay-out changes | $35,000 |
| May 8, 2023 | Completed final sign-off Jan 2024 | 2147 Mason St | remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with newDetails
remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with new | $4,300 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 200 Brannan St | #108: replace kithen cabinets, run 220 w for new stove, add recess light on kitchen, install new hardwood floor. non structural.Details
#108: replace kithen cabinets, run 220 w for new stove, add recess light on kitchen, install new hardwood floor. non structural. | $21,000 |
| Jul 22, 2021 | Never finaled issued Jul 2021, no final | 241 Nevada St | replace kitchen cabinets, replace countertops, install new ceiling lights, rpelace hardwood floor.Details
replace kitchen cabinets, replace countertops, install new ceiling lights, rpelace hardwood floor. | $10,500 |
| Jul 29, 2020 | Completed final sign-off Dec 2020 | 2736 44th Av | remodel kitchen & bathroom, no lay-out changesDetails
remodel kitchen & bathroom, no lay-out changes | $25,000 |
| Sep 30, 2019 | Completed final sign-off Jun 2022 | 58 Leland Av | commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchenDetails
commercial t.i. limited restaurant w/ accessory catering. demo (e) millwork, walls, finishes, grocery. (n) non-structural partition. (n) low wall, millwork, (n) equipment, finishes, commercial kitchen | $110,000 |