Block 3779, lot 018
732 Brannan St
- City’s use
- Industrial
- Built
- 1906
- Stories
- 2
- Rooms
- 6 bathrooms
- Building
- 17,624 sq ft
- Lot
- 8,812 sq ft
- Zoning
- SLI
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 732 Brannan St | Brennan Strong Hold Construction Inc | 1st floor only: furnish and install 4 new fan coil units reusing existing heat pump. furnish and install new energy recovery ventillator. furnish 2 new mini split heat pump systemDetails
1st floor only: furnish and install 4 new fan coil units reusing existing heat pump. furnish and install new energy recovery ventillator. furnish 2 new mini split heat pump system | $25,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 732 Brannan St | Brennan Strong Hold Construction Inc | renovation of interior office space, installation of new steel stair, installation of new non-structural partitions, and installation of new light fixtureDetails
renovation of interior office space, installation of new steel stair, installation of new non-structural partitions, and installation of new light fixture | $985,500 |
| May 7, 2026 | In progress issued Aug 2026 | 732 Brannan St | Brennan Strong Hold Construction Inc | renovation of exterior facade: refruburisment of one storefront door, removal of one store front door, replacement of 2 mandoors with 1 roll-up door and installation of new mandoor.Details
renovation of exterior facade: refruburisment of one storefront door, removal of one store front door, replacement of 2 mandoors with 1 roll-up door and installation of new mandoor. | $42,500 |
| Mar 19, 2026 | In progress filed Mar 2026, not yet issued | 732 Brannan St | Cal C A D E Construction Inc | soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work.Details
soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work. | $11,200 |
| Jul 13, 2023 | Completed final sign-off Oct 2024 | 732 Brannan St | Cal C A D E Construction Inc | voluntary accessibility upgrade to (e) 1st & 2nd fl toilet rooms. install new plumbing fixtures, grab bar & toilet rm accessories. alter e) employee break rm: new counter, cabinets, remove non structural partitions. no exterior, no catering in kitchenDetails
voluntary accessibility upgrade to (e) 1st & 2nd fl toilet rooms. install new plumbing fixtures, grab bar & toilet rm accessories. alter e) employee break rm: new counter, cabinets, remove non structural partitions. no exterior, no catering in kitchen | $130,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 732 Brannan St | Wedge Roofing, Inc | reroofingDetails
reroofing | $15,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brennan Strong Hold Construction Inc (3), Cal C A D E Construction Inc (2), Wedge Roofing, Inc
- Architects
- Kevin Skiles (3), Stanley Teng
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.