Clarity Construction Group
- Based in
- San Jose
- On San Francisco permits
- May 2024 to Aug 2026
- Last 24 months
- 12 permits filed
13 permits since 2000: 4 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Sep 2026 | 370 Edinburgh St | remodel (e) main floor. add new powder room. keep existing beam.Details
remodel (e) main floor. add new powder room. keep existing beam. | $10,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 2001 48th Av | revision to 202508193348. exterior fire place vent location, window size change. structural change due to the existing site conditionsDetails
revision to 202508193348. exterior fire place vent location, window size change. structural change due to the existing site conditions | |
| Jul 28, 2026 | In progress issued Jul 2026 | 4650 Irving St | existing kitchen remodel including new appliances, cabinet & island space. new powder room with sink & toilet. half bathroom remodel including new sink, toilet & shower. total area of remodel 380 sq. ft.Details
existing kitchen remodel including new appliances, cabinet & island space. new powder room with sink & toilet. half bathroom remodel including new sink, toilet & shower. total area of remodel 380 sq. ft. | $45,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 1600 Webster St | like for like bathroom remodel, no structural changes, replace toilet, vanity sink, fan, upgrade mep to code as neededDetails
like for like bathroom remodel, no structural changes, replace toilet, vanity sink, fan, upgrade mep to code as needed | $15,000 |
| May 27, 2026 | In progress issued Jun 2026 | 666 28th St | 1/f: interior remodel for one (e) bathroom at 180 sq ft. no exterior work. no structural work. adding a bedroom door.Details
1/f: interior remodel for one (e) bathroom at 180 sq ft. no exterior work. no structural work. adding a bedroom door. | $25,000 |
| May 18, 2026 | Completed final sign-off Aug 2026 | 1923 32nd Av | add 290 sq ft roof deck to existing roof. existing access door and guardrailing to remain.Details
add 290 sq ft roof deck to existing roof. existing access door and guardrailing to remain. | $20,000 |
| Nov 21, 2025 | Completed final sign-off May 2026 | 1704 Broderick St | bathroom remodel (remove wall between toilet-room to bathroom. frame new walk-in shower and install plumbing - install new 1 sink, vanity and toilet. close the toilet room door. change to opening at the bathroom door. upgrade m.e.p. to code.Details
bathroom remodel (remove wall between toilet-room to bathroom. frame new walk-in shower and install plumbing - install new 1 sink, vanity and toilet. close the toilet room door. change to opening at the bathroom door. upgrade m.e.p. to code. | $25,000 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 1505 La Salle Av | master bathroom remodel no structual changes like for like 62 sq ft. showerDetails
master bathroom remodel no structual changes like for like 62 sq ft. shower | $20,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 290 San Carlos St | apt 3: two bathrooms remodel, like for like. no structural changes. master - shower 50sqft. hallway - tub 35sqft. no removal of wallsDetails
apt 3: two bathrooms remodel, like for like. no structural changes. master - shower 50sqft. hallway - tub 35sqft. no removal of walls | $34,000 |
| Sep 9, 2025 | In progress issued Apr 2026 | 2001 48th Av | add roof deck and enclosed 3rd story room to (e) 2-story home. add 2 horizontal extensions that are not subject to 3.11 notification.Details
add roof deck and enclosed 3rd story room to (e) 2-story home. add 2 horizontal extensions that are not subject to 3.11 notification. | $600,000 |
| Jun 25, 2025 | Expired or cancelled suspend Sep 2026 | 3829 25th St | add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry.Details
add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry. | $995,900 |
| May 15, 2025 | In progress issued May 2025 | 220 Hartford St | bathroom remodel. install new 1 sink vanity and toilet. upgrade mep to code. no structural changes like for like.Details
bathroom remodel. install new 1 sink vanity and toilet. upgrade mep to code. no structural changes like for like. | $30,000 |
| May 9, 2024 | In progress issued May 2024 | 1101 Green St | unit 1501- kitchen and bathroom remodel to include (4) recess lights in office, relocate subpanel and add quarter shut off valve in bathroomDetails
unit 1501- kitchen and bathroom remodel to include (4) recess lights in office, relocate subpanel and add quarter shut off valve in bathroom | $85,000 |