Block 1039, lot 035
36 Palm Ave
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 2,980 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 36 Palm Av | Tesla Energy Operations | solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | revision - s2026081070Details
solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | revision - s2026081070 | $15,000 |
| Aug 24, 2026 | In progress issued Sep 2026 | 36 Palm Av | Tesla Energy Operations | solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.50 kwh each in capacity, ess units will not be closer than 3 feet | install 5.04 kw pv syDetails
solar permit: installing 12 solar pv modules, 420 watts per module, total no. of rating 5.04 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.50 kwh each in capacity, ess units will not be closer than 3 feet | install 5.04 kw pv sy | $24,748 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 36 Palm Av | Mireles Construction Inc | remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft.Details
remodel bathroom in kind. no moving walls. no layout changes. approx. 40 sq ft. | $29,000 |
| May 11, 2022 | Completed final sign-off Jan 2024 | 36 Palm Av | North Dream Construction Inc | deck minor dryrot repair, less than 50% of rear deck. replace wood beams with galv. steeel, front & sides reattach glass railingDetails
deck minor dryrot repair, less than 50% of rear deck. replace wood beams with galv. steeel, front & sides reattach glass railing | $10,000 |
| Aug 22, 2014 | Completed final sign-off Mar 2015 | 36 Palm Av | Brian Mac Namara Construction | remove treads and risers for waterproffing. remove (e) front steps. repair water proof membrane and replace existing stairs. maher n/a.Details
remove treads and risers for waterproffing. remove (e) front steps. repair water proof membrane and replace existing stairs. maher n/a. | $5,000 |
| Sep 9, 2013 | Never finaled issued Feb 2014, no final | 36 Palm Av | L & H Construction Enterprises Inc. | demo of existing deck & const. of new deck (in rear). compliance with ordinance no. 155-13 not required. excavation < 50 cu.ydDetails
demo of existing deck & const. of new deck (in rear). compliance with ordinance no. 155-13 not required. excavation < 50 cu.yd | $5,000 |
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 36 Palm Av | L & H Construction Enterprises Inc. | minor interior work- new cabinet, new tub, new electrical, new fire place, interior elevations as outlined on page #2Details
minor interior work- new cabinet, new tub, new electrical, new fire place, interior elevations as outlined on page #2 | $35,000 |
| Apr 26, 2006 | Completed final sign-off Apr 2006 | 36 Palm Av | The Toboni Group | legalize rec room and bathroom at garage levelDetails
legalize rec room and bathroom at garage level | $44,000 |
| Dec 20, 2005 | Completed final sign-off Apr 2006 | 36 Palm Av | voluntary foundatin upgrade full basement/garage. no change in use.Details
voluntary foundatin upgrade full basement/garage. no change in use. | $35,000 | |
| Nov 18, 2005 | Completed final sign-off Apr 2006 | 36 Palm Av | renovate baths and kitchen, tile, fixtures, lighting and paintDetails
renovate baths and kitchen, tile, fixtures, lighting and paint | $150,000 | |
| Aug 2, 2005 | Completed final sign-off Sep 2005 | 36 Palm Av | remove all components of illegal 1st floor unit including kitchen sink, cabinets, stove, ref,Details
remove all components of illegal 1st floor unit including kitchen sink, cabinets, stove, ref, | $2,500 | |
| Dec 13, 2004 | Never finaled issued Dec 2004, no final | 36 Palm Av | sidewalk and street spaceDetails
sidewalk and street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- L & H Construction Enterprises Inc. (2), Tesla Energy Operations (2), Brian Mac Namara Construction, Mireles Construction Inc, North Dream Construction Inc, The Toboni Group
- Architects
- James Caldwell (2)